Skip to content
PlanIndex Get alerts
Menu

Planning application

14 Milden Road Sheffield S6 4AU

Granted Sheffield 23/03152/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single-storey rear extension with rendering to dwellinghouse

As published by the council, reference 23/03152/FUL

Application record

Reference
23/03152/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
4 Oct 2023
Validated
4 Oct 2023
Decided
13 Dec 2023
Ward
Hillsborough
Decision by
Delegated decision
Postcode
S6 4AU

Timeline

Dates from the published record

  1. 4 Oct 2023

    Received by Sheffield

  2. 13 Dec 2023

    Decision issued: Grant Conditionally

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18 Vainor Road Sheffield S6 4AN

    26/01800/FUL Submitted 15 Jun 2026 74m away

    92% historically approved · decision due ~10 Aug

    Widening of driveway and formation of new pedestrian access gateway together with new path/steps

    Decided Full applications
  • 37 Vainor Road Sheffield S6 4AP

    16/00681/COND1 Submitted 18 Jan 2017 95m away

    Application to approve details relating to condition 3) external materials and finishes, of planning permission no. 16/00681/FUL

    Withdrawn Conditions 4 docs
  • 59 Vainor Road Sheffield S6 4AP

    24/00745/FUL Submitted 8 Mar 2024 158m away

    Demolition of existing garage and erection of a new double garage

    Granted Full applications Demolition 20 docs
  • 121 Airedale Road Sheffield S6 4AW

    21/02431/FUL Submitted 25 May 2021 227m away

    Demolition of detached garage, erection of two-storey side extension to dwellinghouse and existing access widened to allow off road parking

    Granted Full applications Extension Demolition 6 docs
    Domestic
  • Land Adjoining 454 Worrall Road Worrall Sheffield S6 4BA

    06/02207/TPC Submitted 5 Jun 2006 244m away

    Pruning of Trees

    Granted Trees 7 docs
  • Horse And Jockey 250 Wadsley Lane Sheffield S6 4EF

    21/01391/COND2 Submitted 10 Aug 2021 256m away

    Application to approve details in relation to condition no. 3. Fume and odour control mitigation; relating to planning permission 21/01391/FUL

    Decided Conditions 14 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications