Planning application
15 High View Sheffield S5 8YE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to dwellinghouse including raising the roof to form an additional level of habitable accommodation, single storey side extension and new stepped access (amended description)
As published by the council, reference 21/02770/FUL
Application record
- Reference
- 21/02770/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 16 Jun 2021
- Validated
- 28 Jun 2021
- Decided
- 20 Oct 2021
- Ward
- Burngreave
- Decision by
- Committee Decision
- Postcode
- S5 8YE
Timeline
Dates from the published record
-
16 Jun 2021
Received by Sheffield
-
28 Jun 2021
Validated
Checked as complete and ready for consideration.
-
20 Oct 2021
Decision issued: Grant Conditionally
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
St Catherines Catholic Primary School Firshill Crescent Sheffield S4 7BX
Use of Caretaker's accommodation as an educational building (Use Class F1)
Granted Full applications 6 docs -
11 Standish Avenue Sheffield S5 8XQ
Demolition of detached rear garage, and erection of a rear dormer extension, two-storey side/rear extension, and single-storey front and rear extensions to dwellinghouse
Granted Full applications Extension Loft or dormer +1 10 docsSmall domestic -
81 Roe Lane Sheffield S3 9AL
92% historically approved · decision due ~4 Aug
Erection of a timber frame gazebo to rear of dwellinghouse
Decided Full applicationsDomestic -
78 Roe Lane Sheffield S3 9AL
Alterations to dwellinghouse including erection of front dormer window, provision of vehicular hardstanding, front boundary wall and gates and change of use of dwellinghouse (Use Class C3) to a care home (Use Class C2)
Granted Full applications Loft or dormer Windows or glazing 18 docsSmall domestic -
Toll Bar Cottage 189 Burngreave Road Sheffield S3 9DL
92% historically approved · decision due ~2 Sep
Repair and rebuilding of boundary wall, replacement of timber gate frame to match existing, installation of timber boundary fencing, formation of a concrete hardstanding within the rear yard
Awaiting decision Full applications 8 docsSmall domestic -
Toll Bar Cottage 189 Burngreave Road Sheffield S3 9DL
92% historically approved · decision due ~2 Sep
Removal of existing bathroom partitions, formation of a new accessible wet room, installation of replacement kitchen units, blocking up of an existing internal archway, replacement ceilings and internal redecoration, repair and rebuilding of boundary wall, replacement of timber gate frame to match existing, installation of timber boundary fencing, formation of a concrete hardstanding within the rear yard and repair of the front entrance threshold
Awaiting decision Heritage and listed buildings 8 docsSmall domestic
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse