Skip to content
PlanIndex Get alerts
Menu

Planning application

22/02011/FUL

29 High Street Melbourn Cambridgeshire SG8 6EB

Granted South Cambridgeshire Full Application

Proposal

Change of use of former public house to dwelling and erection of 3no. dwellings with associated development.

As published by the council, reference 22/02011/FUL

Timeline

Dates from the published record

  1. 28 Apr 2022

    Received by South Cambridgeshire

  2. 3 Nov 2022

    Decision issued: Granted Permission

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/04284/HFUL Granted

    6 Norgetts Lane Melbourn SG8 6HS

    Extension of front porch with new rooflight

    19 Oct 2020 60m away Householder
  • 26/01686/PRIOR Granted

    18 Norgetts Lane Melbourn Cambridgeshire SG8 6HS

    Single storey rear extension.

    5 May 2026 132m away Prior approval
  • 26/01547/HFUL Granted

    4 Barham Court Melbourn Cambridgeshire SG8 6EW

    Single storey rear extension including replacement roof and raising wall height of existing rear element. Replacement of rear window with door.

    23 Apr 2026 186m away Householder
  • 20/05024/PRI03M Granted

    10 The Moor Melbourn Royston Cambridgeshire SG8 6ED

    Prior approval for change of Use from Class A1 (Hairdressers) to Class C3 (Dwellinghouse)

    7 Dec 2020 209m away Full applications
  • 20/2274/TTCA Granted

    44 High Street Melbourn SG8 6DZ

    T.1 Conifer - Fell to ground level due to excessive shading. Tree has become to large for area and is blocking light and dropping debris in pond. T.2 Holmoak - Remove 1x lower branch 25cm in diameter and approx. 2M long.

    5 Nov 2020 230m away Trees
  • 26/01538/FUL Granted

    19-21 Station Road Melbourn Cambridgeshire SG8 6DX

    Removal of existing building and the erection of 3 No. dwellings with private gardens and car parking on site.

    22 Apr 2026 327m away Full applications

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications