Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Intersecting Park Lane, To The North Of Lavender Hall Lane, Balsall Common

Granted Solihull PL/2024/02665/HS2DIS HS2 Section 17 (DIS)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Construction of a railway overbridge incorporating a dormouse truss (Footpath M214 Overbridge) and ancillary works including: Engineering earthworks to alter ground level on the approaches to the overbridge, supporting the vertical realignment of Footpath M214; maintenance access staircases below the overbridge with associated handrails; provision of two concrete benches; and permanent boundary fencing.

As published by the council, reference PL/2024/02665/HS2DIS

Application record

Reference
PL/2024/02665/HS2DIS
Type
HS2 Section 17 (DIS)
Status
Decided
Decision
Approved
Received
31 Oct 2024
Validated
31 Oct 2024
Decided
20 Mar 2025
Ward
Meriden
Parish
Berkswell Parish Council
Decision by
Delegated Decision With Objections

Site history

Applications at this address on the Solihull register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • Land Intersecting Park Lane, To The North Of Lavender Hall Lane, Balsall Common

    Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Engineering earthworks to form a railway cutting (Park Lane Cutting); earthworks for the realignment of a section of Park Lane; earthworks to form maintenance access tracks (two of which will also support public footpath diversions) and vehicle parking turning areas; earthworks to support the realignment of Footpath M215; earthworks to form landscape bunds and earthen berms; earthworks to form six ecological ponds; earthworks to form a watercourse diversion, drainage ditches and land drainage; culvert headwalls; earthworks to form two Global System for Mobile Communications-Railway (GSM-R) compounds; two sets of access stairs adjacent to Footpath M215 Overbridge and one set of stairs north of Lavender Hall Lane; provision of a ditch crossing slab; provision of pole mounted wooden bat structures; and location of permanent, ecological and boundary fencing and vehicle restraint system (VRS).

    Decided 17 Mar 2026
  • Land Intersecting Park Lane, To The North Of Lavender Hall Lane, Balsall Common.

    Plans and Specifications under Schedule 17 to the High Speed Rail (London-West Midlands) Act 2017 for works comprising: Construction of Footpath M215 Overbridge to accommodate a realigned Public Right of Way (Footpath M215) as well as an accommodation farm access and maintenance access track, including landscaped earthworks.

    Decided 24 Oct 2024

Timeline

Dates from the published record

  1. 31 Oct 2024

    Received by Solihull

  2. 20 Mar 2025

    Decision issued: Approved

  3. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

36 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Solihull granted permission on 20 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Solihull's portal will say. Our guide explains the common types.