Skip to content
PlanIndex Get alerts
Menu

Planning application

Platform 5 Publishing Ltd 3 Sark Road Sheffield S2 4HG

Granted Sheffield 15/00454/CHU Planning Application for Change of Use

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Use of warehouse as a teaching centre for childrens gymnastics (Use Class D2 - Assembly and Leisure) (email received on 24/03/2015)

As published by the council, reference 15/00454/CHU

Application record

Reference
15/00454/CHU
Type
Planning Application for Change of Use
Status
Decided
Decision
Grant Conditionally
Received
6 Feb 2015
Validated
6 Mar 2015
Decided
10 Apr 2015
Ward
City
Decision by
Delegated decision
Postcode
S2 4HG

Timeline

Dates from the published record

  1. 6 Feb 2015

    Received by Sheffield

  2. 6 Mar 2015

    Validated

    Checked as complete and ready for consideration.

  3. 10 Apr 2015

    Decision issued: Grant Conditionally

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Furniture Barn 15 Guernsey Road Sheffield S2 4HG

    15/00239/ADV Submitted 19 Jan 2015 0m away

    Replace fascia sign on front elevation and move existing front signage to rear elevation

    Granted Advertising 11 docs
  • Advertising Right 0404 5070 Outside Halfords Queens Road Highfield Sheffield S2 4HG

    19/00206/HOARD Submitted 21 Jan 2019 0m away

    92% historically approved · decision due ~18 Mar

    Upgrading of existing double sided advertising panels with double sided digital panels

    Awaiting decision Advertising
  • 15 Guernsey Road Sheffield S2 4HG

    23/01459/FUL Submitted 4 May 2023 65m away

    Erection of a substation, 8x ultra-rapid electric vehicle chargers and associated electrical equipment

    Withdrawn Full applications 21 docs
  • Shahla Hair Salon 448 London Road Sheffield S2 4HP

    26/02502/FUL Submitted 20 Aug 2026 98m away

    92% historically approved · decision due ~29 Oct

    Change of use of ground floor shop (Use Class E) to 1no. studio flat (Use Class C3), including external alterations to the front and rear elevations

    Awaiting decision Full applications
  • Unit 1 13 - 17 Oak Street Heeley Sheffield S8 9UB

    26/01156/FUL Submitted 20 Apr 2026 250m away

    Change of use of Unit 1 from commercial/business use (Use Class E) to non-residential education and training (Use Class F1) and provision of associated parking

    Withdrawn Full applications 23 docs
  • 89 Abbeydale Road Sheffield S7 1FE

    21/02236/FUL Submitted 13 May 2021 272m away

    Erection of a decked area to accommodate outdoor seating to the front of the shop

    Granted Full applications 7 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications