Planning application
7 Delph House Road Sheffield S10 5NR
Works: Extension Loft or dormer Roofing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Alterations to roof to form additional habitable space including hip to gable extension, erection of rear dormer and raising of ridge height
As published by the council, reference 26/02159/FUL
Application record
- Reference
- 26/02159/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 17 Jul 2026
- Validated
- 4 Aug 2026
- Postcode
- S10 5NR
Timeline
Dates from the published record
-
17 Jul 2026
Received by Sheffield
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 49 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
40 Delph House Road Sheffield S10 5NR
92% historically approved · decision due ~10 Aug
Erection of two-storey side extension, single-storey rear extension and single-storey front extension with render finish and erection of single-storey detached garage to rear of dwellinghouse including formation of dropped kerb access from Marsh Lane (Application under Section 73 to vary condition no 2. (Approved Plans) as imposed by planning permission 20/04639/FUL)
Awaiting decision Full applications ExtensionSmall domestic -
2 Delph House Road Sheffield S10 5NR
Alterations to roof of dwellinghouse including raised ridge height, hip-to-gable extension and erection of dormer window with Juliet balcony to rear
Granted Full applications Extension Loft or dormer +2 7 docsDomestic -
40 Delph House Road Sheffield S10 5NR
Erection of two-storey side extension, single-storey front, side and rear extensions to dwellinghouse and erection of detached double garage to rear
Withdrawn Full applications Extension 19 docsSmall domestic -
Church Of St Columba Manchester Road Crosspool Sheffield S10 5PL
1no. notice board sign and 1no. church name letter sign to the front elevation of the church (non illuminated)
Granted Advertising 5 docs -
Site Of 340 Lydgate Lane Sheffield S10 5FU
Erection of a three/four-storey building to form 7x apartments with associated landscaping, car parking, bike storage and refuse storage
Granted Full applications New dwelling 19 docs -
Site Of 340 Lydgate Lane Sheffield S10 5FU
Application to approve details in relation to condition numbers 3 (surface water), 4 (ecological enhancement), 5 (tree protection measures), 6 (external materials and finishes), 7 (boundary treatment), 8 (renewable/low carbon energy), 9 (landscape works), 11 (bin storage), relating to planning permission 23/02687/FUL
Decided Conditions Trees 17 docs
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse