Planning application
Northstowe Proposed Development Site Rampton Road Longstanton Cambridgeshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reserved Matters application for a primary road and associated footways, cycleways and earthworks, including details of access, appearance, landscaping, layout and scale following outline permission 20/02171/OUT, and the related partial discharge of conditions 1 (Detailed Reserved Matters Submission), 8 (Compliance with Environmental Statement), 11 (Reserved Matters Justification), 12 (Reserved Matters Details), 13 (Landscaping and Design Details), 23 (landscape Management and Maintenance Plan), 28 (Sustainability Strategy), 30 (Renewable Energy Statement), 35 (Surface Water Details) and 65 (External Lighting) pursuant to outline planning permission 20/02171/OUT.
As published by the council, reference 25/04840/REM
Application record
- Reference
- 25/04840/REM
- Type
- Approval of Reserved Matters
- Status
- Awaiting decision
- Received
- 12 Dec 2025
- Validated
- 12 Dec 2025
- Ward
- Longstanton
- Parish
- Northstowe Town Council
Site history
Applications at this address on the South Cambridgeshire register
This site has had 2 applications since 2020: 1 approved, 0 refused.
-
S/3499/19/COND2 Granted
Northstowe Proposed Development Site Rampton Road Longstanton Cambridgeshire
Submission of details required by condition 2 (Materials) of planning permission S/3499/19/RM
Timeline
Dates from the published record
-
12 Dec 2025
Received by South Cambridgeshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Cambridgeshire took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 20/02171/OUT (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
224 documents on file for this application
- EOT REQUEST
- COUNTY TRANSPORT
- LLFA
- DRAINAGE STRATEGY SHEET 1 OF 5
- DRAINAGE STRATEGY SHEET 2 OF 5
- DRAINAGE STRATEGY SHEET 3 OF 5
- DRAINAGE STRATEGY SHEET 4 OF 5
- DRAINAGE STRATEGY SHEET 5 OF 5
- SURFACE WATER CATCHMENT PLAN
- DRAINAGE STRATEGY PLAN
- OVERLAND FLOOD ROUTES
- SWALE PLAN
- SURFACE WATER TECHNICAL NOTE
- SURFACE WATER TECHNICAL NOTE - APPENDIX C HYDRAULIC CALCULATIONS
- FILE COPY OF AMENDMENT LETTER
- EOT REQUEST
- HIGHWAYS CONDITION RECOMENDATION
- EOT REQUEST
- EOT REQUEST
- FURTHER INFORMATION ON JUNCTION MODELLING
- LLFA
- HIGHWAYS DEPT
- HIGHWAYS DEPT
- URBAN DESIGN
- BNE LANDSCAPE
- DRAINAGE STRATEGY. SHEET 1 OF 5
- DRAINAGE STRATEGY. SHEET 2 OF 5
- DRAINAGE STRATEGY. SHEET 3 OF 5
- DRAINAGE STRATEGY. SHEET 4 OF 5
- DRAINAGE STRATEGY. SHEET 5 OF 5
- VEHICLE TRACKING. SHEET 1 OF 6
- VEHICLE TRACKING. SHEET 3 OF 6
- VEHICLE TRACKING. SHEET 4 OF 6
- VEHICLE TRACKING. SHEET 5 OF 6
- VEHICLE TRACKING. SHEET 6 OF 6
- VEHICLE TRACKING. SHEET 2 OF 6
- SURFACE WATER CATCHMENT PLAN
- DRAINAGE STRATEGY PLAN
- OVERLAND FLOOD ROUTES
- SWALE PLAN
- LANDSCAPE GENERAL ARRANGEMENT
- LANDSCAPE GENERAL ARRANGEMENT SHEET 1 OF 4
- LANDSCAPE GENERAL ARRANGEMENT SHEET 2 OF 4
- GENERAL ARRANGEMENT
- GENERAL ARRANGEMENT SHEET 1 OF 5
- GENERAL ARRANGEMENT SHEET 2 OF 5
- GENERAL ARRANGEMENT SHEET 3 OF 5
- GENERAL ARRANGEMENT SHEET 4 OF 5
- GENERAL ARRANGEMENT SHEET 5 OF 5
- TASK INFORMATION DELIVERY PLAN
- RMA RESPONSE LETTER (WITH SCHEDULE)
- DESIGN CODE COMPLIANCE STATEMENT
- SUSTAINABILITY STATEMENT
- LANDSCAPE PLANTING SCHEDULE
- OVERARCHING HARD AND SOFT LANDSCAPE PALETTE
- LANDSCAPE SPECIFICATION
- EIA STATEMENT OF CONFORMITY
- RESERVED MATTERS APPLICATION BOUNDARIES
- REPLIES TO COMMENTS FROM LLFA
- RSA REPLIES
- TASK INFORMATION DELIVERY PLAN
- EOT REQUEST
- TRANSPORT ASSESSMENT TEAM
- URBAN DESIGN OFFICER COMMENTS
- ARCHAEOLOGY COMMENTS
- ENVIRONMENT AGENCY
- NORTHSTOWE TOWN COUNCIL COMMENTS
- LANDSCAPE
- ECOLOGY
- TREES
- ANGLIAN WATER RESPONSE
- ACTIVE TRAVEL ENGLAND
- ACTIVE TRAVEL ENGLAND
- LOCAL HIGHWAY AUTHORITY
- LOCAL HIGHWAY AUTHORITY
- SUSTAINABILITY
- CLIMATE, WASTE & ENVIRONMENT
- ENVIRONMENTAL HEALTH
- LOCAL LEAD FLOOD AUTHORITY COMMENTS
- EIA STATEMENT OF CONFORMITY
- PROPOSED LANDSCAPE CROSS SECTION SHEET 2 OF 2
- PROPOSED LANDSCAPE CROSS SECTION SHEET 1 OF 2
- LANDSCAPE GENERAL ARRANGEMENT SHEET 4 OF 4
- LANDSCAPE GENERAL ARRANGEMENT SHEET 3 OF 4
- PROPOSED LANDSCAPE GENERAL ARRANGEMENT SHEET 2 OF 4
- PROPOSED LANDSCAPE GENERAL ARRANGEMENT SHEET 1 OF 4
- WASTE - SHARED SERVICE
- ACKNOWLEDGEMENT LETTER
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- SITE NOTICE
- BIODIVERSITY NET GAIN CALCULATIONS
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- THE BIODIVERSITY METRIC CALCULATION TOOL
- PLANNING, DESIGN AND ACCESS STATEMENT
- FIGURE 3-1 STRATEGIC ENGINEERING RMA BASELINE HABITATS
- COVER LETTER
- PHASE 3A KEY STAGE 1 RMA BOUNDARY
- TRANSPORT ASSESSMENT
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- SUSTAINABILITY STATEMENT
- TREE PIT DETAILS
- LANDSCAPE PLANTING SCHEDULE
- OVERARCHING HARD AND SOFT LANDSCAPE PALETTE
- DETAILED WASTE MINIMISATION AND MANAGEMENT PLAN
- SITE LOCATION PLAN
- GENERAL ARRANGEMENT
- GENERAL ARRANGEMENTS SHEET 1 OF 5
- GENERAL ARRANGEMENT SHEET 2 OF 5
- GENERAL ARRANGEMENT SHEET 3 OF 5
- GENERAL ARRANGEMENT SHEET 4 OF 5
- GENERAL ARRANGEMENT SHEET 5 OF 5
- DRAINAGE DETAILS SHEET 1 OF 6
- DRAINAGE STRATEGY SHEET 1 OF 5
- DRAINAGE STRATEGY 2 OF 5
- DRAINAGE STRATEGY SHEET 3 OF 5
- DRAINAGE STRATEGY 4 OF 5
- DRAINAGE STRATEGY 5 OF 5
- DRAINAGE DETAILS 2 OF 5
- STORM WATER CATCHMENT PLAN
- DRAINAGE STRATEGY PLAN
- DRAINAGE ADOPTION PLAN
- HIGHWAYS ADOPTION PLAN
- DRAIAGE DETAILS 3 OF 6
- DRAINAGE DETAILS 4 OF 6
- OVERLAND FLOOD ROUTES
- TYPICAL CROSS SECTION
- DRAINAGE DETAILS 5 OF 6
- DRAINAGE DETAILS 6 OF 6
- FOULD WATER CATCHMENT PLAN
- SURFACE WATER AND FOUL WATER DRAINAGE STRATEGY
- STORM WATER CATCHMENT PLAN
- SURFACE WATER AND FOUL WATER DRAINAGE STRATEGY - APPENDIX H ANGLIAN WATER CONSULTATION RESPONSE
- PROPOSED UTILITIES LAYOUT
- EXISTING UTILITIES
- EXISTING LEVELS 1 OF 5
- PROPOSED LEVELS 1 OF 5
- PROPOSED LEVELS SHEET 2 OF 5
- PROPOSED LEVELS 3 OF 5
- PROPOSED LEVELS 4 OF 5
- PROPOSED LEVELS 5 OF 5
- EXISTING LEVELS 2 OF 5
- EXISTING LEVELS 3 OF 5
- EXISTING LEVELS 4 OF 5
- EXISTING LEVELS 5 OF 5
- LONG SECTIOS 2 OF 3
- LONG SECTIONS 3 OF 3
- LONG SECTIONS 1 OF 3
- PAVING LAYOUT 1 OF 5
- PAVING LAYOUT 2 OF 5
- PAVING LAYOUT 3 OF 5
- PAVING LAYOUT 4 OF 5
- PAVING LAYOUT 5 OF 5
- VEHICLE TRACKING 1 OF 5
- VEHICLE TRACKING 2 OF 5
- VEHICLE TRACKING 3 OF 5
- VEHICLE TRACKING 4 OF 5
- VEHICLE TRACKING 5 OF 5
- HIGHWAY DETAILS 1 OF 2
- HIGHWAY DETAILS 2 OF 2
- HIGHWAY SECTIONS 1 OF 2
- HIGHWAY SECTIONS 2 OF 2
- KERBING LAYOUT 1 OF 5
- KERBING LAYOUT 2 OF 5
- KERBING LAYOUT 3 OF 5
- KERBING LAYOUT 4 OF 5
- KERBING LAYOUT 5 OF 5
- LIGHTING COLUMNS 1 OF 5
- LIGHT COLUMNS 2 OF 5
- LIGHTING COLUMNS 3 OF 5
- LIGHTING COLUMNS 4 OF 5
- LIGHTING COLUMN 5 OF 5
- LIGHTING STRATEGY
- GENERAL ARRANGEMENT
- GENERAL ARRANAGEMENT 1 OF 4
- SITE SPECIFIC CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN PAGE 1-50
- SITE SPECIFIC CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN PAGE 51-79
- LANDSCAPE SPECIFICATION PAGE 1-50
- LANDSCAPE SPECIFICATION PAGE 51-90
- LANDSCAPE SPECIFICATION PAGE 1-50
- LANDSCAPE SPECIFICATION PAGE 51-91
- ARBORICULTURAL IMPACT ASSESSMENT PAGE 1-50
- ARBORICULTURAL IMPACT ASSESSMENT PAGE 51-97
- NOR-ARC-P3-050-RP-C-00002-P01-KP1 SW PART-3 PAGE 1
- NOR-ARC-P3-050-RP-C-00002-P01-KP1 SW PART-3 PAGE 2
- NOR-ARC-P3-050-RP-C-00002-P01-KP1 SW PART-3 PAGE 3
- NOR-ARC-P3-050-RP-C-00002-P01-KP1 SW PART-3 PAGE 4-35
- GENERAL ARRANGEMENT
- SURFACE WATER AND FOUL WATER DRAINAGE STRATEGY - APPENDIX F WATER QUALITY CALCULATIONS FOR SOUTH AND NORTH CATCHMENT
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE R PHASE 1 AND 2 AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE S PHASE 1 AND 2 PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE T PHASE 3A AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE U PHASE 3 A PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE V PHASE 3B AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE W PHASE 3B PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE X CUMULATIVE SCENARIO PHASE 3A AND B AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE Y CUMULATIVE SCENARIO PHASE 3A AND B PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE Z PHASE 1 AND 2 AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AA CUMULATIVE SCENARIO PHASE 3 A AND B AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AB CUMULATIVE SCENARIO PHASE 3A AND B PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AC PHASE 1 AND 2 PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AD PHASE 3A AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AE PHASE 3A PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AF PHASE 3B AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AG PHASE 3B PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AH TOTAL NORTHSTOWE AM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AI TOTAL NORTHSTOWE PM PEAK TRIP DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AJ TOTAL NORTHSTOWE AM PEAK DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX B FIGURE AK TOTAL NORTHSTOWE PM PEAK DISTRIBUTION
- TRANSPORT ASSESSMENT - APPENDIX C FULL MODEL REPORTS PAGE 1-50
- TRANSPORT ASSESSMENT - APPENDIX C FULL MODEL REPORTS PAGE 51-108
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided reserved matters applications in a median of 152 days. More in our guide to how long planning decisions take.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Northstowe Phase 3A Rampton Road Longstanton Cambs
Reserved Matters application for a highway junction and associated footway and cycleway. The application includes Reserved Matters details of access, appearance, landscaping, layout and scale and the related partial discharge of conditions 1, 11, 12, 13, 23, 28, 30, 35 and 65, pursuant to outline planning permission 20/02171/OUT.
Granted Reserved matters 45 docs
Other reserved matters applications
In South Cambridgeshire
-
26/02776/REM Granted
7 Honeysuckle Close Caxton Cambridgeshire CB23 3BB
Reserved matters application for the layout, scale, appearance and landscaping of plot 7 following outline planning permission of 20/04704/OUT (Outline planning for the erection of up to nine self-build/custom-build dwellings and associated garaging with some matters reserved except for access from Rosemary Greene Close).
-
26/03515/REM Awaiting decision
Northstowe Phase 2 Station Road Longstanton Cambridgeshire
Reserved matters application for the approval of access, appearance, landscaping, layout and scale of a new access road and associated footways connecting Stirling Road to the proposed Town Hub, together with associated landscaping, highway infrastructure and parking following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise) and 53 (Parking Management Strategy).
-
26/03440/REM Awaiting decision
Northstowe Phase 2 Station Road Longstanton Cambridgeshire
Reserved matters application for the approval of access, appearance, landscaping, layout and scale for Strategic Landscaping works to Pillbox Pool following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 30 (Management of Pillboxes), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise).
-
26/03359/REM Awaiting decision
Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG
Reserved matters application for approval of appearance, landscaping, layout and scale for the Installation of 1no. informal natural grass pitch and 2no. Multi-Use Games Areas enclosed with ball stop fencing for 2no. tennis courts (with line marking to accommodate netball and pickleball) together with associated landscaping, equipment storage and provision of new pathway to existing Woodland Walk following outline planning permission 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) as varied by 26/01599/S73 (S73 to vary condition 3 (approved drawings) of ref: 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) to update parameter landscape and land use plan.)
-
26/03381/REM Awaiting decision
9 Soule Croft Gamlingay Cambridgeshire SG19 3FZ
Plot 9 - Reserved matters application for access, appearance, landscaping, layout and scale for the construction of a self/custom build dwelling following outline planning permission 24/01080/OUT (Outline planning application with all matters reserved (except for access, layout of roads and plots) for nine self/custom build residential dwellings (replacement of planning permission S/3170/17/OL)