Planning application
Plot 1 Chapel Lane Parbold Lancashire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Formation of internal pedestrian tracks, car parking/turning area and siting of storage container (retrospective).
As published by the council, reference 2026/0346/FUL
Application record
- Reference
- 2026/0346/FUL
- Type
- Full Planning Application
- Status
- Registered
- Received
- 27 Apr 2026
- Validated
- 18 May 2026
- Ward
- Rural North East Ward
- Parish
- Parbold
- Decision by
- Delegated unless Member request to Cttee
Timeline
Dates from the published record
-
27 Apr 2026
Received by Sefton
-
18 May 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Sefton took a median of 62 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
ML Planning Consultancy Ltd Agent, a planning consultancy
328 applications on PlanIndex · across 27 councils · 82% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
- Email to applicant from network rail
- Network rail response
- Network rail response
- Applicant response to network rail
- Network rail
- Mrs moira fry-crossing cottage chapel lane parbold-supports(full)
- Mrs kay porter-crooke marina shevington wigan-supports(full)
- Mr darrel callanan-26 prestbury avenue, marus bridge marus bridge wigan-supports
- Highways response
- Canal and river trust response
- Miss elisha grayson-12a malvern street standish, wigan-supports(full)
- Mr michael anthony-43 lindley drive parbold wigan-supports(full)
- Mr jonathan abbey-greenacres,998 whittingham lane preston-supports(full)
- Mr jonathan moss-chapel house barn chapel lane parbold-supports(full)
- Site layout and container plans
- Mr ian morgan-8 wood lane parbold wigan-objects(full)
- Site notice
- Consultation/neighbours notified
- Application form - without personal data
- Design and access statement
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Sefton for determination, against a statutory target of eight weeks. Over the last year Sefton decided full applications in a median of 77 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
28 Wood Lane Parbold Wigan Lancashire WN8 7TH
97% historically approved · decision due ~29 Sep
Certificate of Lawfulness (Proposed) - Erection of an oak carport structure and minor landscaping works to existing driveway.
Awaiting decision Lawful development 3 docs -
28 Wood Lane Parbold Wigan Lancashire WN8 7TH
96% historically approved · decision due ~29 Sep
Certificate of Lawfulness (Proposed) - Erection of an oak carport structure and minor landscaping works to existing driveway.
Awaiting decision Lawful development 3 docs -
15 Bramble Way Parbold Wigan Lancashire WN8 7HZ
Approval of details reserved by condition 4 of planning permission 2026/0035/FUL relating to demolition timetable/phasing plan.
Granted Conditions Demolition 3 docs -
2 Wood Lane Parbold Wigan Lancashire WN8 7TH
Approval of Details Reserved by Condition No. 7 of planning permission 2019/0418/FUL relating to a scheme for the provision of an electric vehicle charging point.
Granted Conditions 2 docs -
2 Wood Lane Parbold Wigan Lancashire WN8 7TH
Approval of Details Reserved by Condition No. 7 of planning permission 2019/0418/FUL relating to a scheme for the provision of an electric vehicle charging point.
Granted Conditions 2 docs -
5 Bramble Way Parbold Wigan Lancashire WN8 7HZ
Part single/two storey extension to the side, single storey extension to the rear following the demolition of the existing conservatory to the rear and the existing single storey kitchen to the sid...
Withdrawn Full applications Extension Demolition 25 docsSmall domestic
Other full applications
In Sefton
-
2026/0139/FUL Withdrawn
Land At Rothwell Drive Aughton Lancashire
The proposed development for this site is for the addition of 9 communal parking bays to Rothwell Drive, Aughton.
-
2026/0061/FUL Refused
93A - 93F Burscough Street Ormskirk Lancashire L39 2EL
Replacement of all external timber doors and windows with like-for-like units, replicating original proportions, detailing, and finishes. Doors will include double-glazed panels and restored ironmongery.
-
2026/0602/FUL Granted
5 Broad Hey Close Lathom Skelmersdale Lancashire WN8 8BY
Construction of a single storey rear extension and partial garage conversion.
-
2026/0395/FUL Granted
4 Ivy Cottages Clieves Hills Lane Aughton Ormskirk Lancashire L39 7HP
Construction of an infill extension to connect the host dwelling to the existing outbuilding at the rear, following demolition of the existing rear extension, together with associated external alterations and landscaping works.
-
2026/0593/FUL Granted
Greens Lane Farm Greens Lane Downholland Lydiate Liverpool Lancashire L31 4HZ
Conversion of a redundant agricultural building at Greens Lane, Lydiate for the storage of either classic/vintage cars, or boats or caravans.