Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Rushley Drive Sheffield S17 3EL

Granted Sheffield 23/02455/FUL Full Planning Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 2 storey side extension, single storey rear extension, and rear dormer to create habitable room in roofspace

As published by the council, reference 23/02455/FUL

Application record

Reference
23/02455/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
30 Jul 2023
Validated
31 Jul 2023
Decided
15 Nov 2023
Ward
Dore & Totley
Decision by
Delegated decision
Postcode
S17 3EL

Timeline

Dates from the published record

  1. 30 Jul 2023

    Received by Sheffield

  2. 31 Jul 2023

    Validated

    Checked as complete and ready for consideration.

  3. 15 Nov 2023

    Decision issued: Grant Conditionally

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 19 Rushley Drive Sheffield S17 3EL

    26/02061/NMA Submitted 9 Jul 2026 46m away

    92% historically approved · decision due ~3 Sep

    Application to allow alterations to fenestration (Amendment to planning permission 26/00970/FUL)

    Awaiting decision Amendments Windows or glazing 2 docs
  • 24 Rushley Road Sheffield S17 3EJ

    23/03117/FUL Submitted 2 Oct 2023 83m away

    Single-storey rear extension, erection of a rear dormer, raising of roof over existing garage and erection of a garden room

    Granted Full applications Extension Loft or dormer 7 docs
    Small domestic
  • 20 Rushley Drive Sheffield S17 3EN

    14/01582/FUL Submitted 30 Apr 2014 110m away

    Single/two storey side/rear extension, erection of front porch, raised patio/deck at rear and construction of a means of vehicular access/front parking space (Resubmission of 14/00036/FUL)

    Granted Full applications Extension 6 docs
    Small domestic
  • Hallamshire Osteopathy 12 Causeway Head Road Sheffield S17 3DT

    26/02104/FUL Submitted 13 Jul 2026 115m away

    92% historically approved · decision due ~7 Sep

    External alterations to front elevation of audiology clinic including replacement windows and entrance doors, and alterations to external hardstanding areas

    Awaiting decision Full applications Windows or glazing
  • Hallamshire Osteopathy 12 Causeway Head Road Sheffield S17 3DT

    26/02265/ADV Submitted 28 Jul 2026 115m away

    92% historically approved · decision due ~28 Oct

    1no. fascia sign with 7no. exterior LED lights above and 1no. digital display screen behind glazed shopfront

    Awaiting decision Advertising Windows or glazing
  • 170 Dore Road Sheffield S17 3HA

    26/02149/FUL Submitted 17 Jul 2026 122m away

    92% historically approved · decision due ~11 Sep

    Erection of single-storey side extension, alterations to integral garage and store to form habitable accommodation to dwellinghouse

    Awaiting decision Full applications Extension
    Small domestic

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications