Planning application
Land between Iver Substation (South Bucks) and Manor Farm, Poyle Road
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of a proposed Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works.
As published by the council, reference P/11442/012
Application record
- Reference
- P/11442/012
- Type
- Full Planning
- Status
- Registered application
- Received
- 4 Feb 2026
- Validated
- 4 Feb 2026
- Ward
- Colnbrook-and-Poyle
- Parish
- Colnbrook-with-Poyle
- Decision by
- Delegated
- Postcode
- SL3 0BL
Timeline
Dates from the published record
-
4 Feb 2026
Received by Slough
-
25 Jul 2026
Added to PlanIndex
-
10 Sep 2026
Status changed to Registered application
-
Decision
Awaiting decision
Decision expected by 1 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Slough took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Slough for determination, against a statutory target of eight weeks. Over the last year Slough decided full applications in a median of 61 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land between Laleham Substation (Spelthorne) and Manor Farm, Poyle Road Poyle
78% historically approved · decision due ~1 Apr
Construction of a proposed Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works.
Awaiting decision Full applications -
Land West Of The Iver South Sludge Dewatering Centre South M4 Slough
Neighbouring Authority Consultation for the proposed development of a replacement Energy from Waste (EfW) facility including a High Temperature incinerator (HTI) provision of a new access road and new junction with the A4, visitor centre, car parking, temporary construction compound, associated works, ancillary buildings and structures
Granted 4 docs -
Land At Manor Farm Poyle Road Poyle Slough
78% historically approved · decision due ~16 Nov
Construction of a proposed demolition of existing buildings and structures, and erection of three Data Centres (Use Class B8) with ancillary substation, offices, associated plant, emergency backup generators and associated fuel storage, landscaping, sustainable drainage systems, car and cycle parking, and new and amended vehicular and emergency access from Poyle Road, site re-levelling, community building, river diversion and other associated works.
Awaiting decision Demolition 3 docs -
Land At Manor Farm Poyle Road Poyle Slough
70% historically approved · decision due ~12 Nov
Demolition of existing buildings and structures, and erection of three Data Centres (Use Class B8) with ancillary substation, offices, associated plant, emergency backup generators and associated fuel storage, landscaping, sustainable drainage systems, car and cycle parking, and new and amended vehicular and emergency access from Poyle Road, site re-levelling, community building, river diversion and other associated works.
Awaiting decision Full applications Demolition 230 docs -
Manor Farm Poyle Road Poyle Slough
Environmental Impact Assessment (EIA) Screening Opinion request for redevlopment of site to a Data Centre and Battery Energy Storage System.
Granted 3 docs -
Manor Farm Poyle Road Poyle Slough Berks SL3 0BL
66% historically approved · decision due ~7 Apr
Consultation from Slough Borough Council on planning application P/11442/012 - Construction of a proposed Installation of underground and ground mounted structures to support electrical connection and communication cables with temporary construction compounds, and associated infrastructure and works
Awaiting decision Outline 1 doc
Other full applications
In Slough
-
P/21185/000 Awaiting decision
4, Hunstanton Close, Colnbrook, Slough, SL3 0RL
Conversion of garage into habitable room
-
P/16962/002 Awaiting decision
1, Odencroft Road, Slough, SL2 2BS
Construction of a part single storey, part two storey side and rear extension to existing dwelling.
-
P/20300/007 Awaiting decision
28, Gilliat Road, Slough, SL1 3QX
Installation of air conditioning unit to the external rear wall.
-
P/21181/000 Awaiting decision
96, Grasmere Avenue, Slough, SL2 5JF
Construction of a single storey front & rear and two storey side extension
-
P/08479/003 Awaiting decision
11, Ives Road, Slough, Slough, SL3 8PB
Retrospective application for the retention of a single storey rear extension built to an increase height.