Planning application
The Saddlery Ash Brow Newburgh Lancashire WN8 7NF
Works: Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing equestrian buildings and the construction of two dwellings.
As published by the council, reference 2025/0724/FUL
Application record
- Reference
- 2025/0724/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Planning Permission Granted
- Received
- 20 Aug 2025
- Validated
- 22 Aug 2025
- Decided
- 5 Aug 2026
- Ward
- Rural North East Ward
- Parish
- Newburgh
- Decision by
- Delegated unless Member request to Cttee
- Postcode
- WN8 7NF
Timeline
Dates from the published record
-
20 Aug 2025
Received by Sefton
-
22 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
5 Aug 2026
Decision issued: Planning Permission Granted
Who's behind it
Company information only, from the register and Companies House
Emery Planning Agent, a planning consultancy
114 applications on PlanIndex · across 28 councils · 79% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
96 documents on file for this application
- Decision-full planning - approved
- Committee report
- revised plans
- revised plans
- Mr william moss -ashdene, ash brow newburgh wigan-neutral(full)
- Ms julie cheston-spring cottage ash brow newburgh wn8 7ng-objects(full)
- Growth lancashire
- Drainage
- Mr phil corfield-old post office farm ash brow newburgh wn87nf-objects(full)
- Environmental
- Lcc highways response
- Updated bng metric
- Updated bng
- Proposed public right of way
- Updated heritage statement
- Public right of way
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Revised plans/elevations
- Mr stan irwin-19 hartley crescent, c/o merseyside & west lancashire bat group so
- Tree officer comments
- Revised bng metric
- Revised bng info
- Ms andrea bell-2,the green ash brow wigan wn8 7nf-objects(full)
- Parish council sandra jones-10 priory close burscough ormskirk l40 7uy-objects(f
- Garry howard - greenhill farm, ash brow, newburgh
- Philippa howard - greenhill farm, ash brow, newburgh
- Mr phil corfield-old post office farm wn8 7nf wn8 7nf-objects(full)
- Mrs janet corfield-old post office farm wn8 7nf wn8 7nf-objects(full)
- Growth lancashire
- Drainage
- Mr garry howard-greenhill farm ash brow newburgh wn8 7ng-objects(full)
- Julie cheston - spring cottage, ash brow, newburgh
- Mr alexander beswick-19 new acres newburgh wigan wn8 7tu-objects(full)
- Mr mark davies-brookside higher lane dalton wn8 7tw-objects(full)
- Mr chris hayes-12 cobb?s brow lane newburgh wigan wn8 7nd-objects(full)
- Dr dawn ellams-sundew cottage ashbrow newburgh wn8 7nf-neutral(full)
- Dawn ellams-sundew cottage ashbrow newburgh wn8 7nf-objects(full)
- Mahdi shavazi-old post office farm house newburgh wn8 7nf-objects(full)
- Lcc prow response
- Carl & hayley sheard, 57 ash brow, newburgh
- Liam loughhead, 1 the green, ash brow newburgh, wigan, wn8 7nf
- Bat emergence survey
- Mr carl sheard-braden cottage 57 ash brow newburgh wn8 7nf-objects(full)
- Mr liam loughhead-1 the green ash brow wigan wn8 7nf-objects(full)
- Mrs leigh breton-26 abbey dale ormskirk l40 5su-objects(full)
- Mr martin sharrock-1-3 cobbs brow lane newburgh wn8 7nd-objects(full)
- Ms jenny taylor -28 cobbs brow lane newburgh wn8 7nd-objects(full)
- Mrs jane reeve-dark lane farm ormskirk l40 5tr-objects(full)
- Call in request
- Meas
- Ep comments
- Lcc highways response
- Merseyside and west lancs bat group
- Consultation/neighbours notified
- Site notice
- Bng metric
- Bng statement
- Preliminary ecological appraisal
- Ecology
- Heritage statement
- Transport statement
- Tree protection
- Tree constraints
- Redacted
- Site location plan
- Existing
- Proposed
- Appendix g - tree constraints
- Appendix f - legal
- Appendix e - guidance root protection
- Appendix d - tree fencing
- Appendix b - glossary
- Appendix a - schedule
- Aia
- Existing floor & elevation
- Planning statement
- Cover letter
- Flood risk assessment
- Proposed overlooking
- Existing
- Volume calcs
- Plot 2 - garage
- Plot 1 - garage
- Plot 2
- Plot 2
- Plot 1
- Plot 1
Trade members open them from here.
Open the documentsWhat this grant of permission means
Sefton granted permission on 5 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Saddlery Ash Brow Newburgh Lancashire WN8 7NF
Demolition of existing equestrian buildings and the construction of two dwellings.
Granted Full applications Demolition 96 docsSeveral homes -
1 - 3 Cobbs Brow Lane Newburgh Wigan Lancashire WN8 7ND
Approval of Details Reserved by Condition No. 6 of planning permission 2019/0847/FUL relating to details of the conservation rooflights.
Granted Conditions Loft or dormer 1 doc -
1 - 3 Cobbs Brow Lane Newburgh Wigan Lancashire WN8 7ND
Approval of Details Reserved by Condition No. 6 of Listed Building Consent 2019/0846/LBC relating to details of the conservation rooflights.
Granted Conditions Loft or dormer 1 doc -
1 - 3 Cobbs Brow Lane Newburgh Wigan Lancashire WN8 7ND
Approval of Details Reserved by Condition No. 6 of Listed Building Consent 2019/0846/LBC relating to details of the conservation rooflights.
Granted Conditions Loft or dormer 1 doc -
1 - 3 Cobbs Brow Lane Newburgh Wigan Lancashire WN8 7ND
Approval of Details Reserved by Condition No. 6 of planning permission 2019/0847/FUL relating to details of the conservation rooflights.
Granted Conditions Loft or dormer 1 doc -
The Red Lion 9 Ash Brow Newburgh Wigan Lancashire WN8 7NF
T1 cherry fell dead T2 maple crown lift to 5.5m to clear ground for delivery wagons. Crown reduce on building side to provide 2-3m clearance G1 - 2 fire damaged beech fell for safety reasons G2 - beech crown raise to 5.2m to clear carpark of low branches G4 - beech crown raise group to 5.2m to clear carpark of low branches
Granted Trees 2 docs
Other full applications
In Sefton
-
2026/0139/FUL Withdrawn
Land At Rothwell Drive Aughton Lancashire
The proposed development for this site is for the addition of 9 communal parking bays to Rothwell Drive, Aughton.
-
2026/0061/FUL Refused
93A - 93F Burscough Street Ormskirk Lancashire L39 2EL
Replacement of all external timber doors and windows with like-for-like units, replicating original proportions, detailing, and finishes. Doors will include double-glazed panels and restored ironmongery.
-
2026/0602/FUL Granted
5 Broad Hey Close Lathom Skelmersdale Lancashire WN8 8BY
Construction of a single storey rear extension and partial garage conversion.
-
2026/0395/FUL Granted
4 Ivy Cottages Clieves Hills Lane Aughton Ormskirk Lancashire L39 7HP
Construction of an infill extension to connect the host dwelling to the existing outbuilding at the rear, following demolition of the existing rear extension, together with associated external alterations and landscaping works.
-
2026/0593/FUL Granted
Greens Lane Farm Greens Lane Downholland Lydiate Liverpool Lancashire L31 4HZ
Conversion of a redundant agricultural building at Greens Lane, Lydiate for the storage of either classic/vintage cars, or boats or caravans.