Skip to content
PlanIndex Get alerts
Menu

Planning application

Site Of Jamia Al Hudaa Independent College Bawtry Road Sheffield S9 1WD

Awaiting decision Sheffield 26/00287/FUL Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 108 dwellings with associated parking, public open space, landscaping and formation of site access

As published by the council, reference 26/00287/FUL

Application record

Reference
26/00287/FUL
Type
Full Planning Application
Status
Awaiting decision
Received
3 Feb 2026
Validated
12 Feb 2026
Ward
Darnall
Postcode
S9 1WD

Timeline

Dates from the published record

  1. 3 Feb 2026

    Received by Sheffield

  2. 12 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

50 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Sheffield for determination, against a statutory target of eight weeks. Over the last year Sheffield decided full applications in a median of 76 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 23 St Lawrence Glebe Sheffield S9 1TB

    26/01394/FUL Submitted 13 May 2026 198m away

    Demolition of rear conservatory, erection of a single-storey side and rear extension, and conversion of integral garage to form additional living space to dwellinghouse

    Granted Full applications Extension Demolition 6 docs
    Small domestic
  • 183 Bawtry Road Sheffield S9 1UZ

    23/03854/FUL Submitted 5 Dec 2023 206m away

    Demolition of detached garage, alterations to roof including hip-to-gable extension, erection of rear dormer window and rooflight to front, erection of two-storey side/rear extension and porch to front of dwellinghouse

    Granted Full applications Extension Loft or dormer +2 11 docs
    Small domestic
  • 35 Maplebeck Drive Sheffield S9 1WH

    14/04369/FUL Submitted 1 Dec 2014 380m away

    Demolition of existing garage and erection of a two-storey side extension and dormer windows to the rear elevation

    Refused Full applications Extension Loft or dormer +2 18 docs
  • 14 Maplebeck Drive Sheffield S9 1WH

    26/02039/FUL Submitted 8 Jul 2026 380m away

    Erection of rear single-storey extension, rear dormer extension and rear veranda to dwellinghouse

    Refused Full applications Extension Loft or dormer 5 docs
    Small domestic
  • 324 Ferrars Road Sheffield S9 1WR

    23/00306/FUL Submitted 30 Jan 2023 412m away

    Alterations to roof including erection of dormer window to rear and 2x rooflights to front, erection of two-storey side and rear extension, and single-storey front and rear extensions to dwellinghouse

    Granted Full applications Extension Loft or dormer +1 5 docs
    Small domestic
  • 272 Ferrars Road Sheffield S9 1WR

    15/02876/COND1 Submitted 1 Sep 2026 416m away

    91% historically approved · decision due ~27 Oct

    Application to approve details in relation to condition number(s): 4 (Parking) imposed by planning permission 15/02876/FUL

    Awaiting decision Conditions 4 docs

In Sheffield

  • 26/01562/FUL Granted

    29 Whiteley Wood Road Sheffield S11 7FF

    Demolition of detached garage and erection of dwellinghouse (self build) within side curtilage of existing dwellinghouse (29 Whiteley Wood Road), involving erection of wall and fencing to denote curtilage division, associated parking and landscaping and alterations to existing vehicular driveway

    27 May 2026 Full applications
  • 26/00969/FUL Granted

    Cecil Square Mosque 14 - 24 Cecil Square Sheffield S2 4NT

    Erection of first floor extension, associated internal alterations, installation of new facing materials including render and cladding and provision of external bin storage area

    2 Apr 2026 Full applications
  • 26/02057/FUL Granted

    Sculpt Fitness Studios Ltd Clough Bank Works Clough Bank Sheffield S2 4EA

    Erection of single-storey extension to gym

    9 Jul 2026 Full applications
  • 26/02071/FUL Refused

    Far Whiteley Farm Hangram Lane Sheffield S11 7TQ

    Erection of timber framed canopy/ gazebo

    10 Jul 2026 Full applications
  • 26/02175/FUL Refused

    573 City Road Sheffield S2 1GL

    Provision of dropped kerb and parking area to dwellinghouse

    20 Jul 2026 Full applications