Skip to content
PlanIndex Get alerts
Menu

Planning application

Woodside House 355 Loxley Road Sheffield S6 4TH

Granted Sheffield 21/03441/FUL Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of outbuilding, erection of single-storey rear extension and link extension to outbuildings at rear of garden to be used as ancillary accommodation to the main dwelling and associated works to dwellinghouse

As published by the council, reference 21/03441/FUL

Application record

Reference
21/03441/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
29 Jul 2021
Validated
29 Jul 2021
Decided
21 Sep 2021
Ward
Hillsborough
Decision by
Delegated decision
Postcode
S6 4TH

Timeline

Dates from the published record

  1. 29 Jul 2021

    Received by Sheffield

  2. 21 Sep 2021

    Decision issued: Grant Conditionally

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 294 Loxley Road Sheffield S6 4TH

    26/01403/FUL Submitted 13 May 2026 98m away

    Demolition of conservatory and erection of a single-storey front extension to dwellinghouse

    Granted Full applications Extension Demolition 12 docs
    Small domestic
  • 100 Myers Grove Lane Sheffield S6 5JH

    14/03602/FUL Submitted 27 Sep 2014 215m away

    Application to separate cattery business from domestic accommodation (Application to remove condition 6 of planning permission no. 10/02243/FUL)

    Refused Full applications 6 docs
  • Land Adjacent To 100 Myers Grove Lane Sheffield S6 5JH

    14/02001/FUL Submitted 4 Jun 2014 215m away

    Erection of dwellinghouse to be used in conjunction with the existing cattery business

    Refused Full applications 13 docs
    Domestic
  • Site Of Pinegrove Country Club Myers Grove Lane Sheffield S6 5JH

    14/01910/COND Submitted 14 May 2014 215m away

    Application to approve details in relation to conditions 7. landscaping scheme; 14. remediation strategy report and 15. development in accordance with remediation strategy relating to planning permission 12/00685/FUL

    Decided Conditions 19 docs
  • 106 Myers Grove Lane Sheffield S6 5JH

    26/02412/FUL Submitted 10 Aug 2026 215m away

    92% historically approved · decision due ~23 Oct

    Erection of outbuilding for home office use in rear garden of dwellinghouse

    Awaiting decision Full applications 5 docs
    Small domestic
  • Loxley Bank 120 Myers Grove Lane Sheffield S6 5JH

    17/02222/COND1 Submitted 11 Oct 2019 263m away

    Application to approve details in relation to condition number(s): 3 (Method Statement for the removal or control of Japanese Knotweed and Himalayan Basam) and 4 (Construction access route - tree protection) imposed by planning permission 17/02222/FUL

    Decided Conditions Trees 8 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications