Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Torbay Road Sheffield S4 7SN

Granted Sheffield 21/03259/FUL Full Planning Application

Works: Extension Loft or dormer Roofing Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of detached garage, erection of two-storey side extension, and alterations and extension to roof to form additional habitable accommodation including raising of ridge height and erection of rear dormer to dwellinghouse (Resubmission of 21/01311/FUL)

As published by the council, reference 21/03259/FUL

Application record

Reference
21/03259/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
19 Jul 2021
Validated
19 Jul 2021
Decided
13 Sep 2021
Ward
Burngreave
Decision by
Delegated decision
Postcode
S4 7SN

Timeline

Dates from the published record

  1. 19 Jul 2021

    Received by Sheffield

  2. 13 Sep 2021

    Decision issued: Grant Conditionally

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Sheffield granted permission on 13 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Edale Lodge 344 Grimesthorpe Road Sheffield S4 7EW

    26/01979/FUL Submitted 2 Jul 2026 150m away

    92% historically approved · decision due ~27 Aug

    Installation of replacement painted timber windows, replacement timber cladding, and the infilling of blocked door openings with matching stone, and provision of CCTV and external lighting

    Awaiting decision Full applications Windows or glazing 14 docs
  • Edale Lodge 344 Grimesthorpe Road Sheffield S4 7EW

    26/01980/LBC Submitted 2 Jul 2026 150m away

    92% historically approved · decision due ~27 Aug

    Replacement and retention of timber windows to the principal elevations and service wing, retention and refurbishment of entrance/rear doors; replacement of internal timber doors, external lighting, fire alarm, boilers, extract vents and signage; replacement of inappropriate laminate flooring with traditional timber flooring where required; repairs to the boundary wall; replacement of modern cladding with painted timber boarding; infilling of blocked door openings with matching stone where appropriate

    Awaiting decision Heritage and listed buildings Windows or glazing 15 docs
    Small domestic
  • 45 Sturton Road Sheffield S4 7DE

    26/01637/FUL Submitted 2 Jun 2026 241m away

    92% historically approved · decision due ~5 Aug

    Demolition of garage, erection of single-storey detached annex

    Decided Full applications Demolition
    Small domestic
  • 33 Pexton Road Sheffield S4 7DA

    19/03426/HPN Submitted 17 Sep 2019 298m away

    Single-storey rear extension - the extension is 6 metres from the rear of the original dwellinghouse, ridge height no more than 3.6 metres and height to the eaves of 2.2 metres

    Granted Prior approval Extension Roofing 9 docs
    Small domestic
  • 9 Pexton Road Sheffield S4 7DA

    14/03965/FUL Submitted 27 Oct 2014 310m away

    Alterations, including dormer windows, to rear outbuilding to create annexe accommodation on ground floor with storage above (retrospective application)

    Granted Full applications Loft or dormer Windows or glazing 12 docs
  • Telecommunications Mast On Roof Of 8 Pexton Road Sheffield S4 7DA

    26/01766/FULTEL Submitted 12 Jun 2026 310m away

    92% historically approved · decision due ~7 Aug

    Upgrade of existing telecommunications base station including removal and replacement of 5.0m stub tower supporting 6no. antennas with 7.5m stub tower supporting 6no. antennas, 2no. 0.3m dishes, removal of 1no. equipment cabinet, installation of 2no. equipment cabinets, and ancillary development

    Decided

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications