Skip to content
PlanIndex Get alerts
Menu

Planning application

Sipelia Works Cadman Street Attercliffe Sheffield S4 7ZG

Awaiting decision Sheffield 26/02407/FUL Full applications

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of part of Sipelia Works to provide 2 hostel units (Sui Generis) and 4 additional en-suite hostel units (Sui Generis), with associated communal facilities, installation of solar panels, replacement windows, ventilation grilles, formation of new openings, erection of an external staircase, and associated works

As published by the council, reference 26/02407/FUL

Application record

Reference
26/02407/FUL
Category
Full applications
Status
Awaiting decision
Received
10 Aug 2026
Validated
10 Aug 2026
Postcode
S4 7ZG

Timeline

Dates from the published record

  1. 10 Aug 2026

    Received by Sheffield

  2. 18 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Sipelia Works Cadman Street Attercliffe Sheffield S4 7ZG

    26/02408/LBC Submitted 10 Aug 2026 0m away

    92% historically approved · decision due ~5 Oct

    Conversion of part of Sipelia Works to provide 2 hostel units (Sui Generis) and 4 additional en-suite hostel units (Sui Generis), with associated communal facilities, installation of solar panels, replacement windows, ventilation grilles, formation of new openings, erection of an external staircase, and associated works

    Awaiting decision Heritage and listed buildings Windows or glazing
  • Emmaus Sheffield Ltd Unit 2 Sipelia Works Cadman Street Attercliffe Sheffield S4 7ZG

    14/03093/LBC Submitted 7 Aug 2014 0m away

    Application under Section 73 to remove condition No. 3. UPVC rainwater goods; as imposed by planning permission 14/01829/LBC - Alterations to East Wing of building for residential (institutional) use

    Granted Heritage and listed buildings 6 docs
  • Sipelia Works Cadman Street Attercliffe Sheffield S4 7ZG

    14/01828/FUL Submitted 22 May 2014 0m away

    Alterations to East Wing of building for residential (institutional) use

    Granted Full applications 22 docs
  • The Mega Centre Bernard Road Sheffield S2 5BQ

    21/02709/ADV Submitted 11 Jun 2021 235m away

    Re-signage of building and provision of a totem sign to overflow carpark

    Withdrawn Advertising 16 docs
  • The Mega Centre Bernard Road Sheffield S2 5BQ

    21/02545/FUL Submitted 1 Jun 2021 235m away

    Replacement of windows

    Granted Full applications Windows or glazing 9 docs
  • Ground Floor Navigation House South Quay Drive Sheffield S2 5SU

    26/01894/FUL Submitted 25 Jun 2026 237m away

    92% historically approved · decision due ~16 Sep

    Formation of new customer entrance including construction of ramp and step access and erection of wall mounted canopy with provision of 5no. disabled parking spaces

    Awaiting decision Full applications 7 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications