Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The West Of Henbury Drive Chelmsley Wood Solihull

Granted Solihull PL/2024/02981/PPFL Major Full Dwellings

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full application for the erection of 177 residential dwellings (Use Class C3) including associated access, public open space, noise and flood attenuation measures.

As published by the council, reference PL/2024/02981/PPFL

Application record

Reference
PL/2024/02981/PPFL
Type
Major Full Dwellings
Status
Decided
Decision
Granted As published: Approved
Received
18 Dec 2024
Validated
16 Jan 2025
Decided
18 Mar 2026
Ward
Chelmsley Wood
Parish
Chelmsley Wood Town Council
Decision by
Delegated Decision With Objections

Site history

Applications at this address on the Solihull register

This site has had 5 applications since 2024: 1 approved, 0 refused.

  • PL/2026/01200/DIS Awaiting decision

    Land To The West Of Henbury Drive, Chelmsley Wood, Solihull

    Discharge of conditions 4 (partial discharge - noise barrier element only) and 30 (noise barrier) attached to planning permission PL/2024/02981/PPFL

    Submitted 25 Jun 2026 Conditions
  • PL/2026/01071/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge condition No. 21 (lighting design strategy for biodiversity) attached to planning permission PL/2024/02981/PPFL

    Submitted 5 Jun 2026 Conditions
  • PL/2026/00855/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge of 13 (Soft Landscape Works), 14 (Open Space), 15 (Locally Equipped Area for Play), 16 (Landscape & Biodiversity), 17 (Landscape Management Plan), 18 (Landscape and Ecology Management Plan) and 20 (Habitat Management and Monitoring Plan) attached to planning permission PL/2024/02981/PPFL

    Submitted 1 May 2026 Conditions
  • PL/2026/00856/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge of condition 3 (Schedule of Materials), 23 (Surface Water), 25 (Foul and Surface Water), 29 (Air Quality Mitigation) and 35 (Estate Roads (including footways and cycleways)) attached to planning permission PL/2024/02981/PPFL

    Submitted 1 May 2026 Conditions

Timeline

Dates from the published record

  1. 18 Dec 2024

    Received by Solihull

  2. 16 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 18 Mar 2026

    Decision issued: Approved

  4. 8 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

6 later applications on the register refer to this one:

  • PL/2026/01200/DIS Awaiting decision

    Land To The West Of Henbury Drive, Chelmsley Wood, Solihull

    Discharge of conditions 4 (partial discharge - noise barrier element only) and 30 (noise barrier) attached to planning permission PL/2024/02981/PPFL

    Submitted 25 Jun 2026 Conditions
  • PL/2026/01071/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge condition No. 21 (lighting design strategy for biodiversity) attached to planning permission PL/2024/02981/PPFL

    Submitted 5 Jun 2026 Conditions
  • PL/2026/00855/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge of 13 (Soft Landscape Works), 14 (Open Space), 15 (Locally Equipped Area for Play), 16 (Landscape & Biodiversity), 17 (Landscape Management Plan), 18 (Landscape and Ecology Management Plan) and 20 (Habitat Management and Monitoring Plan) attached to planning permission PL/2024/02981/PPFL

    Submitted 1 May 2026 Conditions
  • PL/2026/00856/DIS Awaiting decision

    Land To The West Of Henbury Drive Chelmsley Wood Solihull

    Discharge of condition 3 (Schedule of Materials), 23 (Surface Water), 25 (Foul and Surface Water), 29 (Air Quality Mitigation) and 35 (Estate Roads (including footways and cycleways)) attached to planning permission PL/2024/02981/PPFL

    Submitted 1 May 2026 Conditions
  • Land To The West Of Henbury Drive, Chelmsley Wood

    Discharge of condition 8 (Arboricultural and Construction Method Statement) 9 (Arboricultural Method Statement) 10 (Arboricultural Method Statement), 11 (Veteran Tree Management Plan) and 19 (Construction Environmental Management Plan (Biodiversity)) attached to planning permission PL/2024/02981/PPFL

    Decided 14 Sep 2026
  • PL/2026/00598/DIS Awaiting decision

    Land To The West Of Henbury Drive, Chelmsley Wood, Solihulll

    Discharge of conditions 27 (Contamination), 28 (Construction Environmental Management Plan) and 37 (Construction Management Plan) attached to planning permission PL/2024/02981/PPFL

    Submitted 26 Mar 2026 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

328 documents on file for this application

  • APPENDIX 1 COMMENCEMENT NOTICE FOR PLANNING PERMISSION Report · 12 Aug 2026
  • SECTION 111 & 106 AGREEMENT (REDACTED) Decision · 19 Mar 2026
  • DECISION NOTICE Decision · 18 Mar 2026
  • LPA REPORT Report · 13 Mar 2026
  • LPA REPORT APPENDIX B Report · 13 Mar 2026
  • DRAFT DECISION NOTICE Decision · 13 Mar 2026
  • DRAFT S106 Decision · 13 Mar 2026
  • POS MANAGEMENT PLAN Drawing · 12 Mar 2026
  • OPEN SPACE TYPOLOGY PLAN Drawing · 12 Mar 2026
  • LOCATION PLAN Drawing · 05 Mar 2026
  • SMBC HIGHWAYS 30.01.26 Consultee Comment · 02 Feb 2026
  • VEHICLE TRACKING-REFUSE Drawing · 09 Jan 2026
  • SMBC - HIGHWAYS 07.01.26 Correspondence · 08 Jan 2026
  • NATIONAL HIGHWAYS DEC 25 Consultee Comment · 07 Jan 2026
  • SMBC LANDSCAPE 10.12.25 Consultee Comment · 11 Dec 2025
  • SUPERSEDED - POS MANAGEMENT PLAN Drawing · 09 Dec 2025
  • SUPERSEDED - OPEN SPACE TYPOLOGY Drawing · 09 Dec 2025
  • PARKING PLAN Drawing · 09 Dec 2025
  • CHARACTER PLAN Drawing · 09 Dec 2025
  • FIRE STRATEGY PLAN Drawing · 09 Dec 2025
  • REFUSE STRATEGY PLAN Drawing · 09 Dec 2025
  • SURFACE TREATMENTS PLAN Drawing · 09 Dec 2025
  • BOUNDARY TREATMENTS PLAN Drawing · 09 Dec 2025
  • MATERIALS PLAN Drawing · 09 Dec 2025
  • SITE LAYOUT BW Drawing · 09 Dec 2025
  • SITE LAYOUT Drawing · 09 Dec 2025
  • LEVELS STRATEGY Drawing · 09 Dec 2025
  • DRAINAGE STRATEG Drawing · 09 Dec 2025
  • URBAN DESIGN 08.12.25 Consultee Comment · 08 Dec 2025
  • SUPERSEDED- POS MANAGEMENT PLAN Drawing · 08 Dec 2025
  • SUPERSEDED - OPEN SPACE TYPOLOGY PLAN Drawing · 08 Dec 2025
  • NOISE ASSESSMENT NOV 25 Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - NOISE SECTIONS Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - C_10M_V_8M_SOUND_LEVEL_CHANGE Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - C_10M_V_7M_SOUND_LEVEL_CHANGE Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - B DAYTIME PREDICTIONS 8 M BARRIER Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - B DAYTIME PREDICTIONS 7 M BARRIER Report · 04 Dec 2025
  • NOISE ASSESSMENT NOV 25 - B DAYTIME PREDICTIONS 10 M BARRIER Report · 04 Dec 2025
  • APPLICANT NOTE PROPOSED NOISE MITIGATION 04.12.25 Report · 04 Dec 2025
  • B DAYTIME PREDICTIONS 8 M BARRIER Report · 04 Dec 2025
  • SUPERSEDED - BOUNDARY TREATMENTS PLAN Drawing · 04 Dec 2025
  • SUPERSEDED - SITE LAYOUT Drawing · 04 Dec 2025
  • APPLICANT NOTE ON VETERAN TREE PROTECTION 1 OF 2 Report · 04 Dec 2025
  • APPLICANT NOTE ON VETERAN TREE PROTECTION 2 OF 2 Report · 04 Dec 2025
  • APPLICANT RESPONSE TO URBAN DESIGN 1 OF 2 Report · 04 Dec 2025
  • APPLICANT RESPONSE TO URBAN DESIGN 2 OF 2 Report · 04 Dec 2025
  • PEDESTRIAN CROSSING POINT UPGRADE Drawing · 28 Nov 2025
  • VEHICLE TRACKING - REFUSE Drawing · 28 Nov 2025
  • VEHICLE TRACKING - FIRE Drawing · 28 Nov 2025
  • APPLICANT RESPONSE TO SMBC HIGHWAYS Report · 28 Nov 2025
  • WRAT ASSESSMENT INC WALKING ROUTE AUDIT Report · 28 Nov 2025
  • ECOLOGY 24.11.25 Consultee Comment · 26 Nov 2025
  • SUPERSEDED - POS MANAGEMENT PLAN Drawing · 26 Nov 2025
  • SUPERSEDED - OPEN SPACE TYPOLOGY PLAN Drawing · 26 Nov 2025
  • APPLICANT RESPONSE TO SMBC LANDSCAPE Report · 26 Nov 2025
  • BNG MAP V5 Drawing · 21 Nov 2025
  • ECOLOGICAL IMPACT ASSESSMENT - REV 3 Report · 21 Nov 2025
  • STATUTORY BIODIVERSITY METRIC CALCULATION TOOL - REV 2 Report · 21 Nov 2025
  • SMBC PUBLIC PROTECTION (AIR QUALITY) 30.09.25 Consultee Comment · 18 Nov 2025
  • SMBC LANDSCAPE 17.11.25 Consultee Comment · 18 Nov 2025
  • EMERGENCY ACCESS Drawing · 12 Nov 2025
  • S278 SITE ENTRANCE WORKS Drawing · 12 Nov 2025
  • HIGHWAY AUTHORITY SEARCH Report · 12 Nov 2025
  • APPLICANT RESPONSE TO HIGHWAY COMMENTS 20.10.25 Report · 12 Nov 2025
  • SMBC URBAN DESIGN 11.11.2 Consultee Comment · 11 Nov 2025
  • SMBC ECOLOGY 07.11.25 Consultee Comment · 07 Nov 2025
  • SMBC - PUBLIC PROTECTION Consultee Comment · 06 Nov 2025
  • NATIONAL HIGHWAYS 30.10.25 Consultee Comment · 31 Oct 2025
  • SMBC HIGHWAYS 20.10.25 Consultee Comment · 29 Oct 2025
  • ECOLOGICAL IMPACT ASSESSMENT - REV 2 Report · 29 Oct 2025
  • ALTERNATIVE TENURE PLAN Drawing · 29 Oct 2025
  • APPLICANT NOTE ON SMBC CONSULTEE COMMENTS Report · 09 Oct 2025
  • APPLICANT RESPONSE TO SMBC CONSULTEE COMMENTS Report · 09 Oct 2025
  • BRINDLE AND GREEN NOTE Report · 09 Oct 2025
  • NOISE TECHNICAL NOTE DATED 08.10.25 Report · 09 Oct 2025
  • SMBC HIGHWAYS 03.10.25 Consultee Comment · 03 Oct 2025
  • SMBC LANDSCAPE 11.09.25 1 OF 2 Consultee Comment · 12 Sep 2025
  • SMBC LANDSCAPE 11.09.25 2 OF 2 Consultee Comment · 12 Sep 2025
  • NATIONAL HIGHWAYS 05.09.25 Consultee Comment · 05 Sep 2025
  • SMBC - URBAN DESIGN 02.09.25 Consultee Comment · 02 Sep 2025
  • ECOLOGY 15.08.25 Consultee Comment · 15 Aug 2025
  • SMBC - PUBLIC PROTECTION Consultee Comment · 13 Aug 2025
  • RIVERSIDE VIEW Drawing · 12 Aug 2025
  • HT 122-URBAN EDGE Drawing · 12 Aug 2025
  • HT 122-CENTRAL BOULEVARD Drawing · 12 Aug 2025
  • HT463 RIVERSIDE VIEW RENDER Drawing · 12 Aug 2025
  • HT463 CENTRAL BOULEVARD GABLE Drawing · 12 Aug 2025
  • HT463 CENTRAL BOULEVARD Drawing · 12 Aug 2025
  • HT463 CENTRAL BOULEVARD RENDER Drawing · 12 Aug 2025
  • HT463 RIVERSIDE VIEW Drawing · 12 Aug 2025
  • HT352 CENTRAL BOULEVARD GABLE Drawing · 12 Aug 2025
  • HT352 CENTRAL BOULEVARD Drawing · 12 Aug 2025
  • HT 352-CENTRAL BOULEVARD RENDER Drawing · 12 Aug 2025
  • HT 352-CENTRAL BOULEVARD V2 Drawing · 12 Aug 2025
  • HT352 RIVERSIDE VIEW GABLE Drawing · 12 Aug 2025
  • HT352 RIVERSIDE VIEW RENDER Drawing · 12 Aug 2025
  • HT352 URBAN EDGE GABLE Drawing · 12 Aug 2025
  • HT352 URBAN EDGE Drawing · 12 Aug 2025
  • HT242 RIVERSIDE VIEW GABLE Drawing · 12 Aug 2025
  • HT242 RIVERSIDE VIEW Drawing · 12 Aug 2025
  • HT242 RIVERSIDE VIEW RENDER Drawing · 12 Aug 2025
  • HT242 CENTRAL BOULEVARD GABLE Drawing · 12 Aug 2025
  • HT242 CENTRAL BOULEVARD Drawing · 12 Aug 2025
  • HT242 CENTRAL BOULEVARD RENDER Drawing · 12 Aug 2025
  • HT242 URBAN EDGE GABLE Drawing · 12 Aug 2025
  • HT242 URBAN EDGE Drawing · 12 Aug 2025
  • LEAP GENERAL ARRANGEMENT Drawing · 12 Aug 2025
  • GENERAL ARRANGEMENT PLAN Drawing · 12 Aug 2025
  • SOFT LANDSCAPE PROPOSALS 1OF4 Drawing · 12 Aug 2025
  • SOFT LANDSCAPE PROPOSALS 2OF4 Drawing · 12 Aug 2025
  • SOFT LANDSCAPE PROPOSALS 3OF4 Drawing · 12 Aug 2025
  • SOFT LANDSCAPE PROPOSALS 4OF4 Drawing · 12 Aug 2025
  • SUPERSEDED - MATERIALS PLAN Drawing · 12 Aug 2025
  • SUPERSEDED- CHARACTER AREAS PLAN Drawing · 12 Aug 2025
  • CHARACTER TYPE PALETTE Drawing · 12 Aug 2025
  • STREET SCENES Drawing · 12 Aug 2025
  • ACOUSTIC BARRIER BROCHURE Report · 12 Aug 2025
  • APPLICANT NOTE ON NOISE ASSESSMENT AUGUST 2025 Report · 12 Aug 2025
  • APPLICANT NOTE ON URBAN DESIGN COMMENTS Report · 12 Aug 2025
  • APPLICANT RESPONSE TO URBAN DESIGN COMMENTS Report · 12 Aug 2025
  • NOISE ASSESSMENT AUGUST 2025 Report · 12 Aug 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 11 Aug 2025
  • SMBC - AFFORDABLE HOUSING Consultee Comment · 05 Aug 2025
  • SMBC - URBAN DESIGN Consultee Comment · 30 Jul 2025
  • ECOLOGICAL IMPACT ASSESSMENT - 1 OF 5 Report · 29 Jul 2025
  • ECOLOGICAL IMPACT ASSESSMENT - 2 OF 5 Report · 29 Jul 2025
  • ECOLOGICAL IMPACT ASSESSMENT - 3 OF 5 Report · 29 Jul 2025
  • ECOLOGICAL IMPACT ASSESSMENT - 4 OF 5 Report · 29 Jul 2025
  • ECOLOGICAL IMPACT ASSESSMENT - 5 OF 5 Report · 29 Jul 2025
  • HT B1 HT 122 COMPARISON Drawing · 28 Jul 2025
  • DOUBLE CARPORT Drawing · 28 Jul 2025
  • DOUBLE CARPORT Drawing · 28 Jul 2025
  • SINGLE CARPORT Drawing · 28 Jul 2025
  • SINGLE CARPORT Drawing · 28 Jul 2025
  • HT 352 COMPARISON Drawing · 28 Jul 2025
  • SUPERSEDED HT 122 V2- PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 122 V1- PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 122 V1- PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 122 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 463 V2 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 463 V1 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 463 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V6 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V5.1 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V5 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V4 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V3 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V2 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 352 V1 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V6 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V5 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V4 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V3 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V2 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED HT 242 V1 - PLANS AND ELEVATIONS Drawing · 28 Jul 2025
  • SUPERSEDED - OPEN SPACE TYPOLOGY PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - PARKING PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - CHARACTER AREAS PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - ALTERNATIVE TENURE PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - FIRE STRATEGY PLAN Drawing · 28 Jul 2025
  • REFUSE AND CYCLE STORAGE STRATEGY PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - SURFACE TREATMENTS Drawing · 28 Jul 2025
  • SUPERSEDED - BOUNDARY TREATMENTS PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - MATERIALS PLAN Drawing · 28 Jul 2025
  • SUPERSEDED - SITE LAYOUT B&W Drawing · 28 Jul 2025
  • SUPERSEDED - SITE LAYOUT Drawing · 28 Jul 2025
  • DAS ADDENDUM Report · 28 Jul 2025
  • SUPERSEDED - STREET SCENES Drawing · 28 Jul 2025
  • SUPERSEDED - DRAINAGE STRATEGY Drawing · 28 Jul 2025
  • SUPERSEDED - LEVELS STRATEGY Drawing · 28 Jul 2025
  • HIGHWAYS VISIBILITY LAYOUT Drawing · 28 Jul 2025
  • SITE ENTRANCE - S278 WORKS Drawing · 28 Jul 2025
  • RESIDENTIAL TRAVEL PLAN JULY 2025 Report · 28 Jul 2025
  • TRANSPORT TECHNICAL NOTE JULY 2025 Report · 28 Jul 2025
  • NOISE ASSESSMENT ADDENDUM Report · 28 Jul 2025
  • STATUTORY BIODIVERSITY METRIC CALCULATION TOOL - REV1 Report · 28 Jul 2025
  • NOISE BARRIER (GREENSOUNDBLOK SYSTEM) Report · 28 Jul 2025
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 28 Jul 2025
  • ARBORICULTURAL METHOD STATEMENT Report · 28 Jul 2025
  • ARBORICULTURAL IMPACTS PLANS (3 PLANS) Drawing · 28 Jul 2025
  • TREE CONSTRAINTS PLANS (3 PLANS) Drawing · 28 Jul 2025
  • TREE PROTECTION PLANS (8 PLANS) Drawing · 28 Jul 2025
  • AIR QUALITY TECHNICAL NOTE Report · 28 Jul 2025
  • LANDSCAPE MASTERPLAN Report · 28 Jul 2025
  • COVERING LETTER 23 JULY 2025 Report · 28 Jul 2025
  • COVERING LETTER 23 JULY 2025 - APPENDIX A Report · 28 Jul 2025
  • COVERING LETTER 23 JULY 2025 - APPENDIX B Report · 28 Jul 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 24 Jun 2025
  • THERMAL MODEL ASSESSMENT (PART O) MAY 2025 Report · 05 Jun 2025
  • APPLICANTS RESPONSE TO LLFA Report · 05 Jun 2025
  • SMBC HIGHWAYS 05.06.25 Consultee Comment · 05 Jun 2025
  • ECOLOGY 30.05.25 Consultee Comment · 30 May 2025
  • SMBC - DRAINAGE & LLFA 23.05.25 Consultee Comment · 23 May 2025
  • NATIONAL HIGHWAYS MAY COMMENTS Consultee Comment · 07 May 2025
  • APPLICANT RESPONSE TO LLFA COMMENTS DATED 10.04.25 Report · 02 May 2025
  • SMBC PLANNING POLICY 22.04.25 Consultee Comment · 29 Apr 2025
  • ENVIRONMENT AGENCY 24.04.25 Consultee Comment · 28 Apr 2025
  • WEST MIDLANDS FIRE SERVICE Public Comment · 10 Apr 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 10 Apr 2025
  • SMBC - CONTAMINATED LAND Consultee Comment · 02 Apr 2025
  • SMBC AFFORDABLE HOUSING 31.03.25 Consultee Comment · 01 Apr 2025
  • DRAINAGE STATEMENT REV 2 MARCH 2025 Report · 25 Mar 2025
  • SUPERSEDED - LEVELS STRATEGY Drawing · 25 Mar 2025
  • SUPERSEDED - DRAINAGE STRATEGY Drawing · 25 Mar 2025
  • BIRMINGHAM AND SOLIHULL ICB 24.03.25 Consultee Comment · 25 Mar 2025
  • PUBLIC HEALTH ? LEISURE AND PHYSICAL ACTIVITY 14.03.2 Consultee Comment · 14 Mar 2025
  • RSK ENVIRONMENT - RESPONSE TO HEALTH OFFICER (REDACTED) Report · 13 Mar 2025
  • SMBC PUBLIC PROTECTION (NOISE) - 25.2.25 Consultee Comment · 03 Mar 2025
  • SMBC LANDSCAPE 21.02.25 Consultee Comment · 24 Feb 2025
  • SMBC CONTAMINATED LAND 21.02.25. Consultee Comment · 24 Feb 2025
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 24 Feb 2025
  • SMBC PUBLIC PROTECTION (AIR QUALITY). Consultee Comment · 19 Feb 2025
  • SEVERN TRENT Consultee Comment · 18 Feb 2025
  • SITE LAYOUT - GREEN BELT AND ALLOCATION BOUNDARY Drawing · 12 Feb 2025
  • SMBC - URBAN DESIGN Consultee Comment · 11 Feb 2025
  • TFWM 10.02.2025 Consultee Comment · 10 Feb 2025
  • ENVIRONMENT AGENCY 07.02.25. Consultee Comment · 07 Feb 2025
  • NATIONAL HIGHWAYS 07.02.25 Consultee Comment · 07 Feb 2025
  • SMBC EDUCATION 1 OF 2 Consultee Comment · 04 Feb 2025
  • SMBC EDUCATION 2 OF 2 Consultee Comment · 04 Feb 2025
  • SMBC - DRAINAGE & LLFA Consultee Comment · 03 Feb 2025
  • WEST MIDLANDS POLICE Consultee Comment · 28 Jan 2025
  • SMBC HISTORIC ENVIRONMENT Consultee Comment · 23 Jan 2025
  • SMBC - HERITAGE ASSETS Consultee Comment · 23 Jan 2025
  • TRANSPORT ASSESSMENT Report · 16 Jan 2025
  • SUPERSEDED - DESIGN & ACCESS STATEMENT - REV 3 Report · 16 Jan 2025
  • BIODIVERSITY METRIC CALCULATION TOOL Report · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN LANDSCAPE SCHEDULE Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 8 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 7 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 6 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 5 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 4 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 3 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 2 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - POS PLANTING PLAN 1 OF 8 Drawing · 16 Jan 2025
  • SUPERSEDED - LANDSCAPE SCHEDULE 2 OF 2 Drawing · 16 Jan 2025
  • SUPERSEDED - LANDSCAPE SCHEDULE 1 OF 2 Drawing · 16 Jan 2025
  • SUPERSEDED - HARD LANDSCAPING PLAN 4 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - HARD LANDSCAPING PLAN 3 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - HARD LANDSCAPING PLAN 2 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - HARD LANDSCAPING PLAN 1 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - DETAILED PLANTING PLAN 4 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - DETAILED PLANTING PLAN 3 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - DETAILED PLANTING PLAN 2 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - DETAILED PLANTING PLAN 1 OF 4 Drawing · 16 Jan 2025
  • SUPERSEDED - ALL POS PLANTING PLANS Drawing · 16 Jan 2025
  • SUPERSEDED - ALL HARD LANDSCAPING PLANS Drawing · 16 Jan 2025
  • SUPERSEDED - ALL DETAILED PLANTING PLANS Drawing · 16 Jan 2025
  • DARREN EVANS LETTER DATED 26TH FEBRUARY 2023? Report · 23 Dec 2024
  • FLOOD RISK ASSESSMENT Report · 23 Dec 2024
  • APPLICATION FORM REDACTED Application Form · 18 Dec 2024
  • PLANNING STATEMENT - APPENDIX 1 Report · 18 Dec 2024
  • PLANNING ISSUE REGISTER Report · 18 Dec 2024
  • COMBINED PLANNING COMPLIANCE AND AFFORDABLE HOUSING STATEMENT Report · 18 Dec 2024
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 18 Dec 2024
  • SUPERSEDED - SURFACE TREATMENTS Drawing · 18 Dec 2024
  • SUPERSEDED - REFUSE STRATEGY PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - TENURE PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - FIRE STRATEGY PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE Drawing · 18 Dec 2024
  • SUPERSEDED - URBAN EDGE GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW Drawing · 18 Dec 2024
  • SUPERSEDED - RIVERSIDE VIEW GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD Drawing · 18 Dec 2024
  • SUPERSEDED - CENTRAL BOULEVARD GABLE Drawing · 18 Dec 2024
  • SUPERSEDED - DESIGN AND ACCESS STATEMENT Report · 18 Dec 2024
  • SUPERSEDED - SITE LAYOUT Drawing · 18 Dec 2024
  • SUPERSEDED - LOCATION PLAN Drawing · 18 Dec 2024
  • SUPERSEDED - SITE LAYOUT BW Drawing · 18 Dec 2024
  • SUPERSEDED - MATERIALS PLAN Drawing · 18 Dec 2024
  • SUPERSEDED BOUNDARY TREATMENTS PLAN Drawing · 18 Dec 2024
  • RESIDENTIAL TRAVEL PLAN Report · 18 Dec 2024
  • PLANNING STATEMENT - APPENDIX 2 (1 OF 2) Report · 18 Dec 2024
  • PLANNING STATEMENT - APPENDIX 2 (2 OF 2) Report · 18 Dec 2024
  • NOISE ASSESSMENT ? INTERNAL AND EXTERNAL Report · 18 Dec 2024
  • DRAINAGE STATEMENT Report · 18 Dec 2024
  • SUPERSEDED - SITE ENTRANCE STRATEGY Drawing · 18 Dec 2024
  • SUPERSEDED - DRAINAGE STRATEGY Drawing · 18 Dec 2024
  • SUPERSEDED - LEVELS STRATEGY Drawing · 18 Dec 2024
  • SUPERSEDED - NOISE SECTIONS Drawing · 18 Dec 2024
  • NOISE AND TREE DISCUSSION SECTIONS Report · 18 Dec 2024
  • TOPOGRAPHICAL SURVEY SHEET 1 Drawing · 18 Dec 2024
  • TOPOGRAPHICAL SURVEY SHEET 2 Drawing · 18 Dec 2024
  • AIR QUALITY ASSESSMENT Report · 18 Dec 2024
  • NOISE ASSESSMENT Report · 18 Dec 2024
  • DIGBY ARCHAEOLOGICAL DESK-BASED ASSESSMENT Report · 18 Dec 2024
  • HERITAGE STATEMENT - REV1 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 1 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 2 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 3 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 4 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 5 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 6 Report · 18 Dec 2024
  • ECOLOGICAL IMPACT ASSESSMENT 7 Report · 18 Dec 2024
  • SUPERSEDED - LANDSCAPE MASTERPLAN Drawing · 18 Dec 2024
  • SUPERSEDED - ARBORICULTURAL METHOD STATEMENT Report · 18 Dec 2024
  • SUPERSEDED - ARBORICULTURAL IMPACT ASSESSMENT Report · 18 Dec 2024
  • AIA APPENDIX 2 TO 6 Report · 18 Dec 2024
  • SUPERSEDED - STREET SCENES Drawing · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 1 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 2 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 3 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 4 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 5 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 6 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 7 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 8 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 9 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 10 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 12 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 13 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 14 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 15 Report · 18 Dec 2024
  • GEOENVIRONMENTAL AND GEOTECHNICAL INTERPRETATIVE REPORT 11 Report · 11 Dec 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Solihull granted permission on 18 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Solihull

  • PL/2026/01590/PPFL Awaiting decision

    46 Lovelace Avenue Solihull B91 3JR

    Erection of one house to the rear of 46 Lovelace Avenue with associated works to 46 Lovelace Avenue including separate new driveway entrance for new dwelling.

    Received 27 Aug, published by the council 2 Sep 2026 Full applications
  • PL/2026/01559/PPFL Awaiting decision

    The Royal Star And Garter Homes 26 Tudor Coppice Solihull B91 3DE

    Construction of new glazed terrace screening to the first floor.

    Received 21 Aug, published by the council 14 Sep 2026 Full applications
  • PL/2026/01557/PPFL Awaiting decision

    10 Links Drive Solihull B91 2DL

    Change of use from dwelling house (Use Class C3) to serviced guest house accommodation (Use Class C1), including associated vehicular parking, cycle storage, dedicated external refuse storage, and landscaped amenity space.

    Received 21 Aug, published by the council 2 Sep 2026 Full applications
  • PL/2026/01550/PPFL Awaiting decision

    Four Ashes Golf Centre Four Ashes Road Dorridge Solihull B93 8NQ

    Erection of two canopies over padel courts.

    Received 20 Aug, published by the council 25 Sep 2026 Full applications
  • Olton Reservoir Warwick Road Olton Solihull

    Erect fence and entrance gates.

    Received 20 Feb, published by the council 23 Jul 2026 Full applications