Planning application
101 Norton Park Road Sheffield S8 8GR
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Demolition of single-storey side extension, erection of two-storey side extension including integral garage, erection of single-storey rear extension to dwellinghouse and formation of gable end to dwelling (Amended Description)
As published by the council, reference 21/02774/FUL
Application record
- Reference
- 21/02774/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Refuse
- Received
- 16 Jun 2021
- Validated
- 16 Jun 2021
- Decided
- 19 Oct 2021
- Ward
- Graves Park
- Decision by
- Delegated decision
- Postcode
- S8 8GR
Timeline
Dates from the published record
-
16 Jun 2021
Received by Sheffield
-
19 Oct 2021
Decision issued: Refuse
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
81 Norton Park Road Sheffield S8 8GR
Alterations to roof including raising of ridge height and provision of dormer window to rear to create habitable rooms in roofspace
Granted Full applications Loft or dormer Roofing +1 10 docs -
87 Little Norton Lane Sheffield S8 8GB
Alterations and extension to roof including hip to gable extension and rear dormer extension, and erection of a single-storey side and single-storey rear extension to dwellinghouse
Refused Full applications Extension Loft or dormer 6 docsSmall domestic -
107 Norton Lane Sheffield S8 8GX
Erection of a two-storey side extension, a single-storey rear extension and an annex to the rear of dwellinghouse
Granted Full applications Extension 6 docsSmall domestic -
107 Norton Lane Sheffield S8 8GX
Demolition of car port, erection of single-storey side/rear/front extension and erection of single-storey detached outbuilding to be used for gym/home office ancillary to dwellinghouse
Granted Full applications Extension Demolition 13 docsSmall domestic -
57 Norton Park Road Sheffield S8 8GQ
Alterations to existing flat roof to form a pitched roof
Granted Full applications 7 docs -
Unit 10 St James' Retail Park Bochum Parkway Sheffield S8 8BS
92% historically approved · decision due ~25 Sep
Creation of additional floorspace at mezzanine level (Class E)
Awaiting decision Full applications
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse