Planning application
25/03520/FUL
122 Cottenham Road Histon Cambridgeshire CB24 9ET
Proposal
Demolition of existing dwelling and the erection of four dwellings and associated infrastructure.
As published by the council, reference 25/03520/FUL
Timeline
Dates from the published record
-
10 Sep 2025
Received by South Cambridgeshire
-
12 Sep 2025
Validated
Checked as complete and ready for consideration.
-
19 Jun 2026
Decision issued: Granted Permission
-
23 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/03419/HFUL Granted
125 Cottenham Road Histon Cambridgeshire CB24 9ET
Two storey side and rear extensions and single storey rear extensions following the demolition of the existing rear single storey lean-to conservatory and garden store. Including new flue to wood burning stove.
-
26/02196/S73 Awaiting decision
156 Cottenham Road Histon Cambridgeshire CB24 9ET
S73 to vary condition 3 (Materials) of planning permission 26/01343/HFUL (Demolition of existing garage and side extension. Part single, part two storey side and rear extension. Erection of detached garage to front of dwelling. Cladding to existing front elevation and alterations to fenestration. Addition of 1no. rooflight to rear elevation) to change the materials from a brick finish to an off white render.
-
26/02267/HFUL Awaiting decision
17 Normanton Way Histon Cambridgeshire CB24 9XS
Single storey side/rear extension, including conversion of garage to habitable space. Alterations to fenestration including relocation of front entrance and extension of existing canopy over front door.
-
25/04802/CONDA Awaiting decision
61 Cottenham Road Histon Cambridgeshire CB24 9ES
Submission of details required by condition 3 (Protection and Support), 4 (Mortars and Renders), 5 (Precise Details), 6 (Removal of Render/paint) and 7 (Render and render colour) of listed building consent 25/04802/LBC
-
25/04795/CONDA Awaiting decision
61 Cottenham Road Histon Cambridgeshire CB24 9ES
Submission of details required by condition 3 (materials), 4 (hard and soft landscape work), 5 (details of structural repairs, windows and doors, works to create new gable end window opening), 6 (details of render/colour) and 9 (scheme of ecology enhancement) of planning permission 25/04795/HFUL
Other full applications applications
In South Cambridgeshire
-
26/02779/FUL Awaiting decision
3 Royston Road Whittlesford Cambridgeshire CB22 4NW
3 bedroom replacement self build dwelling following demolition of existing bungalow.
-
26/02151/FUL Granted
3 Comberton Road Barton Cambridgeshire CB23 7BA
Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.
-
26/01627/FUL Granted
Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH
Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.
-
26/02708/FUL Awaiting decision
Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD
Partial demolition of existing collapsed wall and erection of a new wall.
-
25/02739/FUL Granted
Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ
Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.