Skip to content
PlanIndex Get alerts
Menu

Planning application

P/20140/002

2, Mascall Path, Slough, Slough, SL2 2HR

Awaiting decision Slough Full Planning

Proposal

Construction of a proposed 1no. two bed dwelling adjacent to 2 Mascoll Path along with bin, cycle storage and car parking.

As published by the council, reference P/20140/002

Timeline

Dates from the published record

  1. 12 Feb 2026

    Received by Slough

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Slough for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P/20140/000 Withdrawn

    2, Mascall Path, Slough, SL2 2HR

    Construction of 2no 1no bedroom dwelling houses adjacent to 2 Mascall Path

    6 Feb 2023 20m away Full applications
  • P/20689/002 Granted

    21, Hetherington Close, Slough, SL2 2HU

    Construction of a two storey side extension

    1 Dec 2025 72m away Full applications
  • P/20689/001 Granted

    21, Hetherington Close, Slough, SL2 2HU

    Construction of a single storey side extension to existing dwelling.

    1 Aug 2025 72m away Full applications
  • P/21113/000 Awaiting decision

    53, Perryman Way, Slough, SL2 2HF

    Retrospective application for a single storey wraparound rear extension and conversion of garage to a habitable space.

    27 Jul 2026 128m away Full applications
  • Y/21107/000 Awaiting decision

    184, Rokesby Road, Slough, SL2 2EG

    The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6.0m, with a maximum height of 3.0m, and an eaves height of 2.7m

    10 Jul 2026 190m away Prior approval
  • P/19740/003 Awaiting decision

    70, Goodwin Road, Slough, SL2 2EU

    Construction of a proposed end terrace 1no. three bedroom dwelling with on site car parking.

    4 Jun 2026 246m away Full applications

In Slough

  • P/00445/007 Awaiting decision

    1, Bouverie Way, Slough, SL3 7JZ

    Conversion of loft into habitable space with rear dormer

    29 Jul 2026 Full applications
  • P/15350/001 Awaiting decision

    50, Royston Way, Slough, SL1 6HA

    Construction of a single storey rear conservatory with flat roof with 2no roof lights.

    28 Jul 2026 Full applications
  • P/03120/004 Refused

    72, Belfast Avenue, Slough, SL1 3HL

    Construction of a proposed part first floor side and rear extension together with the sub-division of the plot to create a 1no. two-bedroom attached dwelling.

    1 Jun 2026 Full applications
  • P/17530/002 Granted

    21, Howard Avenue, Slough, SL2 1LD

    Construction of a single storey rear outbuilding

    12 May 2026 Full applications
  • P/12983/001 Awaiting decision

    245, Bath Road, Slough, SL1 5PP

    Construction of a proposed single storey rear extension to existing dwelling following demolition of existing covered canopy.

    27 Jul 2026 Full applications