Skip to content
PlanIndex Get alerts
Menu

Planning application

155 Bannerdale Road Sheffield S7 2DS

Awaiting decision Sheffield 26/02543/FUL Full applications

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of two-storey side/rear extension, single-storey rear extension, hip to gable extension, rear dormer window and rear second-floor Juliette balcony to dwellinghouse (Application under Section 73 to vary condition 2 (Approved Plans) imposed by planning permission 26/00263/FUL)

As published by the council, reference 26/02543/FUL

Application record

Reference
26/02543/FUL
Category
Full applications
Status
Awaiting decision
Received
25 Aug 2026
Validated
Date not published
Postcode
S7 2DS

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Sheffield

  2. 7 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 135 Bannerdale Road Sheffield S7 2DS

    14/02550/FUL Submitted 14 Jul 2014 0m away

    Two-storey side extension and alterations/extension to roof to create additional living space including roof lights and rear doors/balustrade

    Granted Full applications Extension Loft or dormer 23 docs
  • 50 Struan Road Sheffield S7 2EJ

    26/00734/FUL Submitted 16 Mar 2026 89m away

    Erection of a single-storey rear/side extension and single-storey front extension with access steps, removal of pebbledash at first floor level and replacement with render, and widening of vehiclular access to dwellinghouse

    Granted Full applications Extension 13 docs
    Small domestic
  • 27 Knab Rise Sheffield S7 2ES

    19/03621/FUL Submitted 2 Oct 2019 150m away

    Demolition of existing conservatory and erection of a single-storey side extension and front porch

    Granted Full applications Extension Demolition 10 docs
    Small domestic
  • 8 Knab Croft Sheffield S7 2EQ

    26/01731/FUL Submitted 9 Jun 2026 166m away

    92% historically approved · decision due ~10 Aug

    Erection of two-storey side extension to dwellinghouse

    Awaiting decision Full applications Extension
    Domestic
  • 10 Knab Croft Sheffield S7 2EQ

    26/01553/FUL Submitted 26 May 2026 166m away

    92% historically approved · decision due ~21 Jul

    Erection of a single storey rear extension, a canopy to walkway to side elevation and widening of entrance to increase driveway

    Awaiting decision Full applications Extension
    Small domestic
  • 200 Brincliffe Edge Road Sheffield S11 9BY

    16/03966/TCA Submitted 17 Oct 2016 178m away

    Removal of trees (Nether Edge Conservation Area)

    Granted Trees 4 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications