Skip to content
PlanIndex Get alerts
Menu

Planning application

25/04863/FUL

Land Adjacent To Spring House Church Lane Sawston Cambridgeshire

Awaiting decision South Cambridgeshire Full Application

Proposal

Erection of a single self-build dwelling and associated infrastructure and works.

As published by the council, reference 25/04863/FUL

Timeline

Dates from the published record

  1. 15 Dec 2025

    Received by South Cambridgeshire

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with South Cambridgeshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/04239/HFUL Granted

    35 Church Lane Sawston CB22 3JR

    Proposed single storey rear extension, front bay window infill and garage re-roofing

    14 Oct 2020 89m away Householder
  • 26/02214/HFUL Awaiting decision

    16 St Marys Road Sawston Cambridgeshire CB22 3SP

    Single storey side/rear extension and internal alterations

    11 Jun 2026 97m away Householder
  • 22/02832/HFUL Granted

    15 Hayfield Avenue Sawston Cambridgeshire CB22 3JZ

    Demolish existing front and rear single storey extensions and erect a front extension including a porch and rear extension

    22 Jun 2022 237m away Householder
  • 26/01478/PRIOR Granted

    37 - 39 High Street Sawston Cambridgeshire CB22 3BG

    Conversion of existing first floor space into two separate dwellings.

    17 Apr 2026 328m away Prior approval
  • 26/01871/CL2PD Withdrawn

    11 Camping Close Sawston Cambridgeshire CB22 3HP

    Certificate of lawfulness under S192 for single storey rear extension and 2no. rooflights.

    18 May 2026 339m away Lawful development
  • 26/01941/LBC Withdrawn

    54 High Street Sawston Cambridgeshire CB22 3BG

    Replacement of the sashes/casements of windows and rebuild of three dormers

    22 May 2026 349m away Heritage and listed buildings

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications