Planning application
26/00465/FUL
4D Moor Drove Histon Cambridgeshire CB24 9AN
Proposal
Change of use from green space to partial residential including a new access road and the creation of a day room/utility block, with 2no. static caravans, parking for 2no. touring caravans and parking for 4no. vehicles.
As published by the council, reference 26/00465/FUL
Timeline
Dates from the published record
-
5 Feb 2026
Received by South Cambridgeshire
-
19 Feb 2026
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with South Cambridgeshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/03527/FUL Awaiting decision
3C Moor Drove Histon Cambridgeshire CB24 9AN
Change of use from green space to partial residential including new scheme and the creation of a day room, 2 No. static caravans, parking for 2 touring caravans and 4 No. Vehicles.
-
25/03512/FUL Awaiting decision
2B Moor Drove Histon Cambridgeshire CB24 9AN
Change of use from green space to partial residential including new scheme and the creation of a day room, 2 No. static caravans, parking for 2 touring caravans and 4 No. Vehicles.
-
26/02196/S73 Awaiting decision
156 Cottenham Road Histon Cambridgeshire CB24 9ET
S73 to vary condition 3 (Materials) of planning permission 26/01343/HFUL (Demolition of existing garage and side extension. Part single, part two storey side and rear extension. Erection of detached garage to front of dwelling. Cladding to existing front elevation and alterations to fenestration. Addition of 1no. rooflight to rear elevation) to change the materials from a brick finish to an off white render.
-
26/02037/FUL Awaiting decision
Land West Of Moor Drove Histon CB24 9AN
Retrospective change of use of vacant green space to 13 No. traveller plots
-
26/02738/CLUED Awaiting decision
Bromlea Cottenham Road Histon Cambridgeshire CB24 9ET
Certificate of lawfulness under S191 for confirmation of the residential curtilage.
Other full applications applications
In South Cambridgeshire
-
26/02779/FUL Awaiting decision
3 Royston Road Whittlesford Cambridgeshire CB22 4NW
3 bedroom replacement self build dwelling following demolition of existing bungalow.
-
26/02151/FUL Granted
3 Comberton Road Barton Cambridgeshire CB23 7BA
Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.
-
26/01627/FUL Granted
Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH
Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.
-
26/02708/FUL Awaiting decision
Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD
Partial demolition of existing collapsed wall and erection of a new wall.
-
25/02739/FUL Granted
Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ
Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.