Skip to content
PlanIndex Get alerts
Menu

Planning application

Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

Granted South Cambridgeshire 25/02472/FUL Full Application

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hybrid planning application comprising of full planning permission for the demolition of the existing buildings, and outline planning permission with all matters reserved for up to 7,800sqm/83,960sqft (GEA) of commercial floorspace falling use classes E(g)(ii) Research and Development, E(g)(iii) Industrial processes and B8 Warehouse and Distribution, and associated infrastructure works at Phase 3 of Bourn Quarter. The application includes an Environmental Statement.

As published by the council, reference 25/02472/FUL

Application record

Reference
25/02472/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Granted Permission
Received
24 Jun 2025
Validated
15 Jul 2025
Decided
10 Apr 2026
Ward
Caldecote
Parish
Bourn CP
Decision by
Delegated Decision
Postcode
CB23 2TQ

Site history

Applications at this address on the South Cambridgeshire register

This site has had 4 applications since 2025: 1 approved, 0 refused.

  • 25/02472/COND6 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 6 (Construction Ecological Management Plan) of planning permission 25/02472/FUL

    Submitted 22 Sep 2026 Conditions
  • 25/02472/COND15 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 15 (land contamination - protection of groundwater) of planning permission 25/02472/FUL.

    Submitted 10 Aug 2026 Conditions
  • 25/02472/COND14 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 14 (land contamination - investigation and remediation strategies) of planning permission 25/02472/FUL.

    Submitted 10 Aug 2026 Conditions

Timeline

Dates from the published record

  1. 24 Jun 2025

    Received by South Cambridgeshire

  2. 15 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Apr 2026

    Decision issued: Granted Permission

  4. 29 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 25/02472/COND6 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 6 (Construction Ecological Management Plan) of planning permission 25/02472/FUL

    Submitted 22 Sep 2026 Conditions
  • 25/02472/COND15 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 15 (land contamination - protection of groundwater) of planning permission 25/02472/FUL.

    Submitted 10 Aug 2026 Conditions
  • 25/02472/COND14 Awaiting decision

    Former David Ball (Db Group) Site Wellington Way Bourn Airfield Cambridge CB23 2TQ

    Submission of details required by condition 14 (land contamination - investigation and remediation strategies) of planning permission 25/02472/FUL.

    Submitted 10 Aug 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Neame Sutton Limited Agent, registered in Chichester

Active · incorporated 2010 · Chichester

59 applications on PlanIndex · across 18 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Diageo Pension Trust Ltd Applicant, registered in London

Active · incorporated 1971 · London

8 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

169 documents on file for this application

  • ARCHAEOLOGY REVISED CONDITIONS Consultee Comments · 14 Apr 2026
  • DELEGATED REPORT Application Committee / Delegated Report · 13 Apr 2026
  • DECISION NOTICE Application Decision Notice · 10 Apr 2026
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 01 Apr 2026
  • EOT REQUEST Extension of Time Request · 26 Mar 2026
  • UPDATED DRAINAGE INFORMATION Application Information · 20 Mar 2026
  • UPDATED DRAINAGE INFORMATION Application Information · 20 Mar 2026
  • LANDSCAPE Consultee Comments · 19 Mar 2026
  • URBAN DESIGN Consultee Comments · 18 Mar 2026
  • LLFA Consultee Comments · 10 Mar 2026
  • INFORMATION FOR LLFA - GREENFIELD RUNOFF RATES Application Information · 05 Mar 2026
  • INFORMATION FOR LLFA - UPDATED FRA Application Information · 05 Mar 2026
  • INFORMATION FOR LLFA - INDICATIVE DRAINAGE STRATEGY Application Information · 05 Mar 2026
  • EOT REQUEST Extension of Time Request · 04 Mar 2026
  • LLFA Consultee Comments · 24 Feb 2026
  • ESTIMATED STORAGE HYDRAULIC CALCULATIONS Application Information · 18 Feb 2026
  • FURTHER RESPONSE NOTE TO AMENDMENTS Agent / Applicant Comments · 18 Feb 2026
  • RESPONSE TO LLFA COMMENTS Application Survey / Assessment / Statement · 18 Feb 2026
  • AMENDED PARAMETER PLAN Drawings · 18 Feb 2026
  • AMENDED ILLUSTRATIVE CONTEXT PARAMETER PLAN Drawings · 18 Feb 2026
  • AVR WITH ADDITIONAL BUILDINGS Drawings · 18 Feb 2026
  • EOT REQUEST Extension of Time Request · 18 Feb 2026
  • EIA - UPDATED REGULATION 25 LETTER AND ENCLOSURES Application Information · 10 Feb 2026
  • COMBINED LANDSCAPE AND DESIGN COMMENTS Consultee Comments · 05 Feb 2026
  • TRANSPORT ASSESSMENT TEAM Consultee Comments · 03 Feb 2026
  • ANGLIAN WATER COMMENTS Consultee Comments · 02 Feb 2026
  • ECOLOGY Consultee Comments · 28 Jan 2026
  • LOCAL LEAD FLOOD AUTHORITY COMMENTS Consultee Comments · 21 Jan 2026
  • SITE NOTICE Application Press/Site Notices · 08 Jan 2026
  • APPLICANTS RESPONSE TO CONSULTATION FEEDBACK Agent / Applicant Comments · 07 Jan 2026
  • EIA REGULATION 25 SUBMISSION - FURTHER ENVIRONMENTAL INFORMATION Application Survey / Assessment / Statement · 07 Jan 2026
  • LANDSCAPE VISUAL REPRESENTATIONS Application Survey / Assessment / Statement · 07 Jan 2026
  • LVIA - TECHNICAL NOTE Application Survey / Assessment / Statement · 07 Jan 2026
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Application Survey / Assessment / Statement · 07 Jan 2026
  • BIODIVERSITY NET GAIN ASSESSMENT REPORT Application Survey / Assessment / Statement · 07 Jan 2026
  • BNG STATUTORY METRIC Application Survey / Assessment / Statement · 07 Jan 2026
  • TRANSPORT POST APPLICATION RESPONSE Application Survey / Assessment / Statement · 07 Jan 2026
  • FURTHER ARBORICULTURAL EXPLANATORY NOTE Application Survey / Assessment / Statement · 07 Jan 2026
  • ILLUSTRATIVE CONTEXT PARAMETERS PLAN Drawings · 07 Jan 2026
  • AMENDED PARAMETER PLAN Drawings · 07 Jan 2026
  • EOT REQUEST Extension of Time Request · 30 Dec 2025
  • AMENDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 19 Nov 2025
  • UPDATED RESPONSE FROM EAST WEST RAIL COMPANY Consultee Comments · 11 Nov 2025
  • PLANNING POLICY COMMENTS Consultee Comments · 21 Oct 2025
  • URBAN DESIGN COMMENTS Consultee Comments · 15 Sep 2025
  • TRANSPORT ASSESSMENT TEAM Consultee Comments · 21 Aug 2025
  • LANDSCAPE Consultee Comments · 20 Aug 2025
  • ECOLOGY Consultee Comments · 19 Aug 2025
  • JUNIPER PROPCO (BOURN) LIMITED Third Party Comments · 19 Aug 2025
  • ANGLIAN WATER Consultee Comments · 14 Aug 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 12 Aug 2025
  • SCIENTIFIC OFFICER Consultee Comments · 12 Aug 2025
  • NATIONAL HIGHWAYS Consultee Comments · 12 Aug 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 12 Aug 2025
  • ENVIRONMENT AGENCY COMMENTS Consultee Comments · 12 Aug 2025
  • EAST WEST RAIL COMMENTS Consultee Comments · 11 Aug 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 11 Aug 2025
  • LLFA Consultee Comments · 07 Aug 2025
  • SUSTAINABILITY Consultee Comments · 06 Aug 2025
  • TREES Consultee Comments · 01 Aug 2025
  • ARCHAEOLOGY COMMENTS Consultee Comments · 29 Jul 2025
  • CONSERVATION Consultee Comments · 23 Jul 2025
  • INVALID LETTER Application Information · 22 Jul 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 22 Jul 2025
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 22 Jul 2025
  • WASTE - SHARED SERVICE Consultee Comments · 22 Jul 2025
  • SITE NOTICE Application Press/Site Notices · 22 Jul 2025
  • SUPERSEDED BIODIVERSITY NET GAIN CALCULATIONS Application Information · 15 Jul 2025
  • INVALID LETTER Application Information · 08 Jul 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 24 Jun 2025
  • FEE CALCULATION Application Information · 24 Jun 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 24 Jun 2025
  • SUPERSEDED PARAMETERS PLAN Drawings · 24 Jun 2025
  • ILLUSTRATIVE SITE LAYOUT PLAN Drawings · 24 Jun 2025
  • ILLUSTRATIVE COLOURED SITE LAYOUT PLAN Drawings · 24 Jun 2025
  • ILLUSTRATIVE ELEVATIONS Drawings · 24 Jun 2025
  • AIR QUALITY ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • DEMOLITION PLAN Drawings · 24 Jun 2025
  • ILLUSTRATIVE COLOURED ELEVATIONS Drawings · 24 Jun 2025
  • ES V1 CHAPTER 10 SUMMARY Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 2 APPROACH TO EIA Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 3 SITE CONTEXT Application Survey / Assessment / Statement · 24 Jun 2025
  • AS-EXISTING SITE PLAN Drawings · 24 Jun 2025
  • ES V1 CHAPTER 5 CONSIDERATION OF ALTERNATIVES Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 6 TRANSPORT AND ACCESS Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 7 SOCIO-ECONOMICS AND HUMAN HEALTH Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 1 INTRODUCTION Application Survey / Assessment / Statement · 24 Jun 2025
  • BOURN QUARTER PHASE 3 ENVIRONMENTAL STATEMENT CONTENTS PAGE Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 4 DEVELOPMENT SPECIFICATION Application Survey / Assessment / Statement · 24 Jun 2025
  • SUPERSEDED ES V1 FIGURE 4.1 PARAMETERS PLAN Drawings · 24 Jun 2025
  • ES V1 FIGURE 6.1 TRANSPORT AND ACCESS STUDY AREA Drawings · 24 Jun 2025
  • ES V1 FIGURE 7.1 SOCIO-ECONOMICS AND HUMAN HEALTH IMPACT AREA MAP Drawings · 24 Jun 2025
  • ES V1 FIGURE 8.1 HABITAT MAP Drawings · 24 Jun 2025
  • ES V1 FIGURE 9.1 CUMULATIVE PROJECT PLAN Drawings · 24 Jun 2025
  • ES V2 APPENDIX 1.1 STATEMENT OF TECHNICAL COMPETENCE Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 2.2 EIA SCOPING OPINION Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V1 CHAPTER 8 BIODIVERSITY Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 6.2 CONSTRUCTION TRAFFIC DATA Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 6.3 2026 BASELINE TEMPRO GROWTH FACTORS AND CRITERIA Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 8.1 ECOLOGY REPORT Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 9.1 TRANSPORT AND ACCESS OPERATIONAL IN-COMBINATION EFFECTS ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V3 ENVIRONMENTAL MANAGEMENT PLAN Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V4 NON-TECHNICAL SUMMARY Application Survey / Assessment / Statement · 24 Jun 2025
  • LOCATION PLAN Drawings · 24 Jun 2025
  • ES V1 CHAPTER 9 ASSESSMENT OF CUMULATIVE EFFECTS Application Survey / Assessment / Statement · 24 Jun 2025
  • ARBORICULTURAL IMPACT PLAN Drawings · 24 Jun 2025
  • LOCATION PLAN Drawings · 24 Jun 2025
  • OFFICE WAREHOUSE GROUD FLOOR PLAN Drawings · 24 Jun 2025
  • ES V2 APPENDIX 6.1 PIC DATA REPORT AND MAP Application Survey / Assessment / Statement · 24 Jun 2025
  • BNG BASELINE Drawings · 24 Jun 2025
  • BNG POST DEVELOPMENT Drawings · 24 Jun 2025
  • BNG STATUTORY METRIC HEADLINE RESULTS Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC OFF SITE HABITAT BASELINE Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC OFF SITE HABITAT CREATION Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC ON SITE HABITAT BASELINE Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC ON SITE HABITAT CREATION Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC ON SITE HEDGE BASELINE Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC TRADING SUMMARY AREA HABITATS Application Information · 24 Jun 2025
  • BNG STATUTORY METRIC TRADING SUMMARY HEDGEROWS Application Information · 24 Jun 2025
  • DESIGN & ACCESS STATEMENT Design and Access Statement · 24 Jun 2025
  • CIL FORM 1 Application Information · 24 Jun 2025
  • DEMOLITION METHOD STATEMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • SUPERSEDED DESIGN AND ACCESS STATEMENT_INCLUDED_IN_ADDITIONAL PLANS Drawings · 24 Jun 2025
  • ECOLOGY REPORT Application Survey / Assessment / Statement · 24 Jun 2025
  • ENERGY STRATEGY Application Survey / Assessment / Statement · 24 Jun 2025
  • EXTERNAL LIGHTING DESIGN Application Information · 24 Jun 2025
  • ARCHAEOLOGICAL DESK BASED ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • SUPERSEDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Application Survey / Assessment / Statement · 24 Jun 2025
  • HABITAT MAP Drawings · 24 Jun 2025
  • HERITAGE APPRAISAL Application Survey / Assessment / Statement · 24 Jun 2025
  • LOW EMISSION STRATEGY Application Survey / Assessment / Statement · 24 Jun 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • NOISE IMPACT ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • PLANNING STATEMENT (JUNE 2025) Application Survey / Assessment / Statement · 24 Jun 2025
  • PRELIMINARY RISK ASSESSMENT APPENDIX I HISTORICAL MAPS Application Survey / Assessment / Statement · 24 Jun 2025
  • PRELIMINARY RISK ASSESSMENT APPENDIX II (ENVIROCHECK) Application Survey / Assessment / Statement · 24 Jun 2025
  • PRELIMINARY RISK ASSESSMENT APPENDIX III (UXO) Application Survey / Assessment / Statement · 24 Jun 2025
  • PRELIMINARY RISK ASSESSMENT REPORT 22-186.01 V3 Application Survey / Assessment / Statement · 24 Jun 2025
  • SCHEDULE OF APPLICATION DOCS (12TH JUNE 2025) Application Information · 24 Jun 2025
  • HABITATS REGULATIONS ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • TRANSPORT ASSESSMENT Application Survey / Assessment / Statement · 24 Jun 2025
  • TRAVEL PLAN Application Information · 24 Jun 2025
  • TREE PROTECTION PLAN Drawings · 24 Jun 2025
  • TREE SCHEDULE Application Information · 24 Jun 2025
  • WASTE MANAGEMENT DESIGN GUIDE TOOLKIT (JUNE 2025) Application Information · 24 Jun 2025
  • WATER USAGE REPORT Application Information · 24 Jun 2025
  • ES V2 APPENDIX 2.1 EIA SCOPING REPORT PAGE 1-50 Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 2.1 EIA SCOPING REPORT PAGE 51-100 Application Survey / Assessment / Statement · 24 Jun 2025
  • ES V2 APPENDIX 2.1 EIA SCOPING REPORT PAGE 101-123 Application Survey / Assessment / Statement · 24 Jun 2025
  • PHASE II GEO ENVIRONMENTAL RISK ASSESSMENT 22-186.02 V3 PAGE 1-50 Application Survey / Assessment / Statement · 24 Jun 2025
  • PHASE II GEO ENVIRONMENTAL RISK ASSESSMENT 22-186.02 V3 PAGE 51-100 Application Survey / Assessment / Statement · 24 Jun 2025
  • PHASE II GEO ENVIRONMENTAL RISK ASSESSMENT 22-186.02 V3 PAGE 101-175 Application Survey / Assessment / Statement · 24 Jun 2025
  • OFFICE WAREHOUSE GROUND FLOOR PLAN Drawings · 24 Jun 2025
  • OFFICE WAREHOUSE FIRST FLOOR PLAN Drawings · 24 Jun 2025
  • OFFICE WAREHOUSE SECOND FLOOR PLAN Drawings · 24 Jun 2025
  • WAREHOUSE GROUND FLOOR PLAN Drawings · 24 Jun 2025
  • ELEVATION 1 Drawings · 24 Jun 2025
  • ELEVATION 2 Drawings · 24 Jun 2025
  • ELEVATION 3 Drawings · 24 Jun 2025
  • ELEVATION 4 Drawings · 24 Jun 2025
  • ELEVATION 5 Drawings · 24 Jun 2025
  • ELEVATION 6 Drawings · 24 Jun 2025
  • ELEVATION 7 Drawings · 24 Jun 2025
  • ELEVATION 8 Drawings · 24 Jun 2025
  • SECTION A-A Drawings · 24 Jun 2025
  • SECTION B-B Drawings · 24 Jun 2025
  • SECTION C-C Drawings · 24 Jun 2025
  • SECTION D-D Drawings · 24 Jun 2025
  • HABITATS REGULATIONS ASSESSMENT Application Information · 24 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 10 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Cambridgeshire

  • 26/01269/FUL Granted

    Former Prospect House & Units 1-5 Carisbrooke Court Buckingway Business Park Anderson Road Swavesey Cambridgeshire CB24 4UQ

    Construction of 3 No. buildings, for flexible B2 general industrial, B8 storage and distribution, and E(g)(iii) light industrial uses with ancillary office, associated service yard, access point, car parking, and landscape planting.

    Received 31 Mar, published by the council 23 Jul 2026 Full applications
  • 25/01014/FUL Granted

    Land Off Low Fen Drove Way Horningsea Cambridgeshire

    Construction and operation of a temporary solar farm and energy storage system with associated works, equipment and necessary infrastructure.

    Received 14 Mar, published by the council 23 Jul 2026 Full applications
  • 26/02714/FUL Granted

    Kingsway Golf Centre Cambridge Road Melbourn Cambridgeshire SG8 6EY

    Demolition of existing foyer and erection of a single storey front extension to create foyer/entrance and application of external cladding to existing building.

    Received 17 Jul, published by the council 14 Aug 2026 Full applications
  • 25/04556/FUL Refused

    Land At Station Road Willingham Cambridgeshire

    Change of use of land for the stationing of caravans for residential purposes, and the erection of dayrooms and laying of hardstanding ancillary to that use.

    Received 25 Nov, published by the council 23 Jul 2026 Full applications
  • 26/03702/FUL Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of new lighting and controls in various locations around Girton College, including Cloister Court, the external pedestrian route to the Pavilion, the entrance tower archway, the Stanley Library, Cloister Corridor, Old Hall, the Chapel, Eliza Baker Court, the Dining Hall and the Upper Library. Additionally, new AV facilities within the Chapel.

    Received 30 Sep, published by the council 8 Oct 2026 Full applications