Skip to content
PlanIndex Get alerts
Menu

Planning application

105 High Street Melbourn Cambridgeshire SG8 6AP

Granted South Cambridgeshire 25/00812/FUL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Flat roof extension and raised deck with covered pergola to rear garden.

As published by the council, reference 25/00812/FUL

Application record

Reference
25/00812/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
4 Mar 2025
Validated
11 Mar 2025
Decided
23 Sep 2025
Ward
Melbourn
Parish
Melbourn CP
Decision by
Delegated Decision
Postcode
SG8 6AP

Site history

Applications at this address on the South Cambridgeshire register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/00580/ADV Granted

    105 High Street Melbourn Cambridgeshire SG8 6AP

    Installation of 1 No. externally illuminated projecting/hanging sign, 2 No. externally illuminated Fascia signs, 2 No. non illuminated Fascia Signs, 4 No. externally illuminated replacement corex panels to existing V shaped post sign and 2 No. externally illuminated replacement corex panels to existing post sign.

    Decided 9 May 2025 Advertising

Timeline

Dates from the published record

  1. 4 Mar 2025

    Received by South Cambridgeshire

  2. 11 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Sep 2025

    Decision issued: Granted Permission

  4. 12 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Arc Design Consultants Ltd Agent, a design practice registered in Peterborough

Active · incorporated 2009 · Peterborough

17 applications on PlanIndex · across 6 councils · 59% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 23 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 105 High Street Melbourn Cambridgeshire SG8 6AP

    25/00580/ADV Submitted 17 Feb 2025 13m away

    Installation of 1 No. externally illuminated projecting/hanging sign, 2 No. externally illuminated Fascia signs, 2 No. non illuminated Fascia Signs, 4 No. externally illuminated replacement corex panels to existing V shaped post sign and 2 No. externally illuminated replacement corex panels to existing post sign.

    Granted Advertising 23 docs
  • 78 High Street Melbourn Cambridgeshire SG8 6AL

    22/1102/TTPO Submitted 27 Sep 2022 57m away

    T1 - Tree of heaven - Reduce overhang to clear neighbouring roof by 2.5m. Install Cobra brace to support branch over neighbouring garden. Remove deadwood.

    Granted Trees 9 docs
  • 117 High Street Melbourn Cambridgeshire SG8 6AP

    26/03430/LBC Submitted 8 Sep 2026 71m away

    94% historically approved · decision due ~3 Nov

    Retention of conservatory extension

    Awaiting decision Heritage and listed buildings Extension 11 docs
  • 117 High Street Melbourn Cambridgeshire SG8 6AP

    26/03429/HFUL Submitted 8 Sep 2026 71m away

    95% historically approved · decision due ~3 Nov

    Retrospective conservatory extension

    Awaiting decision Householder Extension 12 docs
    Small domestic
  • 2A Dolphin Lane Melbourn Cambridgeshire SG8 6AF

    22/03236/HFUL Submitted 15 Jul 2022 84m away

    Single storey rear extension, front and rear roof extensions to create first floor, and garage conversion to habitable space

    Granted Householder Extension 18 docs
    Small domestic
  • United Reformed Church Orchard Road Melbourn Cambridgeshire

    24/1078/TTCA Submitted 27 Sep 2024 93m away

    Norway Maple - cut back overhanging branches in lower canopy by approx 2m back to boundary

    Granted Trees 9 docs

In South Cambridgeshire

  • 26/03456/FUL Awaiting decision

    Wimpole Park, Wimpole Hall Wimpole Park Road Wimpole Cambridgeshire SG8 0BW

    Temporary installation of a selection of vintage fairground rides, catering concessions, lights installations, and temporary staff welfare units on site for the Christmas at Wimpole lights trail from 20th November 2026 to 15th January 2027 (not including 25 December 2026). Also including one marquee type structure in concession area.

    10 Sep 2026 Full applications
  • 26/02708/FUL Granted

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 26/02452/FUL Withdrawn

    Land West Of 82 Earith Road Willingham Cambridgeshire

    Erection of a permeable hard standing area and fence to the front of the site associated with the enjoyment of orchard use.

    29 Jun 2026 Full applications
  • 26/02618/FUL Granted

    Land To The North Of New Farm Road New Farm Road Newton Cambridgeshire

    Change of use from agricultural land to grazing land for the keeping of horses, with associated access, mobile field shelter, and fencing.

    10 Jul 2026 Full applications
  • 26/03410/FUL Awaiting decision

    Building B Granta Park Great Abington Cambridgeshire CB21 6GP

    Erection of a temporary indoor padel tennis centre comprising 6 covered courts and a coaching court with reception and ancillary cafe, together with changing accommodation, parking, cycle parking, landscaping, drainage works and associated infrastructure (meanwhile use).

    7 Sep 2026 Full applications