Planning application
72 Dove House Lane Solihull B91 2EG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement 1 No. dwelling.
As published by the council, reference PL/2024/02119/PPFL
Application record
- Reference
- PL/2024/02119/PPFL
- Type
- Minor Full Dwellings
- Status
- Decided
- Decision
- Approved
- Received
- 9 Oct 2024
- Validated
- 30 Oct 2024
- Decided
- 17 Dec 2024
- Ward
- Olton
- Parish
- Non-Civil Parish Or Community
- Decision by
- Delegated Decision
- Postcode
- B91 2EG
Timeline
Dates from the published record
-
9 Oct 2024
Received by Solihull
-
30 Oct 2024
Validated
Checked as complete and ready for consideration.
-
17 Dec 2024
Decision issued: Approved
-
31 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Solihull
31 applications on PlanIndex · across 5 councils · 78% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
72 Dove House Lane Solihull B91 2EG
Part demolition of the existing building, extension to the rear and side and loft conversation.
Granted Householder Extension Demolition 20 docsDomestic -
87 Dove House Lane Solihull B91 2EQ
Removal of part of single storey existing and reinstate part of the external side passageway. Single storey side and rear wraparound extension
Granted Householder Extension 12 docsSmall domestic -
119 Dove House Lane Solihull B91 2EQ
Prior notification for a ground floor rear extension measuring 8m beyond the original rear wall, at a maximum height of 3.9m, and measuring 2.5m at the eaves.
Refused Prior approval Extension 3 docs -
119 Dove House Lane Solihull B91 2EQ
Prior notification for a ground floor rear extension measuring 8m beyond the original rear wall, at a maximum height of 3.9m, and measuring 2.6m at the eaves.
Refused Prior approval Extension 7 docs -
253 Ulverley Green Road Olton Solihull B92 8AD
Rear side two storey and rear single storey extension.
Granted Householder Extension 5 docsSmall domestic -
253 Ulverley Green Road Olton Solihull B92 8AD
Prior notification for a ground floor rear kitchen/dining room extension 6m beyond the original rear wall, at a maximum height of 3m, and measuring 2.6m at the eaves.
Refused Prior approval Extension 4 docs
Other full applications applications
In Solihull
-
PL/2025/00153/PPFL Granted
Land Off The Grove Hampton In Arden Solihull
Demolition of redundant kennels and erection of a dwelling.
-
PL/2026/00860/PPFL Granted
34 Creynolds Lane Cheswick Green Solihull B90 4ER
Addition of a first floor to the existing bungalow to form a two storey dwelling, as well as proposed front and rear extensions.
-
PL/2026/00348/PPFL Granted
Olton Reservoir Warwick Road Olton Solihull
Erect fence and entrance gates.
-
PL/2025/01590/PPFL Refused
78 Prospect Lane Solihull B91 1HS
Erect new two storey dwelling.
-
PL/2025/00341/PPFL Refused
The Barn Knowle Road Eastcote Solihull
Retrospective application for the retention of the as built dwelling.