Planning application

21/02600/FUL

7 Orchard Road Haslingfield CB23 1JT

Refused South Cambridgeshire Full Application

Proposal

Erection of a one and a half storey house - resubmission of 21/00590/FUL

As published by the council, reference 21/02600/FUL

Timeline

Dates from the published record

  1. 3 Jun 2021

    Received by South Cambridgeshire

  2. 7 Nov 2022

    Decision issued: Refused Permission

  3. 23 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 24/0897/TTPO Granted

    4 Orchard Road Haslingfield Cambridgeshire CB23 1JT

    T1 Walnut tree: fell. Reason: the tree has deteriorated rapidly over the space of a year. It has dropped branches and it is a matter of time before the tree dies.

    20 Aug 2024 64m away Trees
  • 20/03719/HFUL Granted

    1 Badcock Road Haslingfield CB23 1LF

    Two storey side extension, single storey front, rear and side extensions, demolition of existing single storey garage

    4 Sep 2020 64m away Householder
  • 20/01798/NMA1 Granted

    37 Badcock Road Haslingfield Cambridge Cambridgeshire CB23 1LF

    Non-material amendment of planning application 20/01798/HFUL (Single storey side extension and partial garage conversion) to change single door and window on the West extension to a pair of French doors plus flat roof lantern over kitchen extension

    21 Dec 2020 110m away Amendments
  • 26/01612/HFUL Granted

    6 Fountain Lane Haslingfield Cambridgeshire CB23 1LT

    Single storey side and rear extensions. Replacement of rear window with french doors.

    28 Apr 2026 117m away Householder
  • 26/0782/TTCA Awaiting decision

    Haslingfield Endowed Primary School High Street Haslingfield Cambridgeshire CB23 1JW

    T1 - Dead tree - Fell and remove dead tree to fence level due to the tree encroaching on the fence

    28 Jul 2026 258m away Trees
  • 20/04890/HFUL Granted

    8 The Elms Haslingfield CB23 1ND

    Two storey side and single storey rear extension.

    26 Nov 2020 272m away Householder

In South Cambridgeshire

  • 26/02779/FUL Awaiting decision

    3 Royston Road Whittlesford Cambridgeshire CB22 4NW

    3 bedroom replacement self build dwelling following demolition of existing bungalow.

    22 Jul 2026 Full applications
  • 26/02151/FUL Granted

    3 Comberton Road Barton Cambridgeshire CB23 7BA

    Installation of a Solar PV system to the roof pitches of the detached garage outbuilding.

    9 Jun 2026 Full applications
  • 26/01627/FUL Granted

    Valley Farm House Valley Farm Road West Wratting Cambridgeshire CB21 4HH

    Change of use of an agricultural building to uses falling within classes B8 storage/distribution or E(g)(iii) light industrial use.

    29 Apr 2026 Full applications
  • 26/02708/FUL Awaiting decision

    Rectory Farm Middle Street Thriplow Cambridge Cambridgeshire SG8 7RD

    Partial demolition of existing collapsed wall and erection of a new wall.

    17 Jul 2026 Full applications
  • 25/02739/FUL Granted

    Land To The South Of Munceys Farm London Way Melbourn Cambridgeshire SG8 6DJ

    Construction and operation of a 25MW solar photovoltaic farm and a 25MW Battery Energy Storage System (BESS) including access, fencing, CCTV, internal service tracks, ancillary equipment and scheme of landscaping for an operational lifespan of 40 years.

    10 Jul 2025 Full applications