Skip to content
PlanIndex Get alerts
Menu

Planning application

22/03740/FUL

55 Narrow Lane Histon Cambridgeshire CB24 9HD

Granted South Cambridgeshire Full Application

Proposal

Erection of 2 No. semi-detached single storey dwellings on land to the rear of 55 Narrow Lane and new access from Muncey Walk

As published by the council, reference 22/03740/FUL

Timeline

Dates from the published record

  1. 18 Aug 2022

    Received by South Cambridgeshire

  2. 3 Nov 2022

    Decision issued: Granted Permission

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01778/HFUL Granted

    26 Burkett Way Histon Cambridgeshire CB24 9XU

    Single storey rear extension. Roof extension with rear facing dormer and rooflights to front elevation.

    12 May 2026 193m away Householder
  • 26/02397/HFUL Awaiting decision

    28 Narrow Lane Histon Cambridgeshire CB24 9HD

    Single storey rear extension, alterations to fenestration and render to external walls.

    24 Jun 2026 208m away Householder
  • 26/02283/HFUL Awaiting decision

    22 Pages Close Histon Cambridgeshire CB24 9HF

    Single storey side infill extension. Changes to fenestration including rooflights to existing flat roof.

    17 Jun 2026 215m away Householder
  • 20/04631/HFUL Granted

    46 Orchard Road Histon CB24 9HN

    Proposed two storey side and single storey rear extensions, rendering and window replacement.

    11 Nov 2020 234m away Householder
  • 26/02690/CL2PD Awaiting decision

    2 Church Street Histon Cambridge Cambridgeshire CB24 9JG

    Certificate of lawfulness under S192 for the installation of solar panels to both South facing roofs.

    16 Jul 2026 252m away Lawful development
  • 22/04047/CL2PD Granted

    2 Church Street Histon Cambridgeshire CB24 9JG

    Certificate Of Lawfulness Under S192 Installation Of Solar Panels.

    12 Sep 2022 253m away Lawful development

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications