Planning application
RCC Furniture Crown Works Bland Street Sheffield S4 8DG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of building to waste metals recycling facility
As published by the council, reference 26/01603/FUL
Application record
- Reference
- 26/01603/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 29 May 2026
- Validated
- 31 Jul 2026
- Postcode
- S4 8DG
Timeline
Dates from the published record
-
29 May 2026
Received by Sheffield
-
31 Jul 2026
Validated
Checked as complete and ready for consideration.
-
18 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 49 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Roplas Ltd Unit 4 Carlisle Business Park 515 Petre Street Sheffield S4 8DX
Use of industrial unit for the repair/maintenance of motor vehicles and the storage and fitting of tyres (Use Classes B1(c), B2 and B8)
Granted Full applications 6 docs -
Key Stage 3 Inclusion Centre Earl Marshal Road Sheffield S4 8FB
Provision of photovoltaic slates including wiring and batteries to roof (Amended Plans 30.01.2024)
Granted Full applications 16 docs -
Key Stage 3 Inclusion Centre Earl Marshal Road Sheffield S4 8FB
Provision of photovoltaic slates including wiring and batteries to roof (Amended Plans 30.01.2024)
Granted Heritage and listed buildings 16 docs -
Sytner BMW Sheffield Brightside Way Sheffield S9 2RQ
Installation of Solar PV system to roof of building
Granted Prior approval 6 docs -
Advertising Right At Junction With Upwell Street Carlisle Street East Sheffield S4 8AJ
Erection of 48 sheet paper advertisement display
Refused Advertising 15 docs -
Neill Tools Ltd 17 Atlas Way Sheffield S4 7QQ
92% historically approved · decision due ~10 Sep
Erection of 2no. temporary single-storey ancillary buildings
Awaiting decision Full applications 13 docsSmall domestic
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse