Planning application
Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application to approve details in relation to condition numbers: 3 (Detailed Battery Safety Management Plan (DBSMP)), 5 (Biodiversity Construction Environmental Management Plan (Biodiversity CEMP)) and the Statutory Biodiversity Net Gain condition relating to planning permission 26/00871/FUL
As published by the council, reference 26/00871/COND1
Application record
- Reference
- 26/00871/COND1
- Type
- Approval of Detail Reserved by Condition
- Status
- Awaiting decision
- Received
- 8 Sep 2026
- Validated
- 8 Sep 2026
- Ward
- Mosborough
- Postcode
- S20 3RW
Comment by 30 September 2026
The council is taking comments on this application until then. Have your say on Sheffield's portal.
Site history
Applications at this address on the Sheffield register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
23/02361/FUL Granted
Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW
Erection of 2 fire water tanks, pumphouse, 2 valve houses and other ancillary plant and equipment to support the operation of the community renewable energy facility
Timeline
Dates from the published record
-
8 Sep 2026
Received by Sheffield
-
10 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sheffield took a median of 49 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Sheffield for determination, against a statutory target of eight weeks. Over the last year Sheffield decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Units 2 & 3 White Rose Business Park 15 Meadowbrook Park Sheffield S20 3AB
Change of use from Industrial unit to Personal Training Studio ( Gym) and retention of 2 external roller shutter doors
Granted Full applications 8 docs -
Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW
Erection of 2 fire water tanks, pumphouse, 2 valve houses and other ancillary plant and equipment to support the operation of the community renewable energy facility
Granted Full applications 14 docs -
Land At Rear Of Hadee Engineering Co Ltd Rother Valley Way Sheffield S20 3GH
Application to approve details in relation to condition numbers 7. Phase 1 Preliminary Risk Assessment Report; 22. Phase 2 Intrusive Site Investigation Report of planning permission 12/00752/FUL
Decided Conditions 30 docs -
Land At Rear Of Hadee Engineering Co Ltd Rother Valley Way Sheffield S20 3GH
Application to allow minor changes to elevation/layout (Application under Section 73 to vary condition No. 2 Approved plans; as imposed by planning permission 12/00752/FUL - Erection of a Community Renewable Energy Centre
Granted Full applications 34 docs -
Land At Rear Of Hadee Engineering Co Ltd Rother Valley Way Sheffield S20 3GH
Application to approve details in relation to Condition No. 10. Nitrogen Dioxide Monitoring; relating to planning permission no. 12/00752/FUL
Decided Conditions 7 docs -
Land Between Junction With Longacre Way And Lion Park New Street Holbrook Sheffield S20 3GH
Erection of 3no. Class E(g)/B2/B8 blocks together with associated accesses, external works, landscaping and creation of a substation and meter room (Application under Section 73 to remove condition no(s) 9 (sound attenuation works) as imposed by planning permission 22/04252/FUL, previously varied under 24/02451/FUL)
Granted Full applications 9 docs
Other condition discharge and variation applications
In Sheffield
-
25/02009/COND1 Awaiting decision
Yemeni Refugee Support Group 9 Gower Street Sheffield S4 7HA
Application to approve details in relation to condition number(s): 3 (External Materials) imposed by planning permission 25/02009/FUL
-
23/01960/COND4 Awaiting decision
Park Hill Estate Duke Street Park Hill Sheffield S2 5RQ
Application to approve details in relation to condition numbers: 5, 6 and 7 (Drainage), 17 (Contamination) and 18 (Intrusive Investigation) imposed by planning permission 23/01960/FUL
-
23/03815/COND25 Decided
Land At Junction With Herries Road, Herries Road South And Penistone Road North Sheffield S6 1QE
Application to approve details in relation to condition numbers: 7 & 8 (Highways) relating to planning permission 26/00386/OUT
-
24/00257/COND1 Decided
33 Jaunty Lane Sheffield S12 3DL
Application to approve details in relation to condition no(s) 3 (external materials/finishes) relating to planning permission 24/00257/FUL
-
26/00953/COND1 Decided
Bay Trees 16 Cavendish Avenue Dore Sheffield S17 3NJ
Application to approve details in relation to condition no(s) 3 (Drainage) as imposed by planning permission 26/00953/FUL