Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The North Of East Way And The A45 Coventry Road, And To The East Of Middle Bickenhill Lane, Intersecting Hollywell Brook

Granted Solihull PL/2025/00471/S17DIS HS2 Schedule 17 Discharge of Conditions

Relates to PL/2023/02560/HS2DIS

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 2 (materials schedule) attached to PL/2023/02560/HS2DIS.

As published by the council, reference PL/2025/00471/S17DIS

Application record

Reference
PL/2025/00471/S17DIS
Type
HS2 Schedule 17 Discharge of Conditions
Status
Decided
Decision
Granted As published: Approved
Received
10 Mar 2025
Validated
10 Mar 2025
Decided
21 Oct 2025
Ward
Bickenhill
Parish
Bickenhill Parish Council
Decision by
Delegated Decision

Site history

Applications at this address on the Solihull register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • Land To The North Of East Way And The A45 Coventry Road, And To The East Of Middle Bickenhill Lane, Intersecting Hollywell Brook

    Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Engineering earthworks to form a railway embankment (Bickenhill Embankment) and cutting, construction of an underbridge accommodating the realigned Hollywell Brook (Hollywell Brook Underbridge); and ancillary works including: Earthworks to form two watercourse diversions; earthworks to form three balancing ponds; earthworks to form drainage ditches; construction of culvert headwalls the access track culvert accommodating Bickenhill Brook; earthworks to form two replacement flood storage areas; earthworks to form two maintenance access tracks; earthworks to form a level platform for a Global System for Mobile Communications-Railway (GSM-R) compound; levelling of existing earthworks; landscaping earthworks; provision of permanent areas for vehicle parking; and location of permanent security, ecological and boundary fencing and vehicle restraint barriers.

    Decided 18 Oct 2024

Timeline

Dates from the published record

  1. 10 Mar 2025

    Received by Solihull

  2. 21 Oct 2025

    Decision issued: Approved

  3. 8 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Land To The North Of East Way And The A45 Coventry Road, And To The East Of Middle Bickenhill Lane, Intersecting Hollywell Brook

    Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Engineering earthworks to form a railway embankment (Bickenhill Embankment) and cutting, construction of an underbridge accommodating the realigned Hollywell Brook (Hollywell Brook Underbridge); and ancillary works including: Earthworks to form two watercourse diversions; earthworks to form three balancing ponds; earthworks to form drainage ditches; construction of culvert headwalls the access track culvert accommodating Bickenhill Brook; earthworks to form two replacement flood storage areas; earthworks to form two maintenance access tracks; earthworks to form a level platform for a Global System for Mobile Communications-Railway (GSM-R) compound; levelling of existing earthworks; landscaping earthworks; provision of permanent areas for vehicle parking; and location of permanent security, ecological and boundary fencing and vehicle restraint barriers.

    Decided 18 Oct 2024

Who's behind it

Company information only, from the register and Companies House

High Speed Two (HS2) Limited Applicant, registered in Birmingham

Active · incorporated 2009 · Birmingham

76 applications on PlanIndex · across 8 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • DECISION NOTICE Decision · 22 Oct 2025
  • BBV RESPONSE TO SMBC Correspondence · 22 Aug 2025
  • MATERIALS SCHEDULE Report · 10 Mar 2025
  • APPLICATION FOR APPROVAL OF DETAILS RESERVED BY CONDITION Report · 10 Mar 2025
  • SCH17 PLANS & SPECS (DISCHARGE OF CONDITION) APPLICATION Application Form · 10 Mar 2025
  • COVERING LETTER Correspondence · 10 Mar 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Solihull granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Solihull

  • PL/2026/01665/DIS Awaiting decision

    Mell Square Solihull

    Discharge condition Nos. 52 - Phase 2 (Demolition Management Plan), 53 - Phase 2 (Demolition and Construction Ecological Management Plan), Part discharge of conditon 54 - Part 3 and Part 4 - Phase 2 (Contaminated land) and Informative 4 (Biodiversity Gain Plan - Phase 2) following planning approval PL/2025/00547/MAJFDW.

    Received 11 Sep, published by the council 8 Oct 2026 Conditions
  • PL/2026/01598/DIS Awaiting decision

    5 Marston Drive Kingshurst Solihull B37 6BD

    Discharge condition 12 (Demolition and Construction Environmental Management Plan), 15 (Construction Environmental Management Plan) and 22 (Construction Management Plan) following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)

    Received 28 Aug, published by the council 7 Sep 2026 Conditions
  • PL/2026/01588/DIS Awaiting decision

    47 Lady Byron Lane Knowle Solihull B93 9AX

    Discharge of condition 16 - Biodiversity of planning approval PL/2026/00624/PPFL- Replacment Dwelling - Approved 5.8.26.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • PL/2026/01586/DIS Awaiting decision

    Kingshurst Village Centre And Former Mountford Public House, Marston Drive, Over Green Drive, Gilson Way And Church Close

    Discharge condition No. 11 following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • PL/2026/01498/DIS Awaiting decision

    36 Temple Road Dorridge Solihull B93 8LF

    Discharge of conditions 3 (Materials), 4 (Hard and Soft Landscaping), 6 (Surface Water), 7 (Demolition and Construction Management Plan), 8 (Protection Barriers), 10 (Bats) and 11 (Bat box) for planning permission PL/2025/02384/VAR dated 03.06.2026 for Variation of condition No. 1 following planning approval dated 01.08.2022 reference PL/2022/00208/MINFDW for Erection of replacement detached dwelling.

    Received 13 Aug, published by the council 24 Aug 2026 Conditions