Planning application
Garth Skellister South Nesting Shetland ZE2 9PS
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of derelict crofthouse, siting of 1no. glamping pod for short-term let use, erection of bike store, formation of raised decking, access improvements, parking and turning space, site drainage and landscaping.
As published by the council, reference 2025/093/PPF
Application record
- Reference
- 2025/093/PPF
- Type
- Planning Permission Full
- Status
- Pending Consideration
- Received
- 14 Apr 2025
- Validated
- 17 Apr 2025
- Ward
- Nesting & Lunnasting
- Parish
- NESTING & LUNNASTING
- Postcode
- ZE2 9PS
Timeline
Dates from the published record
-
14 Apr 2025
Received by Shetland Islands
-
17 Apr 2025
Validated
Checked as complete and ready for consideration.
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Shetland Islands took a median of 60 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Glasgow
43 applications on PlanIndex · across 27 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
- CONSULTATION RESPONSE - DRAINAGE
- ROADS - COMMENTS RECONSULTATION
- PROPOSED SITE PLAN
- DRAINAGE PLAN
- PROPSOED LIGHTING PLAN
- ROAD SECTION
- PROPOSED SUDS DETAILS
- VISIBILITY SPLAY
- CONSULTATION RESPONSE - SCOTTISH WATER
- CONSULTATION RESPONSE - COMMUNITY COUNCIL
- SHETLAND TIMES ADVERT
- CONSULTATION RESPONSE - ROADS
- CONSULTATION RESPONSE - ARCHAEOLOGY
- CONSULTATION RESPONSE - DRAINAGE
- CONSULTATION RESPONSE - ENVIRONMENTAL HEALTH
- EXISTING LAYOUT PLAN
- ELEVATIONS - ADDITIONAL
- POD FLOOR PLAN AND ELEVATIONS - A2
- DESIGN AND ACCESS STATEMENT
- MARKET RESEARCH
- PROPOSED LAYOUT PLAN - A1
- DRAINAGE PLAN - A1
- ROAD AND ACCESS PLAN - A1
- PROPOSED LIGHTING PLAN - A1
- ARTIST IMPRESSIONS - A1
- A LOCATION PLAN
- APPLICATION PDF
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Shetland Islands for determination, against a statutory target of eight weeks. Over the last year Shetland Islands decided full applications in a median of 75 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.