Planning application

Lavender Hall Lane Overbridge Is Located Along The Existing Lavender Hall Lane Close To Its Junction With Park Lane, Northeast Of Balsall Common

Granted Solihull PL/2025/00470/S17DIS HS2 Schedule 17 Discharge of Conditions

Relates to PL/2023/02263/HS2DIS

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 2 (Materials) attached to PL/2023/02263/HS2DIS

As published by the council, reference PL/2025/00470/S17DIS

Application record

Reference
PL/2025/00470/S17DIS
Type
HS2 Schedule 17 Discharge of Conditions
Status
Decided
Decision
Approved
Received
7 Mar 2025
Validated
7 Mar 2025
Decided
4 Nov 2025
Ward
Meriden
Parish
Berkswell Parish Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 7 Mar 2025

    Received by Solihull

  2. 4 Nov 2025

    Decision issued: Approved

  3. 8 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Lavender Hall Lane Close To Its Junction With Park Lane, Northeast Of Balsall Common

    Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Construction of a highway overbridge (Lavender Hall Lane Overbridge) crossing the HS2 Main Line; and ancillary works including: Earthworks to form highways diversion including a concrete retaining crib wall; landscaping earthworks; drainage earthworks; earthworks to form a watercourse diversion and above ground earthworks and headwalls for Bayley's Brook culvert. Earthworks to form maintenance access tracks; location of permanent ecological fencing, boundary fencing and vehicle restraint barriers.

    Decided 11 Feb 2025

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Solihull granted permission on 4 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Solihull

  • 11 Featherstone Close Shirley Solihull B90 3RL

    Discharge of Condition 2 (Replacement tree) planning permission PL/2026/00152/TPO dated 14.04.2026 to Fell and remove 1 No. small silver birch tree (betula pendula)

    22 Jul 2026 Conditions
  • 1 Woodside Way Solihull B91 1HB

    Discharge condition Nos. 3- Materials, 7-CMS and 8- Levels following planning approval PL/2026/00549/PPFL- Erect replacment dwelling approved on 24.6.26 .

    20 Jul 2026 Conditions
  • Bulls Head Barston Lane Barston Solihull B92 0JU

    Discharge condition Nos. 3-Materials and 4-Written Scheme of Investigation (WSI) for a programme of archaeological work following planning approval PL/2025/02352/PPFL -Rebuilding of dilapidated barn and conversion into additional restaurant space. Installation of new doors and windows to existing opening and formation of new openings to connect the barn with the existing garden area. New patio to be formed. APPROVED 30-3-26

    5 May 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of condition 7 - Parts 1 and 2 (Phase 1B - Contaminated Land), 50 (Phase 2 - Demolition Phase Plan), 51 (Photographic Record - Phase 2), 54 - Parts 1 and 2 (Phase 2 and Phase 1C - Contaminated Land) and Biodiversity Net Gain Plan - Phase 1 of PL/2025/00547/MAJFDW.

    22 Apr 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of Condition Nos 3 (Demolition Phasing Plan - Phase 1), 4 (Record of Analysis of Buildings - Demolition - Phase 1), 5 Demolition Management Plan - Phase 1), 6 (Demolition and Construction Ecological Management Plan- Phase 1), 7 (Contaminated Land - Phase 1A), 8 (Tree Protection - Phase 1), 51 (Record of Buildings - Drury Lane Retail Units), 52 (Demolition Plan- Drury Lane Retail Units) and 53 (Demolition and Construction Ecological Plan - Phase 1C) following planning approval PL/2025/00547/MAJFDW.

    2 Apr 2026 Conditions