Skip to content
PlanIndex Get alerts
Menu

Planning application

81 Kilvington Road Sheffield S13 8AG

Granted Sheffield 25/02794/FUL Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of attached outbuilding and erection of single-storey front/side extension to dwellinghouse

As published by the council, reference 25/02794/FUL

Application record

Reference
25/02794/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
19 Sep 2025
Validated
19 Sep 2025
Decided
12 Nov 2025
Ward
Richmond
Decision by
Delegated decision
Postcode
S13 8AG

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Sheffield

  2. 12 Nov 2025

    Decision issued: Grant Conditionally

  3. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 70 Kilvington Crescent Sheffield S13 8AB

    26/02045/FUL Submitted 8 Jul 2026 73m away

    Demolition of existing single-storey front and side outhouse extension and erection of a two-storey side extension to dwellinghouse

    Granted Full applications Extension Demolition 10 docs
    Small domestic
  • The Foxwood 57 Mansfield Road Sheffield S12 2AG

    23/03688/FUL Submitted 22 Nov 2023 230m away

    Demolition of public house, erection of 12 supported living units in 1x two-storey block (Use Class C3b) and 5 dwellinghouses (Use Class C3) (Amended Description)

    Refused Full applications Demolition 26 docs
    Several homes
  • 13A Mansfield Road Sheffield S12 2AE

    26/00324/FUL Submitted 6 Feb 2026 282m away

    Erection of two-storey detached dwellinghouse with associated works and off-street parking (self build)

    Granted Full applications New dwelling 18 docs
    Domestic
  • Land By Junction Woodhouse Road/Normanton Hill/ Richmond Road, Sheffield Woodthorpe S12 2DS

    21/03846/TEL Submitted 25 Aug 2021 379m away

    Erection of 5G H3G Phase 8 18m high street pole c/w wrap-around cabinet, including 3no. equipment cabinets and associated works (Application for determination if approval required for siting and appearance)

    Refused Telecoms Extension 12 docs
  • 66 Harthill Road Sheffield S13 8AN

    19/03376/FUL Submitted 12 Sep 2019 380m away

    Erection of single-storey rear extension to dwellinghouse including stepped access

    Granted Full applications Extension 6 docs
    Small domestic
  • Garages Adjacent 55 Sharrard Grove Sheffield S12 2FD

    25/02984/COND1 Submitted 26 May 2026 396m away

    Application to approve details in relation to condition numbers: 3 (Phase 1 Preliminary Risk Assessment Report), 4 (Phase 2 Intrusive Site Investigation Report), 6 (Landscaping), 9 (External Materials and Finishes), 10 (Site Boundary Treatments), and 12 (Construction Vehicle Ingress and Egress) Relating to planning permission 25/02984/FUL

    Decided Conditions 10 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications