Planning application
Land Between Marsh Lane And A452 Kenilworth Road, Intersecting The River Blythe Bypass Watercourse
Relates to PL/2024/00431/HS2DIS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition 2 (Materials schedule) attached to PL/2024/00431/HS2DIS.
As published by the council, reference PL/2025/00287/S17DIS
Application record
- Reference
- PL/2025/00287/S17DIS
- Type
- HS2 Schedule 17 Discharge of Conditions
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 13 Feb 2025
- Validated
- 13 Feb 2025
- Decided
- 21 Oct 2025
- Ward
- Bickenhill
- Parish
- Hampton In Arden Parish Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Solihull register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
PL/2024/00431/HS2DIS Granted
Land Between Marsh Lane And A452 Kenilworth Road, Intersecting The River Blythe Bypass Watercourse
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: construction of a railway underbridge over the River Blythe Bypass watercourse (River Blythe Bypass Underbridge); earthworks to form a railway embankment (Blythe Bypass Embankment); and ancillary works including: earthworks for drainage ditches and a balancing pond; earthworks to form maintenance access tracks; landscape earthworks; provision of road vehicle parking; location of permanent security, ecological and boundary fencing; and construction of pipe outlet headwalls, and a culvert.
Timeline
Dates from the published record
-
13 Feb 2025
Received by Solihull
-
21 Oct 2025
Decision issued: Approved
-
8 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
PL/2024/00431/HS2DIS Granted
Land Between Marsh Lane And A452 Kenilworth Road, Intersecting The River Blythe Bypass Watercourse
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: construction of a railway underbridge over the River Blythe Bypass watercourse (River Blythe Bypass Underbridge); earthworks to form a railway embankment (Blythe Bypass Embankment); and ancillary works including: earthworks for drainage ditches and a balancing pond; earthworks to form maintenance access tracks; landscape earthworks; provision of road vehicle parking; location of permanent security, ecological and boundary fencing; and construction of pipe outlet headwalls, and a culvert.
Who's behind it
Company information only, from the register and Companies House
High Speed Two (HS2) Limited Applicant, registered in Birmingham
Active · incorporated 2009 · Birmingham
64 applications on PlanIndex · across 8 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
- DECISION NOTICE
- AMENDED MATERIALS SCHEDULE
- AMENDED DOCUMENT LIST
- BBV RESPONSE TO SMBC
- SUPERSEDED MATERIALS SCHEDULE
- SUPERSEDED PLANS AND DOCUMENT SCHEDULE
- COVERING LETTER
- APPLICATION DETAILS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Solihull granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Solihull
-
PL/2026/01665/DIS Awaiting decision
Mell Square Solihull
Discharge condition Nos. 52 - Phase 2 (Demolition Management Plan), 53 - Phase 2 (Demolition and Construction Ecological Management Plan), Part discharge of conditon 54 - Part 3 and Part 4 - Phase 2 (Contaminated land) and Informative 4 (Biodiversity Gain Plan - Phase 2) following planning approval PL/2025/00547/MAJFDW.
-
PL/2026/01598/DIS Awaiting decision
5 Marston Drive Kingshurst Solihull B37 6BD
Discharge condition 12 (Demolition and Construction Environmental Management Plan), 15 (Construction Environmental Management Plan) and 22 (Construction Management Plan) following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)
-
PL/2026/01588/DIS Awaiting decision
47 Lady Byron Lane Knowle Solihull B93 9AX
Discharge of condition 16 - Biodiversity of planning approval PL/2026/00624/PPFL- Replacment Dwelling - Approved 5.8.26.
-
PL/2026/01586/DIS Awaiting decision
Kingshurst Village Centre And Former Mountford Public House, Marston Drive, Over Green Drive, Gilson Way And Church Close
Discharge condition No. 11 following planning approval PL/2025/00880/VAR insofar as it relates to Phase 2 of the scheme as shown on Drawing Number M00526-RGP-20-XX-DR-A-0002-P13 (Proposed Site Phasing Plan)
-
PL/2026/01498/DIS Awaiting decision
36 Temple Road Dorridge Solihull B93 8LF
Discharge of conditions 3 (Materials), 4 (Hard and Soft Landscaping), 6 (Surface Water), 7 (Demolition and Construction Management Plan), 8 (Protection Barriers), 10 (Bats) and 11 (Bat box) for planning permission PL/2025/02384/VAR dated 03.06.2026 for Variation of condition No. 1 following planning approval dated 01.08.2022 reference PL/2022/00208/MINFDW for Erection of replacement detached dwelling.