Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Standish Avenue Sheffield S5 8XQ

Granted Sheffield 25/03298/FUL Full Planning Application

Works: Extension Loft or dormer Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of detached rear garage, and erection of a rear dormer extension, two-storey side/rear extension, and single-storey front and rear extensions to dwellinghouse

As published by the council, reference 25/03298/FUL

Application record

Reference
25/03298/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
5 Nov 2025
Validated
5 Nov 2025
Decided
18 Dec 2025
Ward
Burngreave
Decision by
Delegated decision
Postcode
S5 8XQ

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Sheffield

  2. 18 Dec 2025

    Decision issued: Grant Conditionally

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 257 Shirecliffe Road Sheffield S5 8XE

    26/02011/FUL Submitted 6 Jul 2026 180m away

    92% historically approved · decision due ~31 Aug

    Demolition of conservatory and erection of single-storey rear extension to dwellinghouse

    Awaiting decision Full applications Extension Demolition
    Small domestic
  • 257 Shirecliffe Road Sheffield S5 8XE

    26/01548/HPN Submitted 26 May 2026 240m away

    Single-storey rear extension to dwellinghouse - the extension is 8 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and the height of the eaves is 3 metres

    Refused Prior approval Extension Roofing 5 docs
    Small domestic
  • 37 Standish Gardens Sheffield S5 8YD

    26/02267/FUL Submitted 28 Jul 2026 252m away

    92% historically approved · decision due ~22 Sep

    Erection of single-storey side extension to dwellinghouse

    Awaiting decision Full applications Extension
    Small domestic
  • 15 High View Sheffield S5 8YE

    21/02770/FUL Submitted 16 Jun 2021 258m away

    Alterations to dwellinghouse including raising the roof to form an additional level of habitable accommodation, single storey side extension and new stepped access (amended description)

    Granted Full applications Extension 18 docs
    Small domestic
  • St Catherines Catholic Primary School Firshill Crescent Sheffield S4 7BX

    23/02933/FUL Submitted 18 Sep 2023 461m away

    Use of Caretaker's accommodation as an educational building (Use Class F1)

    Granted Full applications 6 docs
  • Site Of Former Sheffield Ski Village Vale Road Sheffield S3 9SJ

    26/02305/EIA Submitted 31 Jul 2026 489m away

    92% historically approved · decision due ~25 Sep

    EIA (Environmental Impact Assessment) request for a screening opinion for a hybrid planning application for the phased redevelopment of Parkwood Springs to create a year round adventure tourism destination comprising the construction and operation of a downhill karting Luge ride, zip line experience, Beat The Storm attraction, outdoor surf wave rider facility and the redevelopment of the existing outdoor ski slope, construction of a primary visitor hub building incorporating hospitality, food and beverage, retail and visitor facilities, construction of a ski hub building, formation of a public plaza and associated public realm, provision of ancillary car parking and associated access, engineering, landscaping, drainage, lighting, servicing and other infrastructure works

    Awaiting decision Outline 2 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications