Skip to content
PlanIndex Get alerts
Menu

Planning application

Waterbeach Barracks Proposed Development Site Denny End Road Waterbeach Cambridgeshire

Granted South Cambridgeshire 25/03926/FUL Full Application

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full planning approval is sought for: Highways improvement works comprising the realignment of the A10 including carriageway realignment and the construction of a roundabout junction providing access to the Waterbeach Barracks and Airfield site and a spur in a location suitable for the future construction of a road link serving the Travel Hub Waterbeach and Cambridge Guided Busway and all necessary infrastructure works including: the construction of necessary surface water drainage infrastructure, utilities infrastructure, lighting, engineering and land remodelling works, hard and soft landscaping works, tree and hedgerow planting, habitat creation and ecological mitigation measures, all necessary enabling works including tree, hedgerow and vegetation removal, construction site access and works to provide a construction compound, all necessary demolitions, and the relocation of the Grade II Listed Milestone half mile south of Green End junction and Goose Hall

As published by the council, reference 25/03926/FUL

Application record

Reference
25/03926/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Granted Permission
Received
9 Oct 2025
Validated
9 Oct 2025
Decided
8 Jun 2026
Ward
Milton & Waterbeach
Parish
Waterbeach CP
Decision by
Delegated Decision

Site history

Applications at this address on the South Cambridgeshire register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/03927/LBC Granted

    Waterbeach Barracks Proposed Development Site Denny End Road Waterbeach Cambridgeshire

    Relocation of the Grade II Listed Milestone, which lies half mile south of Green End junction and Goose Hall. Associated with A10 Highway Improvement application works (Ref: 25/03926/FUL)

    Decided 8 Jun 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 9 Oct 2025

    Received by South Cambridgeshire

  2. 8 Jun 2026

    Decision issued: Granted Permission

  3. 29 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 25/03927/LBC Granted

    Waterbeach Barracks Proposed Development Site Denny End Road Waterbeach Cambridgeshire

    Relocation of the Grade II Listed Milestone, which lies half mile south of Green End junction and Goose Hall. Associated with A10 Highway Improvement application works (Ref: 25/03926/FUL)

    Decided 8 Jun 2026 Heritage and listed buildings

Who's behind it

Company information only, from the register and Companies House

David Lock Associates Ltd Agent, registered in Milton Keynes

Active · incorporated 1989 · Milton Keynes

389 applications on PlanIndex · across 32 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

156 documents on file for this application

  • EOT REQUEST Extension of Time Request · 08 Jun 2026
  • DECISION NOTICE Application Decision Notice · 08 Jun 2026
  • DELEGATED REPORT Application Committee / Delegated Report · 08 Jun 2026
  • WSK LTD Third Party Comments · 26 May 2026
  • TRANSPORT ASSESSMENT TEAM Consultee Comments · 15 May 2026
  • EOT REQUEST Extension of Time Request · 14 May 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 08 May 2026
  • EOT REQUEST Extension of Time Request · 01 May 2026
  • GENERAL ARRANGEMENT Drawings · 30 Apr 2026
  • GEOMETRY PLAN Drawings · 30 Apr 2026
  • VEHICLE TRACKING- SHEET 6 - BUS Drawings · 30 Apr 2026
  • ROAD MARKING Drawings · 30 Apr 2026
  • COVERING LETTER 28 04 26 - A10 ACCESS FPA Application Information · 30 Apr 2026
  • COVERING LETTER 28 04 26 - A10 ACCESS LBC Application Information · 30 Apr 2026
  • TRO APPLICATION CONFIRMATION Application Information · 30 Apr 2026
  • CCC CORRESPONDENCE IN RELATION TO THE TRO APPLICATION Application Information · 30 Apr 2026
  • STAGE 1 RSA WITH DESIGNERS RESPONSE Application Information · 30 Apr 2026
  • ECOLOGY Consultee Comments · 23 Apr 2026
  • HISTORIC ENGLAND Consultee Comments · 17 Apr 2026
  • LANDSCAPE Consultee Comments · 16 Apr 2026
  • BNE - CONSERVATION Consultee Comments · 14 Apr 2026
  • LLFA Consultee Comments · 10 Apr 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 08 Apr 2026
  • STATUTORY BIODIVERSITY METRIC CALCULATION TOOL Application Information · 31 Mar 2026
  • BNG CONDITION ASSESSMENTS Application Information · 31 Mar 2026
  • A10 ROUNDABOUT GA & PLANTING PLAN Drawings · 31 Mar 2026
  • TREE PIT DETAILS - TYPE C Drawings · 31 Mar 2026
  • TREE PIT DETAILS - TYPE D Drawings · 31 Mar 2026
  • TREE PIT DETAILS - TYPE E Drawings · 31 Mar 2026
  • SOFT LANDSCAPE & ECOLOGY SPECIFICATION Application Information · 31 Mar 2026
  • COVERING LETTER 27 03 26 Application Information · 31 Mar 2026
  • TRANSPORT ASSESSMENT ADDENDUM APPENDIX C Application Information · 31 Mar 2026
  • TRANSPORT ASSESSMENT ADDENDUM Application Information · 31 Mar 2026
  • 5 YEAR LANDSCAPE MAINTENANCE & MANAGEMENT PLAN Application Information · 31 Mar 2026
  • BIODIVERSITY NET GAIN PLAN Application Information · 31 Mar 2026
  • METHOD STATEMENT FOR MILESTONE CONSERVATION AND RE-SITING Application Information · 31 Mar 2026
  • GENERAL ARRANGEMENT Drawings · 31 Mar 2026
  • GENERAL ARRANGEMENT Drawings · 31 Mar 2026
  • GENERAL ARRANGEMENT Drawings · 31 Mar 2026
  • GEOMETRY PLAN Drawings · 31 Mar 2026
  • GEOMETRY PLAN Drawings · 31 Mar 2026
  • GEOMETRY PLAN Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 1 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 2 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 3 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 4 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 5 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 6 Drawings · 31 Mar 2026
  • VISIBLITY PLAN-SHEET 7 Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 1 - REFUSE Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 2 - REFUSE Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 3 - LARGE CAR Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 4 - ARTICULATED VEHICLE Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 5 - OTHER VEHICLE Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 6 - BUS Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 7 - BUS Drawings · 31 Mar 2026
  • VEHICLE TRACKING- SHEET 8 - OTHER VEHICLE Drawings · 31 Mar 2026
  • ROAD MARKING Drawings · 31 Mar 2026
  • ROAD MARKING Drawings · 31 Mar 2026
  • ROAD MARKING Drawings · 31 Mar 2026
  • SITE CLEARANCE PLAN Drawings · 31 Mar 2026
  • SITE CLEARANCE PLAN Drawings · 31 Mar 2026
  • SITE CLEARANCE PLAN Drawings · 31 Mar 2026
  • DRAINAGE STRATEGY Drawings · 31 Mar 2026
  • EOT REQUEST Extension of Time Request · 30 Mar 2026
  • EOT REQUEST Extension of Time Request · 26 Feb 2026
  • EOT REQUEST Extension of Time Request · 31 Dec 2025
  • TRANSPORT ASSESSMENT TEAM COMMENTS Consultee Comments · 18 Nov 2025
  • LANDSCAPE Consultee Comments · 13 Nov 2025
  • BNE - CONSERVATION Consultee Comments · 11 Nov 2025
  • ECOLOGY - ADDITIONAL INFO REQUESTED Consultee Comments · 06 Nov 2025
  • CONTAMINATED LAND Consultee Comments · 06 Nov 2025
  • SUSTAINABILITY Consultee Comments · 03 Nov 2025
  • LOCAL HIGHWAYS AUTHORITY Consultee Comments · 03 Nov 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 31 Oct 2025
  • DRAINAGE Consultee Comments · 29 Oct 2025
  • LOCAL LEAD FLOOD AUTHORITY COMMENTS Consultee Comments · 29 Oct 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 16 Oct 2025
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 16 Oct 2025
  • SITE NOTICE Application Press/Site Notices · 16 Oct 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 09 Oct 2025
  • PLANNING DESIGN AND ACCESS STATEMENT Design and Access Statement · 09 Oct 2025
  • SURFACE WATER STRATEGY Application Survey / Assessment / Statement · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 3 Drawings · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 6 Drawings · 09 Oct 2025
  • ROUNDABOUT EXTERNAL LIGHTING LAYOUT Drawings · 09 Oct 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 09 Oct 2025
  • ARBORICULTURAL PLANNING STATEMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 4 Drawings · 09 Oct 2025
  • BOUNDARY PLAN Drawings · 09 Oct 2025
  • CONSITION ASSESSMENT SHEET Application Survey / Assessment / Statement · 09 Oct 2025
  • PAGE 1-50 CONTAMINATED LAND ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • COVERING LETTE Application Information · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 1 Drawings · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 2 Drawings · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 4 Drawings · 09 Oct 2025
  • CROSS SECTION PLAN-SHEET 5 Drawings · 09 Oct 2025
  • DRAFT BIODIVERSITY NET GAIN ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • DRAFT CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Application Survey / Assessment / Statement · 09 Oct 2025
  • DRAINAGE STRATEGY Drawings · 09 Oct 2025
  • ECOLOGICAL ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • EXTERNAL LIGHTING ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • FEE CALCULATION Application Information · 09 Oct 2025
  • FLOOD RISK ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • GENERAL ARRANGEMENT Drawings · 09 Oct 2025
  • GEOMETRY PLAN Drawings · 09 Oct 2025
  • LANDSCAPE MAINTENANCE AND MANAGEMENT PLAN Application Survey / Assessment / Statement · 09 Oct 2025
  • LEVELS PLAN Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 1 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 2 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 3 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 5 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 6 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 7 Drawings · 09 Oct 2025
  • LONG SECTION PLAN-SHEET 8 Drawings · 09 Oct 2025
  • NORTHERN ARM GENERAL ARRANGEMENT Drawings · 09 Oct 2025
  • NORTHERN ARM GEOMETRY PLAN Drawings · 09 Oct 2025
  • NORTHERN ARM LEVELS PLAN Drawings · 09 Oct 2025
  • NORTHERN ARM ROAD MARKING Drawings · 09 Oct 2025
  • NORTHERN ARM SERVICES PLAN Drawings · 09 Oct 2025
  • NORTHERN ARM SITE CLEARANCE PLAN Drawings · 09 Oct 2025
  • ROAD MARKING Drawings · 09 Oct 2025
  • ROUNDABOUT GA AND PLANTING PLAN Drawings · 09 Oct 2025
  • SERVICES PLAN Drawings · 09 Oct 2025
  • SITE CLEARANCE PLAN Drawings · 09 Oct 2025
  • SITE LOCATION PLAN Drawings · 09 Oct 2025
  • SOFT LANDSCAPE SPECIFICATION Application Information · 09 Oct 2025
  • SOUTERN ARM SITE CLEARANCE PLAN Drawings · 09 Oct 2025
  • SOUTHER ARM GEOMETRY PLAN Drawings · 09 Oct 2025
  • SOUTHERN ARM GENERAL ARRANGEMENT Drawings · 09 Oct 2025
  • SOUTHERN ARM LEVELS PLAN Drawings · 09 Oct 2025
  • SOUTHERN ARM ROAD MARKING Drawings · 09 Oct 2025
  • SOUTHERN ARM SERVICES PLAN Drawings · 09 Oct 2025
  • PAGE 1-50 TRANSPORT ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • PAGE 51-85 TRANSPORT ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • TREE PIT DETAILS TYPE C Drawings · 09 Oct 2025
  • TREE PIT DETAILS TYPE D Drawings · 09 Oct 2025
  • TREE PIT DETAILS TYPE E Drawings · 09 Oct 2025
  • TYPICAL SECTIONS Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 1 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 2 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 3 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 4 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 5 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 6 Drawings · 09 Oct 2025
  • VEHICLE TRACKING- SHEET 7 Drawings · 09 Oct 2025
  • VISIBLITY PLAN-SHEET 1 Drawings · 09 Oct 2025
  • VISIBLITY PLAN-SHEET 2 Drawings · 09 Oct 2025
  • VISIBLITY PLAN-SHEET 3 Drawings · 09 Oct 2025
  • VISIBLITY PLAN-SHEET 4 Drawings · 09 Oct 2025
  • VISIBLITY PLAN-SHEET 5 Drawings · 09 Oct 2025
  • PAGE 51 - 92 CONTAMINATED LAND ASSESSMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • PAGE 1-50 ARCHAEOLOGICAL DESK BASED ASSESSMENT AND HERITAGE STATEMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • PAGE 51-88 ARCHAEOLOGICAL DESK BASED ASSESSMENT AND HERITAGE STATEMENT Application Survey / Assessment / Statement · 09 Oct 2025
  • BNG METRIC Application Information · 09 Oct 2025
  • CONDITION ASSESSMENT Application Information · 09 Oct 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 8 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Cambridgeshire

  • 26/01269/FUL Granted

    Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ

    Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.

    Received 31 Mar, published by the council 23 Jul 2026 Full applications
  • 25/01014/FUL Granted

    Land Off Low Fen Drove Way Horningsea Cambridgeshire

    Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.

    Received 14 Mar, published by the council 23 Jul 2026 Full applications
  • 26/02714/FUL Granted

    Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY

    Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.

    Received 17 Jul, published by the council 14 Aug 2026 Full applications
  • 25/04556/FUL Refused

    Land At Station Road Willingham Cambridgeshire

    Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.

    Received 25 Nov, published by the council 23 Jul 2026 Full applications
  • 26/03702/FUL Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.

    Received 30 Sep, published by the council 8 Oct 2026 Full applications