Skip to content
PlanIndex Get alerts
Menu

Planning application

T J Elsdon Construction Ltd 2A Midland Street Sheffield S1 4SZ

Granted Sheffield 24/00484/FUL Full Planning Application

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of rear dormer window (amended description 30.04.24)

As published by the council, reference 24/00484/FUL

Application record

Reference
24/00484/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
16 Feb 2024
Validated
6 Mar 2024
Decided
1 May 2024
Ward
City
Decision by
Delegated decision
Postcode
S1 4SZ

Timeline

Dates from the published record

  1. 16 Feb 2024

    Received by Sheffield

  2. 6 Mar 2024

    Validated

    Checked as complete and ready for consideration.

  3. 1 May 2024

    Decision issued: Grant Conditionally

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 13 Midland Street Sheffield S1 4SZ

    26/02500/LU1 Submitted 19 Aug 2026 31m away

    92% historically approved · decision due ~15 Oct

    Certificate of Lawfulness for use of dwellinghouse as a house in multiple occupation (HMO) for 5 persons (Use Class C4) (Application under Section 191)

    Awaiting decision
    Domestic
  • 43 Charlotte Road Sheffield S1 4TJ

    26/01500/LU1 Submitted 19 May 2026 31m away

    Certificate of Lawfulness for existing use as a house in multiple occupation (HMO) (Use Class C4) (Application under Section 191)

    Granted Lawful development 6 docs
  • 97 Clough Road Sheffield S1 4TA

    24/00716/LA1 Submitted 5 Mar 2024 31m away

    Application to establish the lawful use of the property as a house in multiple occupation (HMO) for 3 to 6 unrelated occupants (Use Class C4) (Application under Section 191)

    Refused Lawful development 6 docs
  • 31 Charlotte Road Sheffield S1 4TJ

    21/03919/LD2 Submitted 2 Sep 2021 56m away

    Application for a Lawful Development Certificate for the erection of a dormer window to the rear of the dwellinghouse (Application under Section 192)

    Granted Lawful development Loft or dormer Windows or glazing 12 docs
    Domestic
  • 29 Charlotte Road Sheffield S1 4TJ

    21/04025/LD2 Submitted 2 Sep 2021 60m away

    Application for a Lawful Development Certificate for the erection of a dormer window to the rear of the dwellinghouse (Application under Section 192)

    Granted Lawful development Loft or dormer Windows or glazing 6 docs
    Domestic
  • The Anvil 109 Clough Road Sheffield S2 4TB

    26/02589/FUL Submitted 1 Sep 2026 119m away

    92% historically approved · decision due ~27 Oct

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    Awaiting decision Full applications

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications