Skip to content
PlanIndex Get alerts
Menu

Planning application

38A Hendon Street Sheffield S13 9AX

Granted Sheffield 14/04582/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

First-floor side extension over existing garage and single-storey rear extension to dwellinghouse

As published by the council, reference 14/04582/FUL

Application record

Reference
14/04582/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
17 Dec 2014
Validated
22 Dec 2014
Decided
13 Feb 2015
Ward
Darnall
Decision by
Delegated decision
Postcode
S13 9AX

Timeline

Dates from the published record

  1. 17 Dec 2014

    Received by Sheffield

  2. 22 Dec 2014

    Validated

    Checked as complete and ready for consideration.

  3. 13 Feb 2015

    Decision issued: Grant Conditionally

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Hendon Street Sheffield S13 9AX

    26/02295/FUL Submitted 31 Jul 2026 0m away

    92% historically approved · decision due ~25 Sep

    Erection of two-storey rear extension to dwellinghouse

    Awaiting decision Full applications Extension
    Domestic
  • Sports Ground And Pavilion Medlock Close Sheffield S13 9BA

    26/01232/FUL Submitted 27 Apr 2026 219m away

    92% historically approved · decision due ~31 Jul

    Erection of 56 dwellings including access, landscaping and associated infrastructure

    Awaiting decision Full applications
    Major scheme
  • Site Of Former 445 Handsworth Road Sheffield S13 9DD

    25/02748/FUL Submitted 16 Sep 2025 226m away

    Demolition of working mens club and erection of 27 apartments in 1 x 3 storey block with the provision of underground car parking accommodation and associated landscaping works (Application under Section 73 to vary condition no(s) 2 (approved plans) as imposed by planning permission 16/00480/FUL)

    Granted Full applications New dwelling Demolition 20 docs
    Major scheme
  • 4 Bramley Drive Sheffield S13 8TW

    23/03670/FUL Submitted 20 Nov 2023 233m away

    Erection of a 2-storey side extension with integral garage and single-storey front porch extension to dwellinghouse

    Granted Full applications Extension 7 docs
    Small domestic
  • The Old Rectory 402B Handsworth Road Sheffield S13 9BZ

    21/01552/FUL Submitted 3 Apr 2021 235m away

    Refurbishment of parish hall, including replacement roof and provision of ramped access, and installation of multi use games area (MUGA) with fencing, floodlighting and access

    Granted Full applications Roofing 24 docs
  • Jeffcock Memorial Drinking Fountain And Water Trough Handsworth Road Sheffield S13 9BX

    14/03686/COND1 Submitted 3 Feb 2015 236m away

    Application to approve details in relation to condition number 3. Foundation details, Method Statement, Timetable and Record of current location of planning permission 14/03686/LBC

    Decided Conditions 17 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications