Skip to content
PlanIndex Get alerts
Menu

Planning application

Cogton Binnaness Whiteness Shetland ZE29LL

Awaiting decision Shetland Islands 2025/123/PPF Planning Permission Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

To construct hill track & tracking of services to serve Shepherd's accommodation (Part Retrospective).

As published by the council, reference 2025/123/PPF

Application record

Reference
2025/123/PPF
Type
Planning Permission Full
Status
Pending Consideration
Received
9 May 2025
Validated
11 Jun 2025
Parish
TINGWALL, WHITENESS & WEISDALE
Postcode
ZE2 9LL

Timeline

Dates from the published record

  1. 9 May 2025

    Received by Shetland Islands

  2. 11 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 5 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Shetland Islands took a median of 60 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

20 applications on PlanIndex · 85% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

  • E-MAIL TO AGENT RE OUTSTANDING INFO Correspondence · 16 Dec 2025
  • FURTHER INFORMATION REQUEST Correspondence · 05 Nov 2025
  • DRAIN/FLOOD - RECONSULTATION Consultee Comment · 29 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 1 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 2 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 3 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 4 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 5 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 6 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 7 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 8 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK PLAN SHEET 9 OF 9 Drawing · 08 Oct 2025
  • QUAD BIKE TRACK LONGITUDINAL SECTION SHEET 1 OF 3 - REV A Drawing · 08 Oct 2025
  • QUAD BIKE TRACK LONGITUDINAL SECTION SHEET 2 OF 3 - REV A Drawing · 08 Oct 2025
  • QUAD BIKE TRACK LONGITUDINAL SECTION SHEET 3 OF 3 - REV A Drawing · 08 Oct 2025
  • QUAD BIKE TRACK DRAINAGE CHANNEL CONSTRUCTION DETAILS - REV A Drawing · 08 Oct 2025
  • APPLICATION FORM - REVISED INFORMATION Application Form · 08 Oct 2025
  • CONSULTATION RESPONSE - NHO Consultee Comment · 06 Oct 2025
  • PROPOSED SITE PLAN Drawing · 27 Aug 2025
  • EMAIL RESPONSE TO COMMENTS Correspondence · 27 Aug 2025
  • NATURE SCOT COMMENTS Consultee Comment · 04 Aug 2025
  • OUTDOOR ACCESS - COMMENTS Consultee Comment · 23 Jul 2025
  • CONSULTATION RESPONSE - SHETLAND AMENITY TRUST Consultee Comment · 30 Jun 2025
  • CONSULTATION RESPONSE - ROADS Consultee Comment · 03 Jun 2025
  • SHETLAND TIMES ADVERT Advert · 30 May 2025
  • CONSULTATION RESPONSE - DRAINAGE Consultee Comment · 28 May 2025
  • CONSULTATION RESPONSE - ARCHAEOLOGY Consultee Comment · 28 May 2025
  • DESIGN AND ACCESS STATEMENT Supporting Documents · 23 May 2025
  • PLANNING STATEMENT Supporting Documents · 23 May 2025
  • EXISTING SITE PLAN Drawing · 09 May 2025
  • PROPOSED SITE PLAN AND SECTIONS Superseded Drawing · 09 May 2025
  • ARCHAEOLOGY DBA AND WALKOVER SURVEY Supporting Documents · 09 May 2025
  • LOCATION PLAN Drawing · 09 May 2025
  • APPLICATION FORM Application Form · 09 May 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Shetland Islands for determination, against a statutory target of eight weeks. Over the last year Shetland Islands decided full applications in a median of 75 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications