Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Arncliffe Drive Sheffield S35 2BS

Awaiting decision Sheffield 26/02449/FUL Full applications

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of first-floor side extension to dwellinghouse

As published by the council, reference 26/02449/FUL

Application record

Reference
26/02449/FUL
Category
Full applications
Status
Awaiting decision
Received
13 Aug 2026
Validated
13 Aug 2026
Postcode
S35 2BS

Timeline

Dates from the published record

  1. 13 Aug 2026

    Received by Sheffield

  2. 20 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 7 Marrick Court Sheffield S35 2BT

    25/03171/FUL Submitted 23 Oct 2025 56m away

    Erection of single-storey rear extension

    Granted Full applications Extension 5 docs
    Small domestic
  • 54 Housley Lane Sheffield S35 2UD

    26/01061/FUL Submitted 14 Apr 2026 74m away

    Extension to an existing raised external patio area

    Granted Full applications Extension 8 docs
  • Silver Lodge Residential Care Home 12 Housley Lane Sheffield S35 2UD

    21/01928/FUL Submitted 26 Apr 2021 158m away

    Demolition of conservatory, porch and external structures, internal and external alterations including erection of new entrance porch to allow use of care home (Use Class C2) as 10 apartments (Use Class C3), provision of car parking and associated works (amended description).

    Granted Full applications New dwelling Extension +1 36 docs
    Major scheme
  • 35 Yoredale Avenue Sheffield S35 2ZW

    26/01783/HPN Submitted 15 Jun 2026 167m away

    92% historically approved · decision due ~10 Aug

    Single-storey rear extension - the extension will be 4.5 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and height to the eaves of 3 metres

    Decided Extension Roofing
    Small domestic
  • 7 Housley Lane Sheffield S35 2UD

    23/03190/FUL Submitted 6 Oct 2023 179m away

    Demolition of detached garage and erection of a two-storey side extension, erection of a single-storey rear extension and alterations to roof and materials of dwellinghouse (AMENDED DESCRIPTION 22.02.2024)

    Granted Full applications Extension Demolition 11 docs
    Small domestic
  • 60 Housley Park Chapeltown Sheffield S35 2UE

    02/02841/TPC Submitted 22 Aug 2002 192m away

    Removal of a tree (Planning Condition)

    Granted Trees

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications