Skip to content
PlanIndex Get alerts
Menu

Planning application

Hooks Mill Potton Road Guilden Morden Cambridgeshire SG8 0LE

Awaiting decision South Cambridgeshire 25/04418/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Reconstruction of the existing barns to form 1 No. self/custom build dwelling.

As published by the council, reference 25/04418/LBC

Application record

Reference
25/04418/LBC
Type
Listed Building Consent
Status
Awaiting decision
Received
13 Nov 2025
Validated
20 Nov 2025
Ward
The Mordens
Parish
Guilden Morden CP
Postcode
SG8 0LE

Site history

Applications at this address on the South Cambridgeshire register

This site has had 2 applications since 2025.

  • 25/04417/FUL Awaiting decision

    Hooks Mill Potton Road Guilden Morden Cambridgeshire SG8 0LE

    Reconstruction of the existing barns to form 1 No. self/custom build dwelling.

    Submitted 13 Nov 2025 Full applications

Timeline

Dates from the published record

  1. 13 Nov 2025

    Received by South Cambridgeshire

  2. 20 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    South Cambridgeshire took a median of 56 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 25/04417/FUL (Awaiting decision)

Who's behind it

Company information only, from the register and Companies House

Inigo Architecture Ltd Agent, an architecture practice registered in Henlow

Active · incorporated 2007 · Henlow

59 applications on PlanIndex · across 23 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

51 documents on file for this application

  • PROPOSED SITE LAYOUT PLAN Drawings · 16 Jul 2026
  • PROPOSED ELEVATIONS Drawings · 14 Jul 2026
  • PROPOSED GROUND AND FIRST FLOOR Drawings · 14 Jul 2026
  • AGREEMENT TO CONDITIONS Agent / Applicant Comments · 14 Jul 2026
  • EXISTING SITE SURVEY PLAN AND SITE LOCATION AND BLOCK PLANS Drawings · 14 Jul 2026
  • EOT REQUEST Extension of Time Request · 12 Feb 2026
  • BNE - CONSERVATION Consultee Comments · 27 Jan 2026
  • PROPOSED GROUND AND FIRST FLOOR Superseded Documents · 16 Jan 2026
  • PROPOSED ELEVATIONS Superseded Documents · 15 Jan 2026
  • PROPOSED SITE LAYOUT PLAN Superseded Documents · 15 Jan 2026
  • BARN 3 EXISTING PLANS AND ELEVATIONS Drawings · 15 Jan 2026
  • BARN 2 EXISTING PLANS AND ELEVATIONS Drawings · 15 Jan 2026
  • BARN 1 EXISTING PLANS AND ELEVATIONS Drawings · 15 Jan 2026
  • EXISTING SITE SURVEY PLAN AND SITE LOCATION AND BLOCK PLANS Superseded Documents · 15 Jan 2026
  • PARISH Consultee Comments · 11 Dec 2025
  • BNE - CONSERVATION Consultee Comments · 04 Dec 2025
  • HISTORIC ENGLAND Consultee Comments · 25 Nov 2025
  • INVALID LETTER Application Information · 20 Nov 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 20 Nov 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 20 Nov 2025
  • SITE NOTICE Application Press/Site Notices · 20 Nov 2025
  • FEE CALCULATION Application Information · 13 Nov 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 13 Nov 2025
  • K&M TRAFFIC SURVEY Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEYS Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEYS Application Survey / Assessment / Statement · 13 Nov 2025
  • VEHICLE SURVEY Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEY SOUTH SITE Application Survey / Assessment / Statement · 13 Nov 2025
  • VEHICLE SURVEY (NORTH SITE) Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEY SOUTH SITE Application Survey / Assessment / Statement · 13 Nov 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Application Information · 13 Nov 2025
  • DESIGN ACCESS HERITAGE STATEMENT AND PARKING STRATEGY Design and Access Statement · 13 Nov 2025
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Application Survey / Assessment / Statement · 13 Nov 2025
  • EXISTING SITE SURVEY SITE LOCATION AND BLOCK PLAN Superseded Documents · 13 Nov 2025
  • BARN 1 EXISTING PLANS AND ELEVATIONS Superseded Documents · 13 Nov 2025
  • BARN 2 EXISTING PLANS AND ELEVATIONS Superseded Documents · 13 Nov 2025
  • BARN 3 EXISTING PLANS AND ELEVATIONS Superseded Documents · 13 Nov 2025
  • EXISTING ELEVATIONS Drawings · 13 Nov 2025
  • PROPOSED SITE LAYOUT PLAN Superseded Documents · 13 Nov 2025
  • PROPOSED GROUND AND FIRST FLOOR Superseded Documents · 13 Nov 2025
  • PROPOSED ELEVATIONS Superseded Documents · 13 Nov 2025
  • MATERIALS SCHEDULE Application Information · 13 Nov 2025
  • PRE APPLICATION LETTER Application Information · 13 Nov 2025
  • SCHEME OF ECOLOGICAL ENHANCEMENT Application Information · 13 Nov 2025
  • ARBORICULTURAL IMPACT ASSESSMENT AND PRELIMINARY METHOD Application Survey / Assessment / Statement · 13 Nov 2025
  • PAGE 1-50 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEYS Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEYS Application Survey / Assessment / Statement · 13 Nov 2025
  • K&M TRAFFIC SURVEYS SOUTH SITE Application Survey / Assessment / Statement · 13 Nov 2025
  • SITE PHOTOGRAPHS Photographs · 13 Nov 2025
  • K&M TRAFFIC SURVEYS Application Survey / Assessment / Statement · 13 Nov 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with South Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year South Cambridgeshire decided heritage and listed building applications in a median of 61 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Cambridgeshire

  • 26/03070/LBC Granted

    8 High Street Fulbourn Cambridgeshire CB21 5DH

    Repairs to Roofs, Doors, Windows, External Render, Insulation within timber frame to External Walls, Removal of Shutters and Replacement of Modern Windows.

    Received 12 Aug, published by the council 14 Aug 2026 Heritage and listed buildings
  • 26/02858/LBC Granted

    28 High Street Croxton Cambridgeshire PE19 6SX

    Replace windows and doors.

    Received 29 Jul, published by the council 31 Jul 2026 Heritage and listed buildings
  • 26/03720/LBC Awaiting decision

    Kings Barn High Street Horningsea Cambridgeshire CB25 9JG

    Change of use from 1 No. residential unit to 2 No residential units. Creation of a separate 3 bedroom single storey dwelling with both vehicular and pedestrian access from High Street.

    Received 1 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/03703/LBC Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.

    Received 30 Sep, published by the council 8 Oct 2026 Heritage and listed buildings
  • 26/03698/LBC Awaiting decision

    Girton College, Cloisters Court Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of 2no. donor recognition plaques to 2no. external walls within Cloister Court at Girton College.

    Received 30 Sep, published by the council 4 Oct 2026 Heritage and listed buildings