Planning application
2026/125/PPF
Barochamber Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Proposal
Install new air source heat pump
As published by the council, reference 2026/125/PPF
Timeline
Dates from the published record
-
8 Jun 2026
Received by Shetland Islands
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Shetland Islands for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/148/PPF Awaiting decision
Plot Adjacent Port Business Park Lerwick Shetland
Erection of a shunt reactor, 2.4-metre-high fence with vehicular access gates; erect 2 no. CCTV columns and 1 no. lighting column; install 1 no. oil interceptor and sump.
-
2025/285/S37SIM Granted
Gremista Lerwick
Temporary Two Span of 33kV overhead line supported by wooden poles between HU4602442713 and HU4602442725 connected by underground cable.
Other full applications applications
In Shetland Islands
-
2026/059/PPF Granted
Plot Clack Catfirth South Nesting Shetland
Erection of no. 2 dwellinghouses, formation of vehicular access, erection of 1m post and wire boundary fence, installation of septic tank and infiltration system, installation of air source heat pump and associated landscaping and drainage works.
-
2024/220/DCON Awaiting decision
Stove Kirk Inchrye Stove Sandwick Shetland ZE2 9FX
Application for consent, agreement or approval required by planning Condition: 04 (SW Agreement) of planning application 2024/220/PPF.
-
2026/154/PPF Awaiting decision
Lerwick Hotel 15 South Road Lerwick Shetland ZE1 0RB
To demolish existing two storey hotel bedroom wing and build new 3 storey bedroom wing in its place with SUDs and landscaping
-
2026/151/PPF Status unknown
Brough Lodge Fetlar Shetland
Change use of Brough Lodge and outbuildings from domestic to hotel, upgrade access track and parking area. Restore and upgrade fabric, install services including new septic tank.
-
2026/150/PPF Awaiting decision
Da Fustra Westing Unst Shetland ZE2 9DW
Erection of a single storey read extension, decking and soakaway.