Skip to content
PlanIndex Get alerts
Menu

Planning application

106 Myers Grove Lane Sheffield S6 5JH

Awaiting decision Sheffield 26/02412/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of outbuilding for home office use in rear garden of dwellinghouse

As published by the council, reference 26/02412/FUL

Application record

Reference
26/02412/FUL
Category
Full applications
Status
Awaiting decision
Received
10 Aug 2026
Validated
28 Aug 2026
Ward
Stannington
Postcode
S6 5JH

Timeline

Dates from the published record

  1. 10 Aug 2026

    Received by Sheffield

  2. 28 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 100 Myers Grove Lane Sheffield S6 5JH

    14/03602/FUL Submitted 27 Sep 2014 0m away

    Application to separate cattery business from domestic accommodation (Application to remove condition 6 of planning permission no. 10/02243/FUL)

    Refused Full applications 6 docs
  • Land Adjacent To 100 Myers Grove Lane Sheffield S6 5JH

    14/02001/FUL Submitted 4 Jun 2014 0m away

    Erection of dwellinghouse to be used in conjunction with the existing cattery business

    Refused Full applications 13 docs
    Domestic
  • Site Of Pinegrove Country Club Myers Grove Lane Sheffield S6 5JH

    14/01910/COND Submitted 14 May 2014 0m away

    Application to approve details in relation to conditions 7. landscaping scheme; 14. remediation strategy report and 15. development in accordance with remediation strategy relating to planning permission 12/00685/FUL

    Decided Conditions 19 docs
  • Loxley Bank 120 Myers Grove Lane Sheffield S6 5JH

    17/02222/COND1 Submitted 11 Oct 2019 175m away

    Application to approve details in relation to condition number(s): 3 (Method Statement for the removal or control of Japanese Knotweed and Himalayan Basam) and 4 (Construction access route - tree protection) imposed by planning permission 17/02222/FUL

    Decided Conditions Trees 8 docs
  • Woodside House 355 Loxley Road Sheffield S6 4TH

    21/03441/FUL Submitted 29 Jul 2021 215m away

    Demolition of outbuilding, erection of single-storey rear extension and link extension to outbuildings at rear of garden to be used as ancillary accommodation to the main dwelling and associated works to dwellinghouse

    Granted Full applications Extension Demolition 12 docs
    Small domestic
  • 294 Loxley Road Sheffield S6 4TH

    26/01403/FUL Submitted 13 May 2026 258m away

    Demolition of conservatory and erection of a single-storey front extension to dwellinghouse

    Granted Full applications Extension Demolition 12 docs
    Small domestic

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications