Granted South Cambridgeshire 25/02539/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation and operation of a solar farm and battery energy storage system (BESS) together with all associated infrastructure, works and equipment, including landscape and ecological enhancement and access for a temporary period of 35 years. The application includes an Environmental Statement.

As published by the council, reference 25/02539/FUL

Application record

Reference
25/02539/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Granted Permission
Received
27 Jun 2025
Validated
27 Jun 2025
Decided
26 Jun 2026
Ward
Longstanton
Parish
Longstanton CP
Decision by
Delegated Decision
Postcode
CB24 8DB

Site history

Applications at this address on the South Cambridgeshire register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 26/00063/FUL Granted

    Land At Wilsons Road Longstanton Cambs CB24 8DB

    Installation of an underground cable grid connection in association with a proposed solar farm and Battery Energy Storage System (BESS). The application includes an Environmental Statement.

    Decided 26 Jun 2026 Full applications

Timeline

Dates from the published record

  1. 27 Jun 2025

    Received by South Cambridgeshire

  2. 26 Jun 2026

    Decision issued: Granted Permission

  3. 29 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Stantec PLC Agent, registered in Warrington

Active · incorporated 2024 · Warrington

387 applications on PlanIndex · across 112 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

165 documents on file for this application

  • EIA DECISION NOTICE Correspondence · 03 Jul 2026
  • DELIGATION REPORT Application Committee / Delegated Report · 30 Jun 2026
  • DECISION NOTICE Application Decision Notice · 26 Jun 2026
  • EOT REQUEST Extension of Time Request · 19 Jun 2026
  • ARCHAEOLOGY TECHNICAL NOTE REV B Application Survey / Assessment / Statement · 11 Jun 2026
  • CAMBRIDGESHIRE HISTORIC ENVIRONMENT TEAM Consultee Comments · 11 Jun 2026
  • ARCHAEOLOGY Consultee Comments · 11 Jun 2026
  • EOT REQUEST Extension of Time Request · 28 May 2026
  • EOT REQUEST Extension of Time Request · 24 Apr 2026
  • CAMBS FIRE AND RESCUE Consultee Comments · 22 Apr 2026
  • CAMBS FIRE AND RESCUE Consultee Comments · 22 Apr 2026
  • CAMBRIDGESHIRE HISTORIC ENVIRONMENT TEAM Consultee Comments · 31 Mar 2026
  • LANDSCAPE Consultee Comments · 04 Mar 2026
  • ENVIRONMENTAL HEALTH Consultee Comments · 25 Feb 2026
  • NATIONAL HIGHWAYS Consultee Comments · 23 Feb 2026
  • NATURAL ENGLAND Consultee Comments · 18 Feb 2026
  • BNE - CONSERVATION Consultee Comments · 17 Feb 2026
  • BNE - CONSERVATION Consultee Comments · 17 Feb 2026
  • ECOLOGY Consultee Comments · 17 Feb 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 13 Feb 2026
  • URBAN DESIGN Consultee Comments · 03 Feb 2026
  • ENVIRONMENT AGENCY COMMENTS Consultee Comments · 02 Feb 2026
  • CAMBRIDGESHIRE CONSTABULARY Consultee Comments · 30 Jan 2026
  • ANGLIAN WATER Consultee Comments · 30 Jan 2026
  • ACTIVE TRAVEL ENGLAND Consultee Comments · 30 Jan 2026
  • DEFINITIVE MAP TEAM Consultee Comments · 30 Jan 2026
  • AIRPORT SAFEGUARDING Consultee Comments · 30 Jan 2026
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 30 Jan 2026
  • WASTE - SHARED SERVICE Consultee Comments · 29 Jan 2026
  • SUSTAINABILITY Consultee Comments · 29 Jan 2026
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 28 Jan 2026
  • RESPONSE TO HIGHWAYS Application Information · 26 Jan 2026
  • COVER EMAIL Application Information · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM APPENDIX B ARCHAEOLOGY TECHNICAL NOTE - CABLE ROUTE Application Survey / Assessment / Statement · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM APPENDIX C ECOLOGICAL APPRAISAL - CABLE ROUTE Application Survey / Assessment / Statement · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM APPENDIX D ARBORICULTURAL NOTE Application Survey / Assessment / Statement · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM APPENDIX A LOCATION PLANS AND SITE PLANS Application Survey / Assessment / Statement · 26 Jan 2026
  • GEOPHYSICAL SURVEY REPORT Application Survey / Assessment / Statement · 26 Jan 2026
  • PV LAYOUT Drawings · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM NON-TECHNICAL SUMMARY Application Information · 26 Jan 2026
  • ENVIRONMENTAL STATEMENT ADDENDUM VOLUME 1 Application Survey / Assessment / Statement · 26 Jan 2026
  • FLOOD RISK ASSESSMENT V6 Application Survey / Assessment / Statement · 26 Jan 2026
  • LOCATION PLAN V2.0 Drawings · 26 Jan 2026
  • SITE PLAN V2.0 Drawings · 26 Jan 2026
  • EOT REQUEST Extension of Time Request · 16 Jan 2026
  • EOT REQUEST Extension of Time Request · 31 Oct 2025
  • NORTHSTOWE TOWN COUNCIL Consultee Comments · 18 Sep 2025
  • LONGSTANTON PARISH COUNCIL Consultee Comments · 17 Sep 2025
  • COUNTY TRANSPORT Consultee Comments · 05 Sep 2025
  • BRITISH HORSE SOCIETY Consultee Comments · 05 Sep 2025
  • BNE - CONSERVATION Consultee Comments · 26 Aug 2025
  • ECOLOGY Consultee Comments · 20 Aug 2025
  • SWAVESEY AND DISTRICT BRIDLEWAYS ASSOCIATION Third Party Comments · 10 Aug 2025
  • PEMBROKE HOUSE Third Party Comments · 08 Aug 2025
  • URBAN DESIGN Consultee Comments · 07 Aug 2025
  • LANDSCAPE Consultee Comments · 07 Aug 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 06 Aug 2025
  • CAMBRIDGESHIRE CONSTABULARY Consultee Comments · 01 Aug 2025
  • ACTIVE TRAVEL ENGLAND Consultee Comments · 01 Aug 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 29 Jul 2025
  • NATURAL ENGLAND COMMENTS Consultee Comments · 28 Jul 2025
  • DEFINITIVE MAP TEAM Consultee Comments · 24 Jul 2025
  • AIRPORT SAFEGUARDING Consultee Comments · 24 Jul 2025
  • NATIONAL HIGHWAYS Consultee Comments · 24 Jul 2025
  • LLFA Consultee Comments · 24 Jul 2025
  • ENVIRONMENT AGENCY COMMENTS Consultee Comments · 24 Jul 2025
  • WASTE - SHARED SERVICE Consultee Comments · 22 Jul 2025
  • BIODIVERSITY METRIC TOOL Application Information · 21 Jul 2025
  • SUSTAINABILITY Consultee Comments · 21 Jul 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 16 Jul 2025
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 16 Jul 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jul 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jul 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jul 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jul 2025
  • ANGLIAN WATER Consultee Comments · 16 Jul 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.5 PHOTOMONTAGES Application Survey / Assessment / Statement · 01 Jul 2025
  • CORRESPONDENCE Application Information · 01 Jul 2025
  • BNG METRIC CORRESPONDENCE Application Information · 30 Jun 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 27 Jun 2025
  • FEE CALCULATION Application Information · 27 Jun 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 6 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 5 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 7 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • CONSTRUCTION TRAFFIC MANAGEMENT PLAN Application Survey / Assessment / Statement · 27 Jun 2025
  • TRANSPORT STATEMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • NOISE IMPACT ASSESSMENT REPORT Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 8 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.1 SITE LOCATION PLAN Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.2 DETAILED PLANS Application Survey / Assessment / Statement · 27 Jun 2025
  • PLANNING, SUSTAINABILITY, ENERGY & DESIGN AND ACCESS STATEMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.4 SCOPING OPINION Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.5 STATEMENT OF EXPERTISE Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.6 EXISTING AND APPROVED DEVELOPMENTS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.7 PART 1 OF 2 CONSTRUCTION TRAFFIC MANAGEMENT PLAN Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.7 PART 2 OF 2 CONSTRUCTION TRAFFIC MANAGEMENT PLAN Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX B.1 HERITAGE AND ARCHAEOLOGY BASELINE ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 2 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX A.3 SCREENING OPINION Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.1 LANDSCAPE AND VISUAL BASELINE Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.2 TABLE OF EFFECTS VISUAL AMENITY Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.3 PART 1 OF 3 PHOTOVIEWPOINTS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.3 PART 2 OF 3 PHOTOVIEWPOINTS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.3 PART 3 OF 3 PHOTOVIEWPOINTS Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 3 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES FINDINGS OF EDPS VISUAL APPRAISAL Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES LANDSCAPE AND ECOLOGY STRATEGY Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES ILLUSTRATIVE SECTIONS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX D.1 ECOLOGY BASELINE REPORT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX D.2 BIODIVERSITY NET GAIN ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX D.3 STATUTORY BIODIVERSITY METRIC Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX D.4 ARBORICULTURAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX D.5 FARMLAND BIRD MITIGATION AREA Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX E.1 CLIMATE CHANGE POLICY Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX F.1 OUTLINE BATTERY SAFETY MANAGEMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX F.2 PART 2 OF 2 UXO RISK ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX B.2 MAGNITUDE SURVEYS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX B.3 CONSULTATION Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 1 OF 8 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 1 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 2 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 3 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 4 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 5 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX F PAGE 6 OF 6 Application Survey / Assessment / Statement · 27 Jun 2025
  • CAMBRIDGESHIRE FLOOD AND WATER SPD APPENDIX E Application Survey / Assessment / Statement · 27 Jun 2025
  • ARBORICULTURAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX G.1 AGRICULTURAL LAND CLASSIFICATION REPORT Application Survey / Assessment / Statement · 27 Jun 2025
  • INTERNAL ACCESS ROAD CROSS SECTION Drawings · 27 Jun 2025
  • MODULE ELEVATION Drawings · 27 Jun 2025
  • PERIMETER SECURITY FENCE PAGE 2 OF 2 Drawings · 27 Jun 2025
  • PERIMETER SECURITY FENCE PAGE 1 OF 2 Drawings · 27 Jun 2025
  • PTZ CAMERA 3M Drawings · 27 Jun 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • DNO DETAILS Drawings · 27 Jun 2025
  • CUSTOMER SUBSTATION DETAILS Drawings · 27 Jun 2025
  • SPARE PARTS CONTAINER DETAILS Drawings · 27 Jun 2025
  • POWER STATION DETAILS Drawings · 27 Jun 2025
  • PALISADE FENCE DETAILS Drawings · 27 Jun 2025
  • BATTERY CONTAINER DETAILS Drawings · 27 Jun 2025
  • PCS CONTAINER DETAILS Drawings · 27 Jun 2025
  • 11KV TRANSFORMER Drawings · 27 Jun 2025
  • 33KV TRANSFORMER Drawings · 27 Jun 2025
  • DNO COMPOUND DETAILS Drawings · 27 Jun 2025
  • WATER TANK DETAILS Drawings · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PART 1 OF 2 Application Information · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PART 2 OF 2 Application Information · 27 Jun 2025
  • AGRICULTURAL QUALITY REPORT Application Survey / Assessment / Statement · 27 Jun 2025
  • GLINT AND GLARE ASSESSMENT Application Survey / Assessment / Statement · 27 Jun 2025
  • COVERING LETTER Application Information · 27 Jun 2025
  • SUSTAINABILITY CHECKLIST Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 4 OF 8 PAGE 001-049 Application Survey / Assessment / Statement · 27 Jun 2025
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY PART 4 OF 8 PAGE 050-105 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES PUBLISHED LANDSCAPE CHARACTER ASSESSMENTS Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX C.4 FIGURES TOPOGRAPHY Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX F.2 PART 1 OF 2 UXO RISK ASSESSMENT PAGE 1-49 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT APPENDIX F.2 PART 1 OF 2 UXO RISK ASSESSMENT PAGE 50-77 Application Survey / Assessment / Statement · 27 Jun 2025
  • DETAILED UXO RISK ASSESSMENT PAGE 1-49 Application Survey / Assessment / Statement · 27 Jun 2025
  • DETAILED UXO RISK ASSESSMENT PAGE 50-89 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT VOLUME 1 PAGE 001-049 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT VOLUME 1 PAGE 050-099 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT VOLUME 1 PAGE 100-149 Application Survey / Assessment / Statement · 27 Jun 2025
  • ENVIRONMENTAL STATEMENT VOLUME 1 PAGE 150-188 Application Survey / Assessment / Statement · 27 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 26 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land At Wilsons Road Longstanton Cambs CB24 8DB

    26/00063/FUL Submitted 8 Jan 2026 150 yards away

    Installation of an underground cable grid connection in association with a proposed solar farm and Battery Energy Storage System (BESS). The application includes an Environmental Statement.

    Granted Full applications 60 docs

In South Cambridgeshire

  • 26/01269/FUL Granted

    Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ

    Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.

    Received 31 Mar, published by the council 23 Jul 2026 Full applications
  • 25/01014/FUL Granted

    Land Off Low Fen Drove Way Horningsea Cambridgeshire

    Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.

    Received 14 Mar, published by the council 23 Jul 2026 Full applications
  • 26/02714/FUL Granted

    Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY

    Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.

    Received 17 Jul, published by the council 14 Aug 2026 Full applications
  • 25/04556/FUL Refused

    Land At Station Road Willingham Cambridgeshire

    Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.

    Received 25 Nov, published by the council 23 Jul 2026 Full applications
  • 26/03702/FUL Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.

    Received 30 Sep, published by the council 8 Oct 2026 Full applications