Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Donnington Road Sheffield S2 2RF

Awaiting decision Sheffield 26/02467/FUL Full applications

Works: Extension Loft or dormer Roofing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to roof including raised ridge height, formation of gable ends, dormer extension to rear and rooflights to front, erection of two-storey side extension and single-storey rear extension to dwellinghouse

As published by the council, reference 26/02467/FUL

Application record

Reference
26/02467/FUL
Category
Full applications
Status
Awaiting decision
Received
17 Aug 2026
Validated
31 Aug 2026
Postcode
S2 2RF

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by Sheffield

  2. 31 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 65 Donnington Road Sheffield S2 2RF

    14/01782/FUL Submitted 16 May 2014 0m away

    First floor side extension over covered way

    Granted Full applications Extension 9 docs
  • 297 Granville Road Sheffield S2 2RP

    21/03724/FUL Submitted 18 Aug 2021 219m away

    Construction of vehicular access to dwellinghouse including formation of dropped kerb

    Granted Full applications 6 docs
    Small domestic
  • 52 Tylney Road Sheffield S2 2RY

    22/03338/HPN Submitted 11 Sep 2022 287m away

    Single-storey rear extension - the extension will be 3.5 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and height to the eaves of 2.6 metres

    Granted Prior approval Extension Roofing 5 docs
    Small domestic
  • 307 City Road Sheffield S2 5HJ

    13/03562/TPO Submitted 20 Oct 2013 292m away

    Removal of Sycamore Tree T4, Tree Preservation Order No.808/287

    Granted Trees 10 docs
  • Former Manor Lodge Primary School Kitchen And Dining Hall Manor Lane Sheffield S2 5HJ

    13/03846/COND1 Submitted 3 Nov 2014 292m away

    Application to approve details in relation to condition numbers 3. Schedule of works and 4. Schedule of fixtures and fittings of planning permission 13/03846/LBC

    Decided Conditions 16 docs
  • 307 City Road Sheffield S2 5HJ

    08/04281/TPO Submitted 12 Aug 2008 292m away

    Pruning of tree (808/287)

    Granted Trees 5 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications