Planning application

HS2 Compounds Access From Waste Lane, Balsall Common

Granted Solihull PL/2023/02283/S17DIS HS2 Schedule 17 Discharge of Conditions

Relates to PL/2023/01957/HS2NMC

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition No. 1 (Highway mitigation measures) of PL/2023/01957/HS2NMC.

As published by the council, reference PL/2023/02283/S17DIS

Application record

Reference
PL/2023/02283/S17DIS
Type
HS2 Schedule 17 Discharge of Conditions
Status
Decided
Decision
Approved
Received
31 Oct 2023
Validated
31 Oct 2023
Decided
10 Nov 2023
Ward
Meriden
Parish
Berkswell Parish Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 31 Oct 2023

    Received by Solihull

  2. 10 Nov 2023

    Decision issued: Approved

  3. 19 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • HS2 Compounds Waste Lane Balsall Common Solihull

    Non-material amendment to the wording of condition 1 attached to Schedule 17 consent (appeal ref APP/HS2/19; Local Planning Authority ref PL/2022/00256/HS2DIS), under Schedule 17 (21) of the High Speed Rail (London-West Midlands) Act 2017, comprising a lorry route under Schedule 17 (6) of the High Speed Rail (London-West Midlands) Act 2017, to the following work sites: Carol Green Rail Underbridge South Satellite Compound; Waste Lane East and West Road Head; Beechwood Farm Accommodation Underpass; Waste Lane Overbridge Satellite Compound; and Cromwell Lane Satellite Compound. Inbound Route: Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route: Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN. For Carol Green Rail Underbridge (South), Cromwell Lane and Beechwood Farm Accommodation Underpass the inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location.

    Decided 29 Sep 2023 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Solihull granted permission on 10 November 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Solihull

  • 11 Featherstone Close Shirley Solihull B90 3RL

    Discharge of Condition 2 (Replacement tree) planning permission PL/2026/00152/TPO dated 14.04.2026 to Fell and remove 1 No. small silver birch tree (betula pendula)

    22 Jul 2026 Conditions
  • 1 Woodside Way Solihull B91 1HB

    Discharge condition Nos. 3- Materials, 7-CMS and 8- Levels following planning approval PL/2026/00549/PPFL- Erect replacment dwelling approved on 24.6.26 .

    20 Jul 2026 Conditions
  • Bulls Head Barston Lane Barston Solihull B92 0JU

    Discharge condition Nos. 3-Materials and 4-Written Scheme of Investigation (WSI) for a programme of archaeological work following planning approval PL/2025/02352/PPFL -Rebuilding of dilapidated barn and conversion into additional restaurant space. Installation of new doors and windows to existing opening and formation of new openings to connect the barn with the existing garden area. New patio to be formed. APPROVED 30-3-26

    5 May 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of condition 7 - Parts 1 and 2 (Phase 1B - Contaminated Land), 50 (Phase 2 - Demolition Phase Plan), 51 (Photographic Record - Phase 2), 54 - Parts 1 and 2 (Phase 2 and Phase 1C - Contaminated Land) and Biodiversity Net Gain Plan - Phase 1 of PL/2025/00547/MAJFDW.

    22 Apr 2026 Conditions
  • Street Record Mell Square Solihull

    Discharge of Condition Nos 3 (Demolition Phasing Plan - Phase 1), 4 (Record of Analysis of Buildings - Demolition - Phase 1), 5 Demolition Management Plan - Phase 1), 6 (Demolition and Construction Ecological Management Plan- Phase 1), 7 (Contaminated Land - Phase 1A), 8 (Tree Protection - Phase 1), 51 (Record of Buildings - Drury Lane Retail Units), 52 (Demolition Plan- Drury Lane Retail Units) and 53 (Demolition and Construction Ecological Plan - Phase 1C) following planning approval PL/2025/00547/MAJFDW.

    2 Apr 2026 Conditions