Planning application
73 Greenhill Main Road Sheffield S8 7RE
Works: Extension Roofing Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Partial demolition and alterations to existing single-storey side extension including new roof and erection of single-storey side extensions to dwellinghouse including entrance porch
As published by the council, reference 24/00765/FUL
Application record
- Reference
- 24/00765/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 11 Mar 2024
- Validated
- 11 Mar 2024
- Decided
- 3 May 2024
- Ward
- Beauchief & Greenhill
- Decision by
- Delegated decision
- Postcode
- S8 7RE
Timeline
Dates from the published record
-
11 Mar 2024
Received by Sheffield
-
3 May 2024
Decision issued: Grant Conditionally
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
71 Greenhill Main Road Sheffield S8 7RE
Pruning of trees (Greenhill Conservation Area)
Granted Trees 4 docs -
87 Greenhill Main Road Sheffield S8 7RE
Pruning of tree (Greenhill Conservation Area)
Granted Trees 7 docs -
73 Greenhill Main Road Sheffield S8 7RE
Pruning of trees (Greenhill Conservation Area)
Granted Trees 3 docs -
87 Greenhill Main Road Sheffield S8 7RE
Removal of trees (Greenhill Conservation Area)
Granted Trees 4 docs -
71 Greenhill Main Road Sheffield S8 7RE
Removal of tree (Tree Preservation Order No. 808/047)
Granted Trees 6 docs -
87 Greenhill Main Road Sheffield S8 7RE
Removal of a tree (Greenhill Conservation Area)
Granted Trees 7 docs
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse