Granted South Cambridgeshire 22/04536/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of Use from Class B1 (a) and Class A1/A3 to Class E at One Cambridge Square

As published by the council, reference 22/04536/FUL

Application record

Reference
22/04536/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
13 Oct 2022
Validated
13 Oct 2022
Decided
18 Jan 2023
Ward
Milton & Waterbeach
Parish
Milton CP
Decision by
Delegated Decision
Postcode
CB4 0AE

Timeline

Dates from the published record

  1. 13 Oct 2022

    Received by South Cambridgeshire

  2. 18 Jan 2023

    Decision issued: Granted Permission

  3. 9 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Cambridge

683 applications on PlanIndex · across 83 councils · 89% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

45 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 18 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land Adjacent To Cambridge North Station Milton Avenue Cambridge Cambridgeshire

    S/4824/18/NMA Submitted 8 Jun 2020 89m away

    Non Material amendment of planning permission S/4824/18/VC - Extension of the basement level to accommodate 53 car parking spaces (including 27 Variable Power EV Charging Points). This change requires minor re-configuration of the ground floor plan, both internal and external but will retain the high quality secure cycling facilities and plant space; Changes to the elevations including; Introducing car lift entrance on the west side of the building; Louvred area in the north east corner within the indent of the box frames for basement ventilation; Re-adjusting the exit door to the south core to improve regress; Removal of two sets of doors from ground floor office on north side; Egress from ground floor office space on west side as per fire safety advice. Relocation of the loading bay to the western side of the building; Re-configuration of rain gardens on west side of building (rain gardens have been relocated south and given a rectangular footprint, instead of angular edges. Whilst this results in a reduction in surface footprint by approximately a third, the rectangular shape reduces the kerb haunching at the corners and provides an improved environment for the herbaceous plantings). Associated amendment to the working of condition 27 to require submission of Parking Management Plan prior to occupation.

    Granted Amendments Extension 29 docs
  • Land North Of Cambridge North Station Milton Avenue Cambridge Cambridgeshire CB4 0AE

    22/02771/COND4 Submitted 17 Jun 2026 93m away

    Partial discharge of condition 4 (Ecological Design Strategy (EDS)) of outline planning permission 22/02771/OUT pursuant to Residential Quarter and Wild Park Phase(s).

    Decided Conditions 9 docs
  • Land North Of Cambridge North Station Milton Avenue Cambridge Cambridgeshire

    22/02771/COND3 Submitted 17 Jun 2026 93m away

    Partial discharge of condition 3 (Construction Ecological Management Plan) of outline planning permission 22/02771/OUT pursuant to Residential Quarter and Wild Park Phase(s).

    Decided Conditions 8 docs
  • Land North Of Cambridge North Station Milton Avenue Cambridge Cambridgeshire

    22/02771/COND12 Submitted 11 May 2026 93m away

    Partial discharge of condition 12 (hard and soft landscape - Residential Quarter and Wild Park only) of outline planning permission 22/02771/OUT.

    Decided Conditions 29 docs
  • Land Adjacent To Cambridge North Station Milton Avenue Cambridge CB4 0WZ

    S/4824/18/COND30 Submitted 18 Jun 2020 101m away

    Condition 30 - EV Charging Plan

    Decided Conditions 10 docs
  • Land Adjacent To Cambridge North Station Milton Avenue Cambridge CB4 0WZ

    S/4824/18/COND28 Submitted 18 Jun 2020 101m away

    Condition 28 - Permanent car park for the office scheme

    Decided Conditions 11 docs

In South Cambridgeshire

  • 26/03360/FUL Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Installation of one Basketball Practice Court

    3 Sep 2026 Full applications
  • 26/03326/FUL Awaiting decision

    1 Workshop And Premises River Lane Haslingfield Cambridgeshire CB23 1LX

    Minor external alterations including: New composite aluminium windows and doors with timber infill panels to match, existing woodwork (fascias, cladding) repainted to match windows, new openings including doors and windows, raising of single storey parapet and new Juliette Balcony to first floor with glass balustrade

    2 Sep 2026 Full applications
  • 26/02239/FUL Granted

    South View Main Street Cambridge Caldecote CB23 7NU

    Demolition of existing building and erection of a single storey residential annex, with associated driveway, parking and landscaping.

    15 Jun 2026 Full applications
  • 26/02364/FUL Granted

    70 Lambs Lane Cottenham Cambridgeshire CB24 8TA

    Erection of 3 No. detached dwellings with associated vehicular access, private gardens, and landscaping (retrospective application)

    22 Jun 2026 Full applications
  • 26/02561/FUL Granted

    29 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0DW

    Installation of an external roof top plant, replacement glazing with solid panels and externally applied vinyls to first floor

    6 Jul 2026 Full applications