Archive · Shetland Islands · 2026
Planning applications in Shetland Islands, June 2026
Shetland Islands recorded 41 planning applications in June 2026, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, June 2026
Newest first
-
2024/203/DCON1 Granted
Spiggie House Dunrossness Shetland ZE2 9JE
Application for consent, agreement or approval required by planning Condition 5 (SuDs Details) of planning application 2024/203/PPF
-
2026/142/SCR Decided
Luggies Knowe To Gremista Lerwick
Environmental Impact Assessment screening opinion in respect to a proposed underground electrical cable connection to facilitate the export of electricity from the consented Luggie's Knowe Phase 2 Wind Farm development
-
2026/139/LBC Decided
Bruce Hostel Twageos Road Lerwick Shetland ZE1 0BA
Alterations to former hostel building including removal of chimneys, reinstatement of window opening on NW elevation, removal and replacement of harling, reconfiguration of internal layout to form 8no. flats, construction of roof over central courtyard, construction of new accessible entrance door, lift and fire/access stair, alterations to existing stairs, replacement doors and windows, demolition of block-built fire-stair extension & outbuilding stores / garage. Alteration and extension of former groundskeepers cottage to form one residential unit.
-
2024/303/DCON13 Granted
600M West Of The Western Extent Of Lerwick BNG HU 44730 42646
Application for consent, agreement or approval required by planning Condition: 15 (Visibility splays and site levels) of planning application 2024/303/PPF.
-
2026/138/PPF Decided
Bruce Hostel Twageos Road Lerwick Shetland ZE1 0BA
Proposed change of use, restoration and conversion of former hostel building and groundskeepers cottage to form 8 no flats plus 1 no. 1 bedroom residential unit. Demolition of block-built fire-stair extension & outbuilding stores / garage, reconfiguration of parking & landscaping.
-
2025/134/DCON1 Granted
The Haa Tirvister Ollaberry Shetland ZE2 9RU
Application for consent, agreement or approval required by planning Condition 3 (Structural repairs) of planning application 2025/134/LBC
-
2025/133/DCON1 Granted
The Haa Tirvister Ollaberry Shetland ZE2 9RU
Application for consent, agreement or approval required by planning Condition 8 (Structural supports) of planning application 2025/133/PPF
-
2026/137/PN Awaiting decision
Sandgarth Dale Voe Shetland ZE2 9PT
Prior Notification for Farm-related Building Works (Non-residential).
-
2026/136/PPF Decided
6 Vatna Gaet South Nesting Shetland ZE2 9PP
Single storey extension to north elevation of existing house to accommodate new kitchen, lounge and shower room
-
2023/204/DCON5 Awaiting decision
Gutcher Quarry Sellafirth Yell Shetland
Application for consent, agreement or approval required by planning condition 3 (Decommissioning, restoration and aftercare) of planning application 2023/204/MIN
-
2026/134/PN Awaiting decision
Cloudin Farmhouse Isle Of Vaila Walls ZE2 9PA
Prior Notification to erect an agricultural building 18M x 12M
-
2023/204/DCON3 Awaiting decision
Gutcher Quarry Sellafirth Yell Shetland
Application for consent, agreement or approval required by planning condition 7 (Noise & Vibration Management) of planning application 2023/204/MIN
-
2023/204/DCON2 Granted
Gutcher Quarry Sellafirth Yell Shetland
Application for consent, agreement or approval required by planning condition 6 (Control & Mitigation Dust) of planning application 2023/204/MIN
-
2023/084/DCON15 Granted
Mossy Hill Wind Farm. The Site Centre Is Approximately 2.4km From The Outskirts Of Lerwick And 4.2km From Lerwick Harbour.
Application for consent, agreement or approval required by planning Condition: 9 (Aviation Safety) of planning application 2023/084/VCON
-
2024/130/NMV1 Awaiting decision
Former North Compound (Viking Energy Wind Farm) Off A970
Non-Material Variation to vary planning permission 2024/130/PPF to Change from 21No. parking bays as shown on originally approved car park layout plan to 20No. parking bays to allow for 3No. disabled bays to be slightly wider
-
2026/132/PPF Awaiting decision
72 Nederdale Lerwick Shetland ZE1 0SB
Erection of single storey rear extension
-
2026/133/PPF Awaiting decision
Seacrest Vidlin Shetland ZE2 9QB
Erection of a single storey extension to north side to connect the dwellinghouse to the garage
-
2023/275/DCON6 Granted
North Hoo Fields Gremista Lerwick
Application for consent, agreement or approval required by planning Condition: 8 (Bird Breeding) of planning application 2023/275/PPF.
-
2026/130/PN Awaiting decision
Kveldsro House Hotel Greenfield Place Lerwick Shetland ZE1 0AQ
Replacement of 40 no. windows like for like with double glazed timber sash coloured white for original building and double glazed white uPVC windows. 26 no. window frames to be changed from red to white to match other frames
-
2026/129/CCCON Awaiting decision
Scarpigarth & Kjodas Voxter Shetland ZE2 9HF
Divide existing croft into 2 no. crofts
-
2023/084/DCON14 Granted
Mossy Hill Wind Farm. The Site Centre Is Approximately 2.4km From The Outskirts Of Lerwick And 4.2km From Lerwick Harbour.
Application for consent, agreement or approval required by planning Condition: 19 (Drainage) of planning application 2023/084/VCON.
-
2023/084/DCON13 Granted
Mossy Hill Wind Farm. The Site Centre Is Approximately 2.4km From The Outskirts Of Lerwick And 4.2km From Lerwick Harbour.
Application for consent, agreement or approval required by planning Condition: 32 (Aggregate Sources) of planning application 2023/084/VCON.
-
2026/127/PPF Granted
Windways Veensgarth Hill Tingwall Shetland ZE2 9SB
To construct single storey extension to south elevation of existing dwelling house to provide new kitchen
-
2026/128/PPP Awaiting decision
Outvoe Dunrossness Shetland ZE2 9JQ
New dwelling house and associated infrastructure.
-
2023/084/DCON12 Granted
Mossy Hill Wind Farm. The Site Centre Is Approximately 2.4km From The Outskirts Of Lerwick And 4.2km From Lerwick Harbour.
Application for consent, agreement or approval required by planning Condition: 31 (Road repair and maintenance agreement) of planning application 2023/084/VCON.
-
2024/303/DCON12 Withdrawn
600M West Of The Western Extent Of Lerwick BNG HU 44730 42646
Application for consent, agreement or approval required by planning Condition: 18 (Road repair and maintenance agreement) of planning application 2024/303/PPF.
-
2026/125/PPF Decided
Barochamber Building Private Road Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Install new air source heat pump
-
2026/124/PPF Awaiting decision
Burns Walk Lerwick Shetland
To site mobile unit to trade from
-
2026/123/PN Awaiting decision
Sunshine Cottage Wester Quarff Quarff Shetland ZE2 9EZ
Prior Notification for Farm-related Building Works (Non-residential).
-
2026/122/LBC Decided
81 Commercial Street Lerwick Shetland ZE1 0AD
Proposed replacement of the existing ATM located on the east facade of Queens Lane with a new ATM within the existing aperture
-
2024/303/DCON11 Granted
600M West Of The Western Extent Of Lerwick BNG HU 44730 42646
Application for consent, agreement or approval required by planning Condition: 16 (Access Roads) of planning application 2024/303/PPF.
-
2024/303/DCON10 Granted
600M West Of The Western Extent Of Lerwick BNG HU 44730 42646
Application for consent, agreement or approval required by planning Condition: 20 (Use of Materials) of planning application 2024/303/PPF.
-
2026/118/PPF Awaiting decision
Land to the north of Sandy Loch Water Treatment Works, Sound, Lerwick
Installation of Clear Water Storage Tank
-
2026/121/ECUCON Decided
From Proposed South Yell Substation To Energy Isles Connection At North Yell, Shetland
Pre-Application Consultation Notice, SSEN Transmission - PAC 2 Alignment Options- Energy Isles 132kV OHL, Yell. Shetland ECU00005033
-
2026/119/LBC Decided
1 Veensgarth Gott Tingwall Shetland ZE2 9SB
Replace all existing double glazed sash and case windows with Nordan triple glazed lookalike sash and case windows
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility
-
2026/120/ECUCON Decided
Between North Of Kergord Converter Station Running Generally Parallel To The A970 Before Passing Voe And Running Alongside The A968 Towards The Toft / Scatsta Area
Pre Application Consultation Notification (PAC 2 Alignment Options)- SSEN Transmission LT622- Northern Shetland 220kV to Kergord 132kVV
-
2026/117/NMV Awaiting decision
Leog House 2 Leog Lane Lerwick ZE1 0AH
Non-Material Variation to vary planning permission 2020/111/PPF - Remove rooflights, add window to east elevation and rainwater pipe to south elevation, reduce height of, and remove grass roof from extension and change external boarding.
-
2026/113/PPF Withdrawn
3 Swarthoull Lerwick Shetland ZE1 0SN
To construct new domestic detached garage building
-
2026/114/PAN Decided
Land To The North Of Burravoe, To The East And West Of The B9081, The West Of Loch Neapaback And The East Of Loch Of Kettlester South Yell Shetland
Construction and operation of a 220/132kV Substation, associated earthworks, formation of platforms, landscaping, drainage, access and other associated works
-
2026/115/PAN Decided
Land South Of Voe And West Of The A970 And East Of The Burn Of Voxter In The Vicinity Of Hamarigrind Mainland Shetland
The construction and operation of a 220/132 kV Substation, associated earthworks, formation of platforms, drainage, access and other associated works
Other months in 2026
- January 2026 27
- February 2026 36
- March 2026 48
- April 2026 16
- May 2026 42
- June 2026 41
- July 2026 34
- August 2026 29
- September 2026 23
- October 2026 14