Planning application

Palmers Farm Industrial Estate Valley Road Earlswood Solihull

Granted Solihull PL/2023/00577/PPFL Minor Full Other

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of Units 1 and 2 and erection of a replacement employment building.

As published by the council, reference PL/2023/00577/PPFL

Application record

Reference
PL/2023/00577/PPFL
Type
Minor Full Other
Status
Decided
Decision
Approved
Received
14 Mar 2023
Validated
17 Apr 2023
Decided
29 Jun 2023
Ward
Blythe
Parish
Tidbury Green Parish Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 14 Mar 2023

    Received by Solihull

  2. 17 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2023

    Decision issued: Approved

  4. 31 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Stratford-Upon-Avon

202 applications on PlanIndex · across 12 councils · 76% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Brook View Palmers Farm Valley Road Earlswood Solihull B94 6AB

    PL/2023/02314/CLOPUD Submitted 6 Nov 2023 31m away

    Certificate of lawful development for proposed extension to an industrial building.

    Refused Lawful development Extension 7 docs
  • Palmers Farm Industrial Estate 1 Valley Road Earlswood Solihull B94 6AB

    PL/2022/02561/CLOPUD Submitted 6 Dec 2022 56m away

    Certificate of lawful development for proposed extension to industrial building.

    Granted Lawful development Extension 8 docs
  • Palmers Farm Industrial Estate 1 Valley Road Earlswood Solihull B94 6AB

    PL/2022/02562/CLOPUD Submitted 6 Dec 2022 67m away

    Certificate of lawful development for proposed extension to an industrial building.

    Granted Lawful development Extension 8 docs
  • Bowyer Farm Lady Lane Earlswood Solihull B94 6AQ

    PL/2024/00162/PPFL Submitted 29 Jan 2024 213m away

    Demolition of existing structures on site, and construction of one 3 No. bedroom dwelling and associated car port and landscape improvements, with a reduction in volume of development on site, to replace existing approval for a 3 No. bedroom dwelling under PL/2021/03058/PNCUDW.

    Refused Full applications Demolition 8 docs
    Domestic
  • Bowyer Farm Lady Lane Earlswood Solihull B94 6AQ

    PL/2023/02413/PPFL Submitted 21 Nov 2023 268m away

    Retrospective planning application for a circa 19 x 9m footprint, 4.6m high barn that was reconstructed by the former site owner following a fire. The reason for the application is that the new recent owner wants certification for the barn as built, as it has been built by the former owner (Presumably in 2016) to smaller dimensions than was approved under application PL/2015/52614/MINFOT in 2015 (20 x 10m footprint with a maximum height of 6m).

    Granted Full applications 5 docs
  • 66 Shutt Lane Earlswood Solihull B94 6DB

    PL/2022/02520/MINFOT Submitted 29 Nov 2022 289m away

    Erect tools and stables shed.

    Granted Full applications 8 docs
    Small domestic

In Solihull

  • Land Off The Grove Hampton In Arden Solihull

    Demolition of redundant kennels and erection of a dwelling.

    27 Jan 2025 Full applications
  • 34 Creynolds Lane Cheswick Green Solihull B90 4ER

    Addition of a first floor to the existing bungalow to form a two storey dwelling, as well as proposed front and rear extensions.

    5 May 2026 Full applications
  • Olton Reservoir Warwick Road Olton Solihull

    Erect fence and entrance gates.

    20 Feb 2026 Full applications
  • 78 Prospect Lane Solihull B91 1HS

    Erect new two storey dwelling.

    18 Aug 2025 Full applications
  • The Barn Knowle Road Eastcote Solihull

    Retrospective application for the retention of the as built dwelling.

    24 Feb 2025 Full applications